Sie sind auf Seite 1von 2

JOB HAZARD ANALYSIS FOR INTERNAL CORROSION MONITORING

STEPS 1 DESCRIPTION OF TASK Mobilization and transportation of personnel and equipment by road and water HAZARD - Bad journey management - Un premobed vehicle - Uncertified driver - Bad road - Overloading - Faulty boat - High tidal wave - Boat mishap - Injuries (eyes and skin) - Flying particles - Inexperienced welder - Fire out break - Explosion - Bad house keeping RISK LEVEL CONTROL RECOVERY High Med Low X - Effective journey - Safety briefing management plan - Available backX - Premob of vehicle up vehicle X - Use of certified driver X - Normal weight loading X - No night sailing X - Confirm boat status and X condition before boarding X - All personnel to wear PFD X - Use certified welding - First aid X equipment Medvac X - Use appropriate welding X PPE X - Use certified welder - Provide fire extinguisher - Confirm metal thickness before welding - Gas detector/fire watch man - Use certified power brushing equipment - Use appropriate PPE - Use certified operator - Provide fire extinguisher - Barricading of operation site - First aid Medvac ACTION PARTY Management, safety coordinator

Welding (NEW POINT INSTALLATION)

Site supervisor/safety personnel

Power brushing (NEW POINT INSTALLATION)

- Injuries (eyes and X skin) as a result of flying metal and brush particles - Fire out break from sparks generated by brush/metal contact - Inexperienced operator

Site supervisor/safety personnel

Hot tapping (NEW POINT INSTALLATION)

- Faulty equipment - -Injuries to eye and skin - -Splashing/leakage of crude oil - -Inexperienced operator - Pipe under pressure - Environmental pollution - Injuries to eye and skin - Splashing of crude oil - Inexperienced operator - Bad installation - Spill - Splashing of crude - Equipment Damage - Injuries

Installation of coupons and probes

Equipment failure

X X X X

Demobilization from - Same as step 1 site and personnel

- Use certified operator - Close all bleed and drain valves - Use appropriate PPEs - Adherence to job procedure - Safe operation procedure (sop) - Containment - Gas detector in place - Fire fighting equipment - Use certified operator - Close all bleed and drain valves - Use appropriate PPEs - Adherence to job procedure - Employ stop work action - Check all valve position - Assess damage to equipment - Review procedure - Document failure as LFI - Same as step 1

- First aid Medvac

Site supervisor/safety personnel

- First aid Medvac

Site supervisor/safety personnel

- First aid Site Supervisor - Troubleshootin Safety personnel g - Evacuate (last resort) - Same as step 1

Das könnte Ihnen auch gefallen