1.0Objectives
1.1 1.2 To troubleshoot sites which are experiencing weak signal coverage. To provide optimum signal coverage.

2.0Scope of Activity
2.1. Preparations of CDMA BTS Antennas and delivery to corresponding site. 2.2. Pre-drivetest. 2.3. Conducting of RX Level (received signal) measurements using BWL unit on various test points prior to the troubleshooting/change-out/cut-over activity (to be identified and performed on site by Network Operations). 2.4. Recording of results of RX Level (received signal) measurements. 2.5. Installation of new CDMA BTS antennas (3 sectors). 2.6. Blocking of existing site per sector. 2.7. Actual CDMA BTS antenna troubleshooting/change-out/cut-over per sector. 2.8. Conducting of test calls using BWL unit. 2.9. Conducting of RX Level (received signal) measurements using BWL unit on various test points after change-out/cut-over activity (to be identified and performed on site by Network Operations). 2.10. Recording of results of RX Level (received signal) measurements. 2.11. Post-drivetest and site optimization.

3.0Staff Arrangement
Listed below are the contact persons with their corresponding contact numbers for this activity.

Station
Network Operations Mindanao Network Operations Cagayan de Oro Network Operations Cagayan de Oro TAC BTI Engineering BTI Engineering

Contact Person
Leonardo G. Argoncillo

Contact Number/s
(6382) 301 9268

Evaristo V. Bilbao

(6388) 309 1152

Alvin R. Tumasis

(6388) 309 1101

Manny Gruezo/Albert Ongy Patjun Paul M. Palo Allan M. De Guzman

(632) 381 0032 (632) 482 8084 (632) 482 5006

4.0
4.1

Pre-conditions
All external jumper cables per sector must be properly labeled for easy identification. 4.2 No major alarms are present.

CDMA BTS Antenna Troubleshooting/Change-out/Cut-over Page 1 of 3

Method of Procedure NETWORK PLANNING & ENGINEERING


Document No.: Prepared by: Patjun Paul Palo/ Allan M. de Guzman Subject: Page 2 of 3

CDMA BTS Antenna Troubleshooting/Change-out/Cut-over


Checked by: Berlan T. Acebedo Approved by: John Joey T. Terrenal Issue No. 01 Issue Date: Supersedes:

5.0 Order of Work


Activity 1. Prepare/ship all the CDMA BTS Antennas and ancillaries needed for the change-out/cut-over activity. 1.1. 3 CDMA BTS antennas and ancillaries (brackets, rubber tapes and electrical tapes) for CDO004BRGY.KAUSWAGAN 1.2. 3 CDMA BTS antennas and ancillaries (brackets, rubber tapes and electrical tapes) for CDO015BUGO 2. Conduct pre-drivetest activity. 3. Conduct RX Level (received signal) measurements using BWL unit on preidentified various test points on site (test points to be identified on site by Operations) 4. Record RX level (received signal) measurements results. 5. Install 3 new CDMA BTS Antenna beside existing 3 CDMA BTS Antenna (ensure that azimuths are the same with the existing antennas) 6. Blocking of Sector 0 and cut-over from existing to new CDMA BTS Antenna 7. Unblocking of Sector 0, check for any alarm. Conduct troubleshooting if necessary. 8. Conduct test call using BWL unit if no alarm is present. 9. Blocking of Sector 1 and cut-over from existing to new CDMA BTS Antenna 10. Unblocking of Sector 1, check for any alarm. Conduct troubleshooting if necessary. 11. Conduct test call using BWL unit if no alarm is present. 12. Blocking of Sector 2 and cut-over from existing to new CDMA BTS Antenna 13. Unblocking of Sector 2, check for any alarm. Conduct troubleshooting if necessary. 14. Conduct test call using BWL unit if no alarm is present. 15. Conduct RX Level (received signal) measurements using BWL unit Inclusive Dates Responsibility Area

Engineering

TAC Operations

Approved window time Approved window time Approved window time Approved window time Approved window time Approved window time Approved window time Approved window time Approved window time -

Operations Operations TNOC, Operations TNOC, Operations Operations TNOC, Operations TNOC, Operations Operations TNOC, Operations TNOC, Operations Operations Operations

CDMA BTS Antenna Troubleshooting/Change-out/Cut-over Page 2 of 3

Method of Procedure NETWORK PLANNING & ENGINEERING


Document No.: Prepared by: Patjun Paul Palo/ Allan M. de Guzman Subject: Page 3 of 3

CDMA BTS Antenna Troubleshooting/Change-out/Cut-over


Checked by: Berlan T. Acebedo Approved by: John Joey T. Terrenal Issue No. 01 Issue Date: Supersedes:

on pre-identified various test points on site (test points to be identified on site by Operations) 16. Record RX level (received signal) measurements results. 17. Conduct post-drivetest and site optimization

Operations TAC

5.0 Restoration / Fallback Procedures


Should there be a problem encountered during any of the activity stated above, the activity will be discontinued. Revert back to original configuration. Diagnose and then troubleshoot the cause of problem.

6.0 Job Demarcation


This activity will be implemented by BTI Local Ops, TAC and TNOC.

7.0 Sites Involved


7.1 CDO004BRGY.KAUSWAGAN
7.2 CDO015BUGO