Sie sind auf Seite 1von 6

JAWAHAR LAL NEHRU TECHNOLOGICAL UNIVERSITY ANANTAPUR

ANANTAPUR-515 002 (A.P)


***
RESEARCH AND DEVELOPMENT CELL

SCHEDULE OF 3RD RESEARCH REVIEW MEETING (RRM-3)


Sl.
No.
1.

19.1.2012
F.N.

Admn./H.T.No.
of the candidate
10PH0101,102,103,104,105,106
0900PH0101,102,103,104,105,106,107,108,109,
110,111,112,
0803PH0522,523,524,525,526,531
0703PH0525,530
0603PH0511,*513,514,516,522
0503PH0502,503,505
04Ph.D0108
03Ph.D0102,103,104,108
10PH0201,202,203,204,205,206,207,208,209,
210,211,212,213,214,215,216,217,218,219,
220,221
0900PH0201,202,203,204,205,206,207,208,209,
210,211
0803PH0713,0803PH0775
0703PH0718,727, *730,*731,734,737,748,
0603PH0714,715,728,729,749,753,754,756
0500PH0702
03Ph.D0202
400744EE/PH
10PH0301,302,303,304,305,306,307,308,309,
310,311,312,313,314,315,316,317,318,319,320.

19.1.2012
A.N.

10PH0321,322,323,324,325,326,327,328,329,330,331,
332,333,334 ,336,337,338,339,340.

20.1.2012
F.N.

0900PH0301,302,303,304,306,307,*308,309,*310,
311,312,313,314,315,316,317,318,319,320,*321.

(20)

20.1.2012
A.N.

0900PH0322,323,324,325,326,327,328,*329,330,331,
332,333,334,,336,337,338,*339,340,341.

(20)

20

21.1.2012
F.N.

0900PH0342,343,344,345,346,347,348.
0803PH1511,1513,1514,1515,1521,1522,
1532,1539,1546,1550,1551,1553,1554.
080PH1571,1577,1594,15A2
0703PH1516,1524,1525,1526,1538,1543,1548
06003PH1527,1535,*1541,1542,1545,1551,1554,
1559,*1570
05Ph.D0301

(7)
(13)

20

(4)
(7)
(9)

21

Discipline

Date of RRM

Civil
Engineering.

19.1.2012
F.N.
19.1.2012
A.N.

2.

Electrical
Engineering

19.1.2012
F.N.
19.1.2012
A.N.

20.1.2012
F.N.

3.

Mechanical
Engineering

21.1.2012
A.N.

Venue
(6)
(12)
(6)
(2)
(5)
(3)
(1)
(4)
(21)

(11)
(2)
(7)
(8)
(1)
(1)
(1)
(20)

( 19 )

18

21

Civil
Engg.
Department
Seminar
Hall

21

20

Electrical
Engineering
Department
Seminar
Hall

11

20

19

20

Mechanical
Engineering
Department
Seminar
Hall

(1)

Contd....2

-2 4.

E.C.E.

19.1.2012
F.N.

10PH0401,402,403,404,405,406,407,408,409,
410,411,412,413,414,415,416,417,418,419,
420.
10PH0421,422,423
0900PH0401,402,403,404,405,406,407,408,409,
410,411,*412,413,414,415,416,417.
0900PH0418,419,420,421,422,423,424,*425,426,
427,428.
0803PH08A1,08A18,08A20,0822,08A36,
*08A38,08A39,08A49,0859
0803PH0868,0881,*0885,0886,0888,0889,0890
0703PH0827,830,*841,845,851,860,863
0603PH0824,*827,845,848,851,859,862
05Ph.D0407
10PH0501,502,503,504,505,506,507,508,509,
510,511,512,513,514,515,516,517,518,519,520.

(20)

19.1.2012
A.N.

10PH0521,522,523,524,525,526

(6)

0900PH0501,502,503,504,505,506,507,508,509,
510,511,512,513,514

(14)

20.1.2012
F.N.

0900PH0515,516,517,,518,519,520,521,522,523,
524,525,526,527,528,529,530
0803PH0612,668,672
0703MS0614,
0703MS615,0703PH0623,657,674,675
0603PH0602,612,616,617,658
05Ph.D0501,0503PH0613

(16)

04Ph.D0503

(1)

10PH0601,602,603,604,605,606,607,608

(8)

0900PH0601,602,603,604

(4)

*0703MS0311
10PH1101,102,103,104,105,106,107,108,110,111

(1)
(10)

0900PH1101,102,103,104,105,106,107,108
0803PH0236
*0703PH0240
*0603PH0245,*253

(8)
(1)
(1)
(2)

19.1.2012
A.N.
20.1.2012
F.N.

20.1.2012
A.N.

5.

C.S.E.

19.1.2012
F.N.

20.1.2012
A.N.

6.

7.

Chemical
Engg.

19.1.2012
F.N.

Bio-Tech.

19.1.2012
F.N.

(3)
(17)

(9)
(7)
(7)
(7)
(1)
(20)

(3)
(1)
(5)
(5)
(2)

English

19.1.2012
F.N.

10PH1401,10PH1402
0900PH1009,0900PH1010

(2)
(2)

9.

Mathematics

19.1.2012
F.N.

10PH0901,902,903,904,905,906,907,908,909,
910,911,10MP0901(M.Phil)
0900PH0901,*903,904,*905

(12)

0803PH1413,0803PH1414

(2)

10PH0701,702,703,704,705,706,707,708,709,
710,711,712
0900PH0701,702
0500PH1701
10PH0801,802,803,804,805,806,807,808,809,
810,811,812,813,814,815,816,817,818,819,820.
10PH0821,822,823,824
0900PH0802,803,804,805,806,807,811,
*812,*813,814,*815,816,817,818,819,820

(12)

0803PH04A9,439,460,466,482,485,*496
0703PH0424,434,472
0603PH0415,478,488,490

(7)
(3)
(4)

11.

Physics

Chemistry

19.1.2012
F.N.

19.1.2012
F.N.
19.1.2012
A.N.
20.1.2012
F.N.

20

(11)

8.

10.

20

(4)

(2)
(1)
(20)
(4)
(16)

ECE
Department
Seminar
Hall

20

22

20

20

20

CSE
Department
Seminar
Hall

13
13

22

18

15
20

20

Chemical
Engg.Dept.
Seminar Hall
Chemical
Engineering
Department
Seminar
Hall
Mgt.Dept.
Seminar
Hall
Science
Block
Seminar
Hall
Science
Block
Seminar Hall
Science
Block
Seminar
Hall

14

Contd....3

-312.

Management

19.1.2012
F.N.

10PH01001,002,003,004,005,006,007,008,009,010
0900PH1001,002,003,004,005,006,007,008,
0803PH01363
*0703PH1319,*1320

(10)
(8)
(1)
(2)

13.

Energy
Systems

19.1.2012
F.N.

0803PH0911,
0603PH0912

(1)
(1)

14.

Food Tech.

19.1.2012
F.N.

0900PH1201

(1)

0703PH2101

(1)

10PH1301,302,303,304,305,306,307,308,309,
310,311,312,313,314,315,316,317,318,319,320
10PH01321,322,323,324,325,326,327,328,329,330,
331,332,333,334,335,336,337,338,339,340
10PH01341,342,343,344,345,346,347,348,349,352,
353,354,355,356,357,358,359,360
0900PH1301,302
0900PH1303,304,305,306,307,308,309, *310,311,
312, *313, *314, *315, *316, *317,318,319,320,321,322.

(20)

20

(20)

20

15.

Pharmacy

19.1.2012
F.N.
19.1.2012
A.N.
20.1.2012
F.N.
20.1.2012
A.N.
21.1.2012
F.N.
21.1.2012
A.N.
22.1.2012
F.N.
22.1.2012
A.N.

23.1.2012
F.N.

Note: 1.
2.

3.

4.
5.

(18)
(2)
(20)

0900PH1323,324,325,326,329,330,331, 332,333,
(20)
334,335, *336,337,338, *339,340, *341,342, *343,344.
0900PH1345,346,347,348,349,350,351,352,353,
(20)
354,355,356,357,358,359,360,361, *362,363,364,
0900PH1365, *366,367,368, *369,370,371,372,373,
(20)
374,375,376,377, *378, *379,380,381, *382,383,384,
*0900PH1385,386,387,388,389,390,391,392,393,
(14)
394, *395,396,397,398,
0803PH22A41,0803PH2242,243,251,297,
(6)
0803PH22A19,
0803PH22A61,22A78,22A85,22A87,22B50,
(7)
22B85, 22C26
0703PH2228,231,*245,262,264,22A45,22A62,
(10)
22A73, *22B3, *2283
*0603PH0212,*0603PH0220
(2)

21

Management
Department
Seminar
Hall
EEE
Sem.
Hall
Science
Block
Seminar
Hall

20
20
20
20

Science
Block
Seminar
Hall

20

20

19

The review meetings will be held in the Forenoon (FN) session from 9.30am to 1.00pm and in
the afternoon (AN) session from 2.00pm to 5.00pm on the specified dates.
All Scholars must bring the hard copy of the Research Scholars Progress Report/Review
Form duly signed by the Supervisors (as per the format enclosed available on the
University website:www.jntua.ac.in).
All Research Scholars are requested to make their own arrangements for boarding
and lodging during the above period. Scholars are advised to stay one more day,
if required.
If the research scholars does not attend two consecutive meetings and if the reports are
not satisfactory in two consequent meetings, the admission is liable to be cancelled.
The Research Scholars those who have not atended two consecutive RRMs are indicated with
a * against their Admn.No. are hereby informed that they are being a final chance and
they do not attend for this RRM their admission stands cancelled.
Sd/Director i/c
Research & Development Cell

if

E-mail:jntuarand@gmail.com

Phone: 08554-273006

JAWAHAR LAL NEHRU TECHNOLOGICAL UNIVERSITY ANANTAPUR


ANANTAPUR-515 002 (A.P)
RESEARCH AND DEVELOPMENT CELL

Rc.No.R & D Cell/3rd RRM/Notification/2011-12

Office of the Director


R & D Cell,
JNTUA,
Anantapur 515 002
Dt. 27-12-2011

IMPORTANT CIRCULAR/NOTICE
It is hereby informed that the Research Review Meeting (RRM) will be scheduled from
01-2012 to 23-01-2012.

19-

All the research scholars admitted during 2010-11, 2009-10, and others who were admitted
prior to 2009 with erstwhuile JNT University and opted to this University, are hereby informed to
attend the RRM without fail and come prepared for presentation of their work. They have to inform
their Supervisor and Co-supervisor also to attend the meeting without fail as it is mandatory. Also
get the hard copies of your publications, if any, which are to be submitted along with the progress
review form.
The detailed schedule is enclosed herewith.

Note: 1.

2.

3.

4.

All the research scholars must bring the hard copy of the Research Scholars
Progress Report/Review Form duly signed by the Supervisor and Co-supervisor
(as per the format available with schedule on the University website: jntua.ac.in).
All Research Scholars are requested to make their own arrangements for boarding
and lodging during the above period. Scholars are advised to stay one more day,
if required.
The supervisor and co-supervisor also should attend the meeting along with the
candidate and the candidates have to bring this to the notice of their supervisor and
co-supervisor as it is mandatory. No TA/DA will be paid to the Supercvisor/
Co-supervisor.
If the research scholar does not attend two consecutive meetings or if the progress re
is not satisfactory in two consequent meetings, the admission is liable to be
cancelled.
Sd/Director i/c
Research & Development Cell

JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY ANANTAPUR


ANANTAPUR-515 002.(A.P.) INDIA
Research and Development Cell
Administrative Block, ANANTAPUR-515 002

RESEARCH SCHOLARs PROGRESS REPORT - REVIEW FORM


Date of RRM:

/2011

1). Name of the Candidate:


2) A) Present Official Address:

B) Address for Communication:

E-mail:
Tel: (O):
3). Degree Registered:

M.S.

( R):
/ M.Phil

/ Ph.D.

(M)
(Tick the program)

4). Faculty/Department with which registration is made: (Tick the appropriate faculty)
CIVIL ENGG / EE/ ECE/ CSE/ CHEMICAL ENGG/ MECH ENGG/ BIO-TECH/
FOOD-TECHNOLOGY/ PHARMACY/ ENERGY SYSTEMS/MATHS/ PHYSICS/
CHEMISTRY / ENGLISH/MANAGEMENT
5). Year of Registration: __________
Admn./H.T.No.:__________________
6). Name of the Supervisor with Contact Address and E-mail:
Name:
Address:

Designation:

Email:

Phone:

7).Name of the Co-Supervisor, if any, with Contact Address and E-mail:


Name:
Designation:
Address:
Email:

Phone:

8). Title of Research Work (as registered, at the time of Admission) :

9). Is there any Change of Title or Change of Topic or Change of Supervisor (s)? (YES/NO)
If so, give details on separate sheet, attaching the copy of the letter for such permission(s)
(ENCLOSED/ NOT ENCLOSED)

10).Details of subjects selected for the pre Ph D Examination:


S.No Subj. Code
Title of the Subject
1.
2.

Status/year of completion

11). Whether fee paid upto date: (If so enclose receipts):12). Status of work of the Research Work and Progress:
A) LITERATURE SURVEY:
% covered so for
:___________________
No. of Technical Papers Referred (relevant to the topic) :___________________
List of Referred Technical Papers (with Journal Name, Vol. No.,
Issue No., Year/Month of Publication, Page Nos. etc) to be shown. (YES/NO)
Remarks
:________________________________________________________________
________________________________________________________________
B) Type of Research Work & Progress:
EXPERIMENTAL WORK/ THEORETICAL STUDY /SIMULATION / SYNTHESIS/
or ANY OTHER VARIATION
(Tick mark one or mention if combinations are considered)
%age of work COMPLETED SO FOR :__________________________________
Remarks:______________________________________________________________
________________________________________________________________

C) Nos. of Technical Publications (relevant to Research Topic) :


(Publications should contain Research Scholars Contributions alone, after
Date of Registration for Ph.D./M.Phil./M.S.)
in INTERNATIONAL JOURNALS
:_____________
in NATIONAL JOURNAL
:_____________
in INTERNATIONAL CONFERENCES :_____________
in NATIONAL CONFERENCES
:_____________
(Attach the LIST OF PUBLICATIONS in a SEPARATE SHEET listing the Journal
Name, vol. No., Issue No., Year/ Month of Publication, Page Nos. etc): (YES/NO)
D) EXPECTED TIME OF COMPLETION :
* Within 6 months
* Within One Year
*
(Tick mark one or add your requirement)

Date:

More than One Year

SIGNATURE OF THE CANDIDATE

E) CERTIFICATION by the Supervisor (s) :


1) It is hereby certified that the INFORMATION, and DETAILS presented above are TRUE to
the best of our knowledge.
2) The Performance and Progress of Research Work of the Scholar are SATISFACTORY/ NOTSATISFACTORY.

Signature of Co-Supervisor
Signature of Supervisor
with Seal and Date
with Seal and Date
NOTE:
1) The Research Scholar should submit the above REPORT to the Research Review Committee on the
Day of RRM, for their endorsement and comments, and further onward transmission to the Director, R&D
Cell.
2) All Research Scholars are requested to make their own arrangements for boarding and lodging during the above
period. Scholars are advised to stay one more day, if required.
3) If the research scholar does not attend two consecutive meetings or if the reports are not satisfactory in two
consequent meetings, the admission is liable to be cancelled.

Das könnte Ihnen auch gefallen