CATHCART 9/13/07 1:22 PM Page 301

consideration to the owner’s budget. quality and performance help set us apart. justment project consisted of 40,000-
Cathcart’s managers work to help the Additionally, we have turnkey design- plus feet of large-diameter water, force
owner meet its budget requirements by /build capability and experience to han- and reclaimed mains installed prior to
helping them find reasonable solutions dle our client’s needs from start to finish. the commencement of a highway con-
to budget problems through value-engi- CT: Name some unique projects. struction project in a very congested
neering. Cathcart aims to give its clients MB: Fairview Shores Drive neighbor- right-of-way. Each run of pipe was set
exactly what they want, exactly when hood improvements (is) a charming down- on a finite line and grade with the
they want it and for exactly what they town Orlando 1950s-era community that expectation of future stormwater and
expected to pay for it. needed a refurbishment of its entire infra- highway improvements. The budget
It is our policy to complete all of our structure. (We) installed new sanitary se- was $5.2 million.
projects at or below Cathcart’s cost budg- wer, water mains, force mains, storm sew- CT: Name some distinguishing factors.
et. By setting the cost budget, diligently er, sidewalks and paving in an existing MB: (John) Cathcart and my expecta-
monitoring the actual costs and identify- neighborhood with little to no interrup- tions are very high, which pours over
ing budget variances early in the construc- tion to its residents. (The) $4.2 million into our people, which is seen in their
tion process, our team finds solutions to project was an open bid for which (we production, quality of life and compensa-
potential cost overruns before they be- were) the low bidder. The project finished tion. (For example), each general superin-
come actual cost overruns that affect the on time and on budget. The owner was tendent is supported by a project manag-
entire budget. Doing so helps us manage the city of Orlando. er and will typically manage three to
our projects efficiently, so our client can Maitland Boulevard off-ramp was an five projects each staffed with a job site
be assured that Cathcart will never assign exciting project we completed for the city superintendent and multiple foremen or
unwarranted change orders. of Maitland. It created a new southbound crew leaders.
CT: What are your keys to success? off-ramp from SR 414 onto US 17-92. It Each general superintendent manages
MB: Our expertise lives in our people, was a much needed improvement help- the budget, purchasing, profit and loss
from our general superintendents who ing alleviate traffic congestion into down- for each of his projects, sharing that
are considered to be (some) of the most town Maitland, while maintaining an ex- knowledge with his direct reports,
knowledgeable and professional in our isting bike trail with a pedestrian under- which makes work at (Cathcart) extreme-
industry, to our job site superintendents pass. Its budget was $3.8 million. ly exciting and rewarding for (those
and foremen whose attention to safety, (The) Polk County Road 54 utility ad- who are) well-prepared. ■

OCTOBER 2007 ■ CONSTRUCTION TODAY ■ 301