Sie sind auf Seite 1von 5

CURRICULUM VITAE

Udmale Uday Narayan udayudmale@gmail.com 91-0241-2451192 Bhawani nagar, Near Government Polytechnic, Anagar Maharashtra - 442001

09970857433

Career Objective: To secure a challenging position where I can effectively contribute my skills as Civil Engineer, possessing competent Technical Skills.

Summary
Uday N. Udmale presently working in THERMAX LIMITED as Assistant Manager (AM).
Performing analysis and design of Power Plant structures Such as dynamic analysis of the TG deck, Dynamic Wind analysis of steel and RCC chimneys, Analysis and design of Pipe and cable rack. Scope of work includes preparation and review of code (Indian and International) driven design calculations; structural design, stress calculations. Also to interact with site to mobilize the project. Projects includes STG building, TG Deck, Boiler foundation structure, ESP foundations, Ash silos, Chimney, Crusher and Screen House, CHP tower Foundations, Pipe and cable racks, water treatment facilities, and other RCC structures.

I have completed my Post Graduation with specialization in Structural Engineering from Government College of Engineering, Karad and I have completed my Graduation in civil Engineering from Pune University with first class. I have qualified GATE 2005 Exam.

Academic Credentials M.E (Civil - Structural Engg.) Government College of Engineering, Karad Shivaji University, Kolhapur. Examination M.E B.E. Civil. Diploma S.S.C. Year 2008 2005 2002 1998

B.E. (Civil) P. D. V. V. P. College of Engineering, Ahmednagar. Pune University, Pune. % Marks 72.72 60.33 68.00 68.58 Class First with Distinction First First First

Training and Workshop Attended Earthquake Engineering Review Workshop organized by IIT Kanpur in Aug 2006.

Computer Knowledge Design Software: STAAD Pro, SAP2000, Etabs. Drafting Software: AutoCAD Microsoft office, Macro writing in Excel. Seminar during Post-graduation M.E. I - Design of R. C. C. chimney. M.E. II - Static Pushover Analysis Vs Dynamic Collapse Analysis. M.E. Dissertation: Static Pushover Analysis Vs Dynamic Collapse Analysis. Seminar during Graduation Study of Corrosion of Reinforcement bars used in concrete. Project during Graduation Effect of Replacement of Natural Sand by Stone Crusher Dust In R. C. Concrete. Work Experience Working as Senior Executive Engineer in Thermax. Ltd. Pune. Duration: 12th Oct.2009 to Till date.

Project handled:
1 x 30 mw Coal based Captive Power Plant, M/s GULBARGA POWER Pvt. Ltd. 2x18mw Coal Based Captive Power Plant, JK Lakshmi Cement Ltd 1 x 30 mw Coal based Captive Power Plant, Sesa Goa Limited 1 x 27 mw Coal based Captive Power Plant, KJS Cement Limited Carryout Structural Analysis and Design (Including Earth Quake and Wind analysis) using Design of STG Building, Screen house, Crusher house Design of ash handling silos Pipe racks, Cable racks for power plant structures Design of machine foundations. The water retaining structures like clariffloculator, filter water tank, Clarified water storage STAAD-Pro.

tank etc

Design of the auxiliary water cooling towers Detailing of RCC and Reviewing & preparation of detailed engineering documentation Prepare Design Basis, Specifications, Bill of Quantities, Cost Estimates. Preparation of drawings & interacting with the programs to support design office Review & preparation of detailed fabrication (Shop) drawing, Structural Calculations. Preparation of Architectural drawing for power plant structures Analysis and Design of Steel chimney design as per IS 6533 and API 560 1 x 30 mw Coal based Captive Power Plant, Sesa Goa Limited 1 x 20 mw Coal based Captive Power Plant, KJS Steel Limited Captive Power Plant, ONGC Mangalore Petrochemicals Limited. Analysis and Design of RCC Chimney as per IS 4998 and Cicind for 1 x 27 mw Coal based Captive Power Plant, KJS Cement Limited 1 x 30 mw Coal based Captive Power Plant, M/s GULBARGA POWER Pvt. Ltd.

(drawings, calculations and reports).

requirements.

Worked as Assistant Design Engineer in STUP Consultant Pvt. Ltd. Navi Mumbai. Duration: 1 August 2007 to 10th Oct.2009.

Project handled:
Analysis and Design of Raft Foundation for RCC Double steel Flue chimney. Nagarjuna Thermal Power Project 2 X 507.5 MW at Udupi Dist. Karnataka. Hissar Thermal Power Project 2 X 600 MW at Hissar, Haryana. Rosa Thermal Power Project 2 X 300 MW (Phase-1) at Shahjahanpur (U.P.)

Analysis and Design of Intermediate Access Platform for 275m tall twin steel flue RCC chimney. Nagarjuna Thermal Power Project 2 X 507.5 MW at Udupi Dist. Karnataka.

Analysis and Design of Flue Support Bearing RCC chimney. Nagarjuna Thermal Power Project 2 X 507.5 MW at Udupi Dist. Karnataka.

Analysis and Design of Bottom flue Support Arrangement for Multi flue RCC chimney. Nagarjuna Thermal Power Project 2 X 507.5 MW at Udupi Dist. Karnataka. Hissar Thermal Power Project 2 X 600 MW at Hissar, Haryana. Fatigue Design and Preparation of Detail Drawing Flue Cans below expansion Compensator and Inlet Flue Duct for RCC chimney. Hissar Thermal Power Project 2 X 600 MW at Hissar, Haryana. Preparation of Detail Calculation for reinforcement required around Openings for RCC chimney Nagarjuna Thermal Power Project 2 X 507.5 MW at Udupi Dist. Karnataka. Hissar Thermal Power Project 2 X 600 MW at Hissar, Haryana. Rosa Thermal Power Project 2 X 300 MW (Phase-1) at Shahjahanpur (U.P.) Detail Quantity Calculation of Structural Steel and reinforcing Steel for RCC chimney Nagarjuna Thermal Power Project 2 X 507.5 MW at Udupi Dist. Karnataka. Raghunathpur Thermal Power Project 2 X 600 MW at Raghunathpur, West Bengal. Preliminary Analysis and Design of Windshield for RCC Twin Steel flue and Quadruple Steel flue chimney (Tendering Purpose only). Angul Captive Power Project 6 X 135 MW at Angul, Orissa. Analysis and Design of Support Platform for 275m tall triple steel flue RCC chimney. Sasan Ultra-Mega Thermal Power Project 6 X 660 MW at Sasan, Madya Pradesh.

Quantity Analysis of triple steel flue RCC chimney. Sasan Ultra-Mega Thermal Power Project 6 X 660 MW at Sasan, Madya Pradesh.

Checking design of RCC Staircase for Natural Draught Cooling Tower. Raghunathpur Thermal Power Project 2 X 600 MW Phase - I at Raghunathpur, West

Design of Ring Beam supporting Brick flue. Personal Information Date of Birth: 14th June1983 Gender: Marital Status: Languages Known: Male Married English, Hindi, Marathi. 1 No. 220M Tall Single Brick Flue RCC Chimney For 1 X 300 MW Captive Power Station, Butibori, District- Nagpur.

Declaration and Signature I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars. Place : Date : (Uday N. Udmale)

Das könnte Ihnen auch gefallen