Beruflich Dokumente
Kultur Dokumente
TERMINAL
TRIM
ULLAGES INNAGE BEFORE TAKEN AT ULLAGES INNAGE AFTER TAKEN AT SEA SUCTION SEALS
TANK N
GAUGES
m
CORRECTED GAUGE
1C 2C 4C 6C 7C 3P 3S 5P 5S
CORR 49,377 80,896 74,373 83,211 79,305 40,884 40,680 41,713 41,134
TRACE
NIL NIL
TRACE
0 0 0 0 28 0 0 46 0
BARRELS
T - 6A
BARRELS
6,00 M 9,00 M 0
VESSEL FIGURE CALCULATION
V.C. FACTOR GR.STD.VOLUME S&W% S & W VOL. NET STD. VOLUME T.C. VOLUME LONG TONS FACTOR G.S.V. LONG TONS
N.S.V. LONG TONS METRIC TONS FACTOR G.S.V. METRIC TONS N.S.V. METRIC TONS VSL. EXP.FACTOR
531,573
74
531,499 89.8
523,229
ROLLING MODERATED
3. Valves are not set by Saybolt personnel. Saybolt can assume no responsibility for same or for contents of pipelines 4. Cargo pumping terminated by
SHORE
RAFAEL PEREZ POSSO
VESSEL ' S OFFICER SAYBOLT REPRESENTATIVE
Page
of
11,00 M 11,00 M 0
VESSEL FIGURE CALCULATION
523,229 0.063 330 522,899 523,303 0.12644 66,157.07 66,115.35 0.12847 67,219.230 67,176.835 1.0010
Form SA # 18