Schedule of Rate for MESCOM SR 2010-11 (11kV System) Labour

Sl. No. Item.No.

Particulars

Unit

Labour charges 2010-11 (in Rs.)

1 1.1 1 2 3 1.1.1 1.1.2 1.1.3 1.2 4 5 6 1.2.1 1.2.2 1.2.3 1.3 7 8 9 1.3.1 1.3.2 1.3.3 1.4 10 11 12 1.4.1 1.4.2 1.4.3 1.5 13 14 15 1.5.1 1.5.2 1.5.3 1.6 16 17 18 1.6.1 1.6.2 1.6.3 1.7 19 20 21 1.7.1 1.7.2 1.7.3

Digging of Pits Digging of Pits 1.8 mtr depth for errection of 9 to 10 mtr Long Steel/ RCC/PSC supports as per approved Drawing. Ordinary Soil Hard Soil Hard latterite Soil Digging of Pits 1.5 mtr depth for errection of 7.5/8 mtr Long Steel/RCC/PSC/PCC supports as per approved Drawing. Ordinary Soil Hard Soil Hard latterite Soil Digging of Pits 2.0mtr depth for errection of 9.5mtr Long RCC supports (350Kg Working load for 33KV ) as per approved Drawing. Ordinary Soil Hard Soil Hard latterite Soil Digging of Pits 2.2mtr depth for errection of 11mtr Long RCC/PSC supports as per approved Drawing. Ordinary Soil Hard Soil Hard latterite Soil Digging of Pit 2.5 mtr depth for errection of 11mtr long tubular spun pole as per approved Drawing. Ordinary Soil Hard Soil Hard latterite Soil Digging of pit. For providing GI Pipe type Earthing Ordinary Soil Hard Soil Hard latterite Soil Digging of Pit for GUY SET Ordinary Soil Hard Soil Hard latterite Soil Note: For Hard Latterite Soil and Hard Rock Soil works have to be classified and certified by Executive Engineer, where ever these types of soil is encountered. Per pit Per pit Per pit 99 252 278 Per pit Per pit Per pit 231 906 1004 Per pit Per pit Per pit 575 1150 1150 Per pit Per pit Per pit 235 888 888 Per pit Per pit Per pit 209 662 788 Per pit Per pit Per pit 154 529 585 Per pit Per pit Per pit 191 654 726

Page 1 of 18

Sl. No. Item.No.

Particulars

Unit

Labour charges 2010-11 (in Rs.)

Concrete works 1.8 Providing cement conccrete to poles and Guy sets with material and labour including necessary curing etc., complete (cost does not include excavation) A) Base concrteing with CC 1:4: 8 a) Pole base for 9.5/9/8 mt supports (500x650x150mm) b) Pole based for 9mtrs square pole (650x650x150mm) c) Pole base 11mtr spun pole (1000x1000x150mm) B) Pole concreting with CC 1:2:4 (without coping) 25 26 27 28 1.8.2 a) 9mtrs support (500x500x1700mm) b) 9.5 mtrs support (500x500x1850mm) c) 8mtrs support (400x400x1680mm) d) Guy concreting with Boulders, Mud & Sand As per Drawing C) providing coping for pole with CC 1:2:4 (As per actuals) 29 30 1.8.3 a) 150mm around poles for a height of 300mm for RCC,PSC,PCC poles/ I-beam/ Rail steel sections b) 390mm all around the pole for an height of 300mm for Spun poles D) Guy concreting in Marshy area 1.8.4 31 a) Providing cement concrete 1:2:4 for Anchor Rod in Marshy/Black Cotton Soil 600x600x450mm Erection of Poles Note: the rates mentioned is only for errection and excavation charges shall be paid separately as per Sl.No. 1.1 to 1.7.3 as applicable. Erection of steel supports 9.0 to 10.00 mtr long such as 22.68 kg(50 lbs) Rail, 27.22 kg (60 Lbs) Rail I Beam of sizes 200x100mm, 175x90 mm, 125x100 mm. Fabricates poles tubular poles in pits of 1.8 mtr Depth, Aligning, Refilling with soil and ramming as Same as above but erection of 7.5 to 8.0 mtr long steel supports (18.75 kgs., /41Lbs) Rail, 125x75 mm, Ibeam in pit of 1.5 mtr depth. Same as above but erection of RCC/PCC/PSC poles of 7.5 to 8 mtr long in pit of 1.5 mtr depth. Erection of RCC/PSC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth Erection of RCC poles 9.5 mtr long 350Kg WL but in a pit of 2.0 mtr depth for 33KV lines Errection of 11 mtr PSC pole with working load of 365kg in a pit of 2 mtrs depth. each each 200 520 each each each each 1624 1767 935 52

22 1.8.1 23 24

each

142

each each

185 437

each

620

32

2.1

Nos.

154

33

2.2

Nos.

137

34 35 36 37

2.3 2.4 2.5 2.6

Nos. Nos. Nos. Nos.

275 345 485 550

Page 2 of 18

Sl. No. Item.No.

Particulars

Unit

Labour charges 2010-11 (in Rs.)

38

2.7

Erection of 11mtr long Concrete spun pole in a pit of 2.5 mtr depth. Erection of 2 pole structure formed out of SM rails or I -Beam of sizes 200x100 175x90 mm, 225x100mm of 9 to 10 mtr long in pits of 1.8 mtr depth for line deviation with necessary foundation, inclusive of fixing of cross Arms, Braces, Strain Insulators. Same as above using RCC poles 9 mtr to 10 mtr long Same as above using RCC poles 7.5/8 mtr long in pits of 1.5 mtr depth. providing spiral earth electrode type earthing along with pole (without charcoal, salt etc.,) Errection of H Frame. Transformer Platform: Erection of Double pole transformers structure including fixing of structural

Nos.

615

39

2.8

Per structure

964

40 41

2.9 2.10

Per structure Per structure Nos.

1263 1263

42

2.11

28

43

2.12

Nos.

97

44

2.13

materials, erection of poles etc., complete for mounting of transformers as per approved drawing using I-Beems or MS Rail 8 mtrs. long.

Per structure

1266

45

2.14 2.15 2 15

Same as item No. 9 with RCC pole 9/8 mtr. long. Upto U t 63 kVA with 9 mtrs. RCC pole with 8 mtrs. RCC pole 100 to 250 kVA with 9 mtrs. RCC pole with 8 mtrs. RCC pole Above 250 kVA with 9 mtrs. RCC pole with 8 mtrs. RCC pole Erection of single pole mounted Transformer structures for 250 kVA Transformer on the existing 11 mtrs. Spun pole (excluding erection of pole) for 100 kVA on the existing 9 mtrs. RCC pole (squre section) (excluding erection of pole) for 25/63 kVA on the existing 9 mtrs. RCC pole (square section) (excluding erection of pole) 3 Pole structure: Erection of 3 pole structure formed with 3 Nos 9 mtr RCC Pole with platform for mounting 100 to 500 kVA transformers as per approved Drawing including fixing structure materials, erection of poles etc., complete. (excluding excavation c 4 Pole Structure: Erection of 4 pole structure formed with SM Rail or I Beam of size 200x100 mm 175x90 mm, 225x100 mm size, 9 to 10 mtr long pits for line deviation with necessary foundation, including fixing of cross arm, braces, strain/disc insulators. Erection of 4 Pole structure as in item, 11, with platform for mounting of Transformer. (excluding excavation charges) Per structure Per structure Per structure 1028 514 514 Per structure 1946 1743 Per structure 1761 1623 Per structure 1699 1493

46 47

2.15.1 2.15.2 2.16

48 49

2.16.1 2.16.2 2.17

50 51

2.17.1 2.17.2 3

52 53 54

3.1 3.2 3.3

55

3.4

Per structure

2598

56

3.5

Per structure

2145

57

3.6

Per structure

2456

Page 3 of 18

Sl. No. Item.No.

Particulars

Unit

Labour charges 2010-11 (in Rs.)

58

Construction of platform with size stone, cement concert for erection of 500 kVA Transformer/Heavy Equipment. Construction of platform (1.5x1.5x1.2) mtr in size stone, for erection of transformers/Heavy equipment including all materials, labour. Excavatio

Per structure

14312

59 60 61

4.1 4.2 4.3

Fixing of 2 Pin cross arm with insulator and Braces fixing Fixing of 4 Pin cross arm with insulator and Braces fixing. Fixing of V-Shape/Horizontal cross arm including single top support Braces and Insulators fixing. Fixing of V-Shape/Horizontal cross arm for DC Line including Braces and Insulators fixing. (Without Single Top Support) Fixing of 4 Pin double cross arm including braces and insulators. i l t Fixing of HT/LT single top support . Fixing of Earth Guard Stirrup Fixing of Anticlimbing Device Spike Type G.I. Barbed Wire (12 mtrs/1kg) a) Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT) b) Same as above but using 2 strain insulators (No.15) Fixing guarding including fixing of necessary cross arms for existing HT and LT line at Road Crossing, Telephone Line Crossings up to span of 60 mtrs. Fixing guarding including fixing of necessary cross arms between HT and LT line up to a span of 40 mtrs. Above 40 Mtrs. Span Stringing of conductor wren, squirrel, weasel, binding of conductor on each insulator and dead ending on strain or disc/strain insulator by means of clamps. do - for Rabbit ACSR do - for Coyote ACSR Erection of Transformer

each each each

51 51 51

62

4.4

each

41

63

4.5

set

85

64 65

4.6 4.7 5

each Set of 2 nos

32 51

66 67

5.1 5.2

per set Nos.

12 13

68 5.3 69

per set

81

per set

90

70

5.4

per set

305

71

5.5

per set

305

72

5.6

per set per km/wire per km/wire per km/wire

536

73

5.7

967

74 75

5.8 5.9 6

1319 2304

Page 4 of 18

Sl. No. Item.No.

Particulars

Unit

Labour charges 2010-11 (in Rs.)

76 77 78 79

6.1 6.2 6.3 6.4

a) Erection of 25 to 63 kVA Transformer on Transformer structure. -do- 100 kVA Transformer -do- 200-250 kVA Transformer -do- 300-500 kVA Transformer Providing GI Pipe Earthing for lightning arresters Transformer Neutral and Transformer Metal parts (Excluding digging of pits) Hiring of crane for erection of 250/500 kVA Transformer (applicable for maintenance works only and in case of non -availability of departmental crane) Hiring of crane for releasing existing Transformer and erection of NEW 250 to 500kVA Transformers. (applicable for maintenance works only and in case of non -availability of departmental crane) HT Metering Construction of Platform as in item 15 for erection of HT metering cubicle. Erection of HT metering Cubicle on Platform. Erection of LT Feeder piller box including necessary E i f F d ill b i l di civil works like soil excavation & concreting etc. complete upto 8 ways above 8 ways Distribution Box for DTCs Fixing LT Distribution box for 100/ 250 / 500 KVA DTCs Additional cost for making termination using H/Wedge Clamps Rabbit to Rabbit Coyote to Coyote Rabbit to Coyote Additional cost for making termination using HClamps along with 2 hole Paddle/In-Line Connector/Micro wedge connector. Fixing Metering Box for housing the ETV Meter 3ph 4 wire along with CT's, Meter & wiring for DTC's 25/63 kVA TC 100 kVA TC 250 kVA TC 300/500 kVA TC Fixing 3-phase LT Capacitor housed in a enclosure with necessary Fuses, wiring, mounting arrangement for 15/25 kVA DTC, 3 kVAr 63 kVA DTC, 9 kVAr

each each each each per set of 3LA per electrode

345 460 690 920

80

6.5

59

81

6.6

Per Tr.

2500

82

6.7

Nos.

3000

7 83 7.1

Nos.

8871

84

7.2

Nos.

690

85 86 87

7.3 7.4 7.5 8

Nos. Nos.

500 541

88

8.1 9

Per box

230

89 90 91

9.1 9.2 9.3

Nos. Nos. Nos.

51 68 68

92

9.4

set

140

10 93 94 95 96 10.1 10.2 10.3 10.4 11 97 98 11.1 11.2

per set per set per set per set

580 580 580 580

per set per set

193 193

Page 5 of 18

Sl. No. Item.No.

Particulars

Unit

Labour charges 2010-11 (in Rs.)

99 100 101

11.3 11.4 11.5 12

100 kVA DTC, 18 kVAr 250 kVA DTC, 27 kVAr 500 kVA DTC, 54 kVAr Errection & Commmissioning of 11kV Auto reclosures and Sectionalizers with remote communication capability Errection of fabricated steel structure for Seating Auto reclosures and Sectionalizers Errection of 11kV Auto reclosures with control box GSM modem, connecting cable, control transformer, wiring testing and commissioning including parameterisation Errection of 11kV sectionalizers with control box GSM modem, connecting cable, PTs wiring testing and commissioning including parameterisation Fixing 9.6kV, 200A long duration porcelein house Surge arrestors Installing RLMU for the existing Distribution T.C including wiring for 25 kVA for 63 kVA for 100 kVA Fixing DOLO cutouts / Horn Gap Fuses including fixing of cross arms and wiring Fixing of GOS including wiring Fixing of 3 Nos lightning arrestors including wiring. Fixing Pole Fuse Board Fixing PVC pipe for taking the leads form the conductor to the pole fuse board (including taking the lead wire inside the PVC pipe & giving connection to the overhead line & pole fuse box/ Aerial fuse Board). Fixing of LT Line spacers Releasing & Refixing of over head service mains (single phase / three phase) for consumer installation and street lighting and similar work (While exicuting reconductoring work) Releasing & Refixing of over head service mains (single phase / three phase) for consumer installation and street lighting and similar work (While replacing existing pole) Fixing and Wiring of single phase meter on the existing meter board Fixing and Wiring of three phase meter on the existing meter board Street Light and Other Works Fixing and Wiring Incandescent street Light Fitting with two Clamps. Fixing and Wiring of FTL with suitable clamps bracket bolts and nuts using departmental material and departmental ladder vehicle under supervision of departmental Staff.

per set per set per set

227 266 278

102

12.1

per set

200

103

12.2

per set

1400

104

12.3

per set

1200

105

12.4 13

each

60

106 107 108 109 110 111 112

13.1 13.2 13.3 13.4 13.5 13.6 13.7

per set per set per set each set set/3 Nos. Nos

2466 2466 2466 40 222 36 44

113

13.8

set

67

114

13.9

Nos. Per connection

21

115

13.10

20

116

13.11

Per connection Per connection Per connection set

30

117 118

13.12 13.13

21 35

119

13.14

191

120

13.15

set

191

Page 6 of 18

Sl. No. Item.No.

Particulars

Unit

Labour charges 2010-11 (in Rs.)

121

13.16

Fixing and Wiring as SV/M.V light Fittins with suitable clamps Brackets, lamps, Bolts and nuts using departmental Materials and departmental Lader vehicle under supervision of departmental Staff. Fixing of Mercury Vapour Lamp fitting/ Ornamental Light Fitting with Contral Boxes etc., Fixing of LT Protection Kit (a) Wiring of One circuit of LT Wiring Kit for for 25/63/100 KVA DTC to the existing LT protection Kit Kit / Distribution Box via metering box. (b) Wiring of Two circuits of LT Wiring Kit for for 25/63/100 KVA DTC to the existing LT protection Kit / Distribution Box via metering box. Fixing One Circuit of LT Wiring Kit for 250/500 KVA Transformers via metering box. Surveying for construction of HT and LT Lines duly furnishing single line diagram indicating pole locations Numbering and Scheduling of poles Magpying (Excluding Cost of paint etc.,)

set

306

122 123

13.17 13.18

set Per Kit

224 104

124

13.19

Nos.

288

125

13.20

Nos.

460

126

13.21

Per Circuit

368

127

13.22

km

286

128 129

13.23 13.24

km km

216 86
90% of the Erection of RCC pole charge

130

13.25

Dismanting of Steel/ I- Beam

Nos.

131

13.26

Releasing of baliga pole

Nos.

85 % of the Erection of 8m RCC pole

14

Releasing & Restringing of loose spans, binding, straightening of inclined pole etc. a) Tightening of loose spans b) Weasel/ Squirrel c) Rabbit d) Cyote

132

14.1

km

90% of the corresponding stringing charge

133

14.2

Straightening of slant / bent poles

Nos.

75% of the corresponding erection charge

Note: Above works (3.53) has to be recorded in register maintained at SO/SD/Division office. Record has to be verified by Executive Engineer (Ele) before issuing approval for work orders /awards. 134 135 14.3 14.4 Dismantling of 2 B&S to I/O copper or equivalent Dismantling of copper conductor above 2 B&S. km km 380 612

136

14.5

Any Dismantling work

Nos.

90% of the corresponding Erection charge

15

Providing Coping with CC 1:2:4 proportion with necessary plastering, curing etc., complete

Page 7 of 18

Sl. No. Item.No.

Particulars

Unit

Labour charges 2010-11 (in Rs.)

137

15.1

150mm around poles for a height of 300mm for RCC, PSC, PCC Poles/ I-Beem/Rail steel sections. 390mm all around the pole for an height of 300mm for Spun Poles Providing cement concrete 1:2:4 for Anchor Rod in Marshy/Black Cotton Soil 600x600x450mm Jungle Clearing: 3 mtrs corridor (1.5 mtrs on either side of line) Trimming of trees and branches and clearing as per IE Rules. In Malnad/hilly areas if Jungle/trees/Plants/Shrubs exists only ( once in two years) In Maidan ( In accordance with necessity ) As above for construction of new line including Trimming of Trees, if Jungle/Tree/Plant/ Shrubs Exists. Malnad/Hill Area Maidan Area Cutting, Clearing of Vegetation Grass/shrubs such other small plants, including removal of Roots etc., in station yard/store yard. Maidan Area ( Twice in year) Malnad Area (Once in Three Months) Note: Locality allowance noted under Sl. No. 67 is not applicable to item No. 61 & 62 Transportation Rates:

Per coping

200

138

15.2

Per Coping

520

139

15.3

Nos.

620

16 16.1

140

16.1.1

km

1551

141

16.1.2 16.2

km

547

142 143

16.2.1 16.2.2 16.3

km km

2774 1658

144 145

16.3.1 16.3.2

sq.mtr. sq.mtr.

2.30 2.30

146 147

16.3.3 16.3.4 17

Transporation by Head Load Poles: for Transporting one pole (Not payable for distance less than 25 Mtrs) Conductor: For Transporting 1 km Length Conductor (Not payable for distance less than 25 Mtrs) Transformer: For Transportation 25 kVA Transformer (Not payable for distance less than 25 Mtrs). For Transportation 63 kVA transformer (Not payable for distance less than 25 Mtrs). For Transportation 100 kVA Transformer (Not payable for distance less than 25 Mtrs). Hire Charges (These charges have to be specifically approved by the Corporate Office in respect of repair to transformers when applicable) Nos. 150 per km 30 Nos. 70

148

17.1 18

149

18.1

150

18.2

Nos.

250

151

18.3

Nos.

250

19

152

19.1

Transportation using 7.5 /10 Tons Lorry

km

Rs. 16/km subject to minimum of Rs. 824 in a day

Page 8 of 18

Sl. No. Item.No.

Particulars

Unit

Labour charges 2010-11 (in Rs.)

153

19.2

Transportation using mini Lorry /Tempo

Km

Rs. 11/km subject to min of Rs. 600 upto 8 hrs

154 155

19.3 19.4

Loading of any type of material not covered specifically (cost includes crane charges if any). UnLoading of any type of material not covered specifically (cost includes crane charges if any). Loading of Power Transformer and other similar materials like switchgear cable drums, Drake /Lynx, conductors etc., (cost includes crane charges if any). Unloading of Power Transformer and other similar materials like switchgear cable drums, Drake/Lynx conductors etc., (cost includes crane charges if any).

MT MT

596 596

156

19.5

MT

661

157

19.6

MT

661

20

a) Loading and unloading of poles (loading of poles to vehicles at stores and unloading at workspot) 8 mtr RCC/PSC poles 9 mtr RCC/PSC poles 8 mtr PCC pole a) Loading of Transformer(when maintaince men for loading and unloading are not available in store) 25 kVA 63 kVA 100 kVA 250/300 kVA 500 kVA b) Un loading of Transformer 25 kVA 63 kVA 100 kVA 250/300 kVA 500 kVA Fixing of energy meter to non-metered I.P. sets 10HP and below: Including cost of materials like Meter Board, Channel cutouts and necessary wires required for the work. Fixing Single phase meter to IP Sets fixed inside Pump House Fixing 3 ph meter to IP Sets fixed in Pump House Fixing of mtrs. to IP sets, (where there is no pumphouse) where power supply is availed directly from the pole to the IP set and weather proof meter housing box is required (including cost of WP box). UG Cable Works Per IP Set Per IP Set 462 638 Nos. Nos. Nos. Nos. Nos. 115 115 173 288 575 Nos. Nos. Nos. Nos. Nos. 115 115 173 288 575 Nos. Nos. Nos. 35 46 29

158 159 160

20.1 20.2 20.3

20.4 161 162 163 164 165 20.4.1 20.4.2 20.4.3 20.4.4 20.4.5 20.5 166 167 168 169 170 20.5.1 20.5.2 20.5.3 20.5.4 20.5.5

21

171 172

21.1 21.2

173

21.3

Per IP Set

2134

22

Page 9 of 18

Sl. No. Item.No.

Particulars

Unit

Labour charges 2010-11 (in Rs.)

174

22.1

Earth work excavation for cable trench of 0.5 to 0.75 mtr. Width and Depth upto 1 mtr. including trial pits, depositing on bank upto a lead of 50 mtrs, Supplying and Displaying necessary Danger Boards and Lighting, Using sight Rails and Sign Boards at eve In Ordinary Soil In Hard Soil In Ordinary Rock without Blasting In Ordinary Rock with Blasting Hard Rock/Latterite Rock latterite Soil cmt cmt cmt cmt cmt 102 125 138 227 558

175 176 177 178 179

22.2 22.3 22.4 22.5 22.6

Page 10 of 18

Sl. No. Item.No.

Particulars

Unit

Labour charges 2010-11 (in Rs.)

*Soil classification has to be certified by the concerned Executive Engineer Elc. Note: 20% over & above may be given if depth is more than 1m Refilling the cable trenches with selected available earth from trench excavation including watering, consolidation in layers of 15 cm. Thickness including depositing of the surplus earth with a lead of 200 Mtrs. Cutting of Road surface for cable trenches and disposing of the excavated earth, as directed including Barricading, Danger Lighting then Refilling the Cable Trenches. Macadam Road Tar Road Cement Concrete Road Removing the Existing Stone Slabs pavement and stocking the materials for excavating the trench with a lead of 50 mtr Refixing the stone slab after refilling the trenches as in item 2. Laying and Jointing the pipes (100-150 mm), dia including lowering in Position: Fixing Collars etc., Joining with mud mortor complete RCC Pipe Stone Ware Pipe Laying the GI Pipe 80mm to 150 mm dia at Drainage Water Supply Crossing including fixing collars elbows, bends, Tees and other fitting with Cuts and Threads wherever necessary complete. Removing and Refixing stone Masonary with necessary patch up and cementing drain works for Cluvert, Water Valve Crossing etc., including cost of materials. Covering cable with Tiles Spreading and forming with sand all round the cable to a depth of 75 mm and width of 500 mm. Removing the kerb Stones and Refixing at the original place with necessary earthwork. Fixing of Route Joint indicating Slabs. Transporting HT cable from Store to work spot including loading and unloading (including Crane and other equipment charges if any). 3x95 to 150 Sq. mm 3x185 to 3x240 Sq.mm 1x300 to 1x1000 Sq. mm (S.C. Cable) 3x300 to 3x500 Sq.mm -do- for LT Cables 2.5 to 25 Sq.mm (S.C. Cable 4 core 3.5 core) 35 to 95 Sq.mm (4 core/3.5 core) 120 to 240 Sq.mm ( 4 core/3.5 core) km (Cable) km (Cable) km (Cable) 500 1000 1100 km (Cable) km (Cable) km (Cable) km (Cable) 8096 9716 9716 11334 mtr mtr 28 22 cmt cmt cmt 182 300 603

180

22.7

cmt

32

22.8

181 182 183

22.8.1 22.8.2 22.8.3

184

22.8.4

sq.mtr.

81

185 186 187

22.8.5 22.8.6 22.8.7

188

22.8.8

mtr

32

189

22.8.9

cmt

420

190 191 192 193

22.8.10 22.8.11 22.8.12 22.8.13 22.9

km. km R. mtr Nos

1843 6475 6 48

194 195 196 197 198 199 200 201

22.9.1 22.9.2 22.9.3 22.9.4 22.9.5 22.9.6 22.9.7 22.9.8

Page 11 of 18

Sl. No. Item.No.

Particulars

Unit

Labour charges 2010-11 (in Rs.)

23

Laying of cable in Existing trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff. HT Cable 3x95 to 150 sq.mm 3x185 to 240 sq.mm 1x1000 sq. mm 3x300 to 3x500 sq.mm LT Cable 2.5 to 25 sq.mm 35 to 95 sq.mm 120 to 240 sq.mm Cable Joint and wiring( for HT Cable only) Epoxy straight through joint 3x95 to 3x150 sq.mm 3x185 to 3x240 sq.mm Nos. Nos. 700 700 Cable km Cable km Cable km 9043 13234 13514 Cable km Cable km Cable km Cable km 25343 26751 26751 28158

23.1 202 203 204 205 23.1.1 23.1.2 23.1.3 23.1.4 23.2 206 207 208 23.2.1 23.2.2 23.2.3 23.3 23.3.1 210 211 23.3.2 23.3.3

212

23.3.4

3x300 to 3x400 sq.mm

Nos.

700

23.4 213 214 215 23.4.1 23.4.2 23.4.3 24 24.1 216 217 218 24.1.1 24.1.2 24.1.3 24.1.4 219 220 221 222 223 24.1.5 24.1.6 24.1.7 24.1.8 24.1.9 25 224 225 226 227 25.1 25.2 25.3 25.4

Heat shrinkable straight through joint 3x95 to 3x150 sq.mm 3x185 to 3x240 sq.mm 3x300 to 3x400 sq.mm Making and Fixing pot head for HT Cable only Epoxy type 3x95 to 3x150 sq.mm 3x185 to 3x240 sq.mm 3x300 to 3x400 sq.mm Heat shrinkable type 3x95 to 3x150 sq.mm 3x185 to 3x240 sq.mm 3x300 to 3x400 sq.mm Releasing of HT cable after excavation refilling, consolidation Rewinding to the drum etc., -do- for LT cable Earth Excavation for R.M.U. Foundation Depositing of earth on Bank up to a lead of 50 mtr and with a lift up to 1.5 mtr Ordinary Soil In hard soil In ordinary Rock without Blasting In ordinary Rock with Blasting cmt cmt cmt cmt 102 125 140 225 Nos. Nos. Nos. km km 800 800 800 25342 8707 Nos. Nos. Nos. 700 700 700 Nos. Nos. Nos. 900 900 900

Page 12 of 18

Sl. No. Item.No.

Particulars

Unit

Labour charges 2010-11 (in Rs.)

228

25.5

Hard Rock/Lattirite Rock/Lattirite Soft Note: Soil classifications has to be made by respective Executive Engineer Refilling the RMU foundation with the approved new earth with initial lead of 50 mtr including watering and tamping layers of 15 cm thick etc., complete. Lifting of Excess Earth up to distance of 10 km Providing and Laying Granite or Basalt or trap jelly concrete 1:4:8 proporation using 40 mm and down size jelly for foundation laid in 15 cm thick layers and well compacted including curing complete (including material rate for cement , jelly, sand and la

cmt

558

229

25.6

cmt

30

230

25.7

cmt

117

231

25.8

cmt

2868

232

25.9

Providing and laying granite basalt or trap jelly cement concrete 1:2:4 proportion using 20 mm and down size jelly including Mixing laying Tamping. Curing and finished for exposed faces with necessary centering and form work etc., complete (including mate

cmt

3820

233

25.10

Providing and constructing granite or trap or basalt size stone masonary in stones hammer dressed in course not less than 20 cm high with bond stones 2 mtr apart in each course in cement motor 1:6 including curing etc., complete (including material i l di i t l t (i l di t i l rate f

cmt

2100

234

25.11

Providing and constructing granite or trap or basalt stone masonary in course not less than 15 cm high with bond stones 2 mtr apart in each course edges of stone chistle dressed and all quoins 2 line dressed 5 cms wide on each face (including material r

cmt

2493

235

25.12

Providing pointing to stone masonary in cement motor 1:3 after racking the joints to 2.5 cms and nicely lining curing etc., complete. Plastering concrete surface in cement mortar 1:4, 20 mm thick inclusive of smooth rendering curing etc., complete. Providing and constructing Brick Masonary with approved quality of Non-modular bricks of standard size with necessary scaffolding and curing for foundation complete 1. Transporting RMU unit from store to work spot including loading, unloading. 5 panels 1 panel 2. Fixing foundation frame of channels and angle iron welding fixing in concrete aligning the RMU on foundation bed, assembly of units, connecting Bus Bars from panel to panel initial filling of oil etc., complete. 5 panels 1 panel

sq.mt

48

236

25.13

sq.mt

123

237

25.14

cmt

3608

238 239 240

25.15 25.15.1 25.15.2

Nos. Nos.

6691 1296

241

25.16

242 243

25.16.1 25.16.2

Nos. Nos.

8369 1673

Page 13 of 18

Sl. No. Item.No.

Particulars

Unit

Labour charges 2010-11 (in Rs.)

244

25.17

Lettering the RMU with enamel paint and also writing single line diagram of each panel, caution Board, Danger Board etc., including cost of Paint, Brush etc., Cleaning of Bitumen type pothead bus joint (All sizes) Breaking and cleaning of straight through joint (All sizes) Sealing of cable ends including supply of plumbing lead, plumbing materials. PILC XLPE LABOUR for Aerial Bunched Conductor & Accessories Item Description Stringing of 11kV grade aerial bunched 3 core cable of XLPE insulation & black LDPE sheathing having a standard aluminum conductor, standard around a weather resistant black XLPE insulated AAA messenger wire 11kV size 3x95 sq.mm+1x70 sq.mm with bare messe Stringing of 11kV grade aerial bunched 3 core cable of XLPE insulation & black LDPE sheathing having a standard aluminum conductor, standard around a weather resistant black XLPE insulated AAA messenger wire 11kV size 3x120 sq.mm+1x95 sq.mm i i 3 120 1 95 with bare mess Stringing of 1.1kV grade aerial bunched 3 core cable of XLPE insulation standard aluminum conductor, standard around a weather resistant black XLPE insulated AAA messenger wire 1. (3x95) (for Phase conductor) + (1x70) (insulated messenger neutral) + (1x16 Stringing of 1.1kV grade aerial bunched 3 core cable of XLPE insulation standard aluminum conductor, standard around a weather resistant black XLPE insulated AAA messenger wire (size 3x50 sq.mm+1x16 sq.mm+1x50 sq. mm+1x35 sq. mm) 2. (3x95) (for Phase cond

per panel

352

245

25.18

Nos.

557

246 247 248 249

25.19 25.20 25.20.1 25.20.2 26

Nos.

557

Nos. Nos.

538 100

Unit

250

26.1

km

12051

251

26.2

km

12051

252

26.3

km

8961

253

26.4

km

8961

254

26.5

Stringing of 1.1kV grade aerial bunched 3 core cable of XLPE insulation standard aluminum conductor, standard around a weather resistant black XLPE insulated AAA messenger wire (size 3x70 sq. mm+1x16 sq.mm+ 1x95 sq. mm+1x50 sq. mm)3. (3x95) (for Phase con Erection of Suspension Clamp - 25 to 95 sqmm bare messenger Erection of Anchor Clamp - 25 to 95 Sq. mm bare messenger Erection of Suspension Clamp - 25 to 95 sqmm insulated messenger with bracket Erection of Anchor Clamp - 25 to 95 Sq. mm insulated messenger with bracket Fixing of Universal Hook Pole Clamp-145mmx95

km

8961

255 256

26.6 26.7

Nos. Nos.

85 85

257

26.8

Nos.

113

258 259 260

26.9 26.10 26.11

Nos. Nos. Nos.

113 85 142

Page 14 of 18

Sl. No. Item.No.

Particulars

Unit

Labour charges 2010-11 (in Rs.)

261

26.12

Installation of Insulation piercing connector for main to street light Main : 16-95sqmm, Tap : 1.5-10sqmm(EP95) Installation of Insulation piercing connector for main to service line Main : 16-95sqmm, Tap : 4-35sqmm(P2X95) Installation of Insulation piercing connector for main to service line Main : 25-95sqmm, Tap : 25-95sqmm(P3X95) Installation of Insulation piercing connector for main to service line Main : 50-150sqmm, Tap : 4-35sqmm(P4X150D) Installation of Pre-insulated straight thru' joints-MJPT for 16sqmm cable Installation of Pre-insulated straight thru' joints-MJPT for 25sqmm cable Installation of Pre-insulated straight thru' joints-MJPT for 50sqmm cable Installation of Pre-insulated straight thru' joints-MJPT for 70sqmm cable Installation of Pre-insulated straight thru' joints-MJPT for 120sqmm cable Installation of Pre-insulated lugs-CPTAU for 16sqmm Installation of Pre insulated lugs-CPTAU for 25sqmm Pre-insulated lugs CPTAU Installation of Pre-insulated lugs-CPTAU for 50sqmm Installation of Pre-insulated lugs-CPTAU for 70sqmm Installation of Pre-insulated lugs-CPTAU for 95sqmm Installation of Pre-insulated lugs-CPTAU for 120sqmm Distribution box suitable for 20 single phase connections Distribution box suitable for 6 3 phase connections T-connector KZ3 95 End cap for 50/70 Sqmm 11kV AB Cable T-joint installation for 3 Core 11kV AB Cable Straight thru' joint installation for 3 Core 11kV AB Cable Termination installation for 3 Core Surge Arrester for ABC Ground connection for messenger wire Anchor sleeve for messenger wire Laying of UG Cables by trenchless technology by adopting horizontal boring Boring & Drawing of cable including preparation at site

Nos.

40

262

26.13

Nos.

57

263

26.14

Nos.

57

264

26.15

Nos.

57

265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285

26.16 26.17 26.18 26.19 26.20 26.21 26.22 26 22 26.23 26.24 26.25 26.26 26.27 26.28 26.29 26.30 26.31 26.32 26.33 26.34 26.35 26.36

Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos.

113 113 113 113 142 113 113 113 113 118 147 283 397 96 3 2289 1832 1549 79 19 3

27

27.1

Page 15 of 18

Sl. No. Item.No.

Particulars

Unit

Labour charges 2010-11 (in Rs.)

27.1.1 286 287 288 289 27.1.1.1 27.1.1.2 27.1.1.3 27.1.1.4

Without HDPE Pipe i) Normal soil 5'' bore size ii) Rock soil 5'' bore size Rmtr. Rmtr. Rmtr. Rmtr. 500 870 500 870

iii) Normal soil 6" bore size iv) Rock soil 6" bore size

290

27.1.1.5

v) Normal soil 8'' bore size

Rmtr.

N.A.

291

27.1.1.6 27.1.2

vi) Rock soil

8'' bore size

Rmtr.

1000

With HDPE Pipe i) Normal soil 5'' bore size ii) Rock soil 5'' bore size Rmtr. Rmtr. Rmtr. Rmtr. Rmtr. Rmtr. Rmtr 600 970 730 1140

292 293 294 295 296 297

27.1.2.1 27.1.2.2 27.1.2.3 27.1.2.4 27.1.2.5 27.1.2.6 27 1 2 6

iii) Normal soil 6'' bore size iv) Rock soil 6'' bore size

v) Normal soil 8'' bore size vi) Rock soil 8 bore size 8''

298

27.1.2.7

Providing chain link fencing 50mm size of 8 guage properly stretched between rectangular poles and fixed with suitable bolts & nuts, the free ends shall be welded to the pole and block pipe at top and bottom as required including cost of all materials, la

Sqmt

564

299

27.1.2.8

LTFP box Painting (including scrubbing of old paint, supplying and applying primer and two coats of aluminium /enamel paint including minor repair to box ) Spun Pole Painting (supplying and applying two coats of enamel paints to 11Mtrs spun pole) and painting all the metal parts of the structure with two coats of aluminium paint over primer Spun Pole Painting (supplying & applying two coats of enamel paints to 11Mtrs spun pole) and painting

LS

863

300

27.1.2.9

Pole

4025

301

27.1.2.10

Pole

1725

302

Repairing the broken damaged door of RMU with 27.1.2.11 necessary hinges, welding etc., with necessary paint touch up including supply of paint for touch up.

per door

381

303

Repairing the broken damaged door of LT feeder box 27.1.2.12 with necessary hinges, welding etc.with necessary paint touch up including supply of paint for touch up.

per box

254

Page 16 of 18

Sl. No. Item.No.

Particulars

Unit

Labour charges 2010-11 (in Rs.)

304

27.1.2.13

Repairing the broken damaged door of LT distribution box fixed to DTC with necessary hinges, welding etc. with necessary paint touch up including supply of paint for touch up. Erection of Compact Pre-fabricated Packaged Substation 11kV / 433 V Installing & fixing the compact pre-fabricated packaged sub-station 500/750/990 kVA transformer on the existing concrete plinth.(This does not include the cost of plinth, cable duct,laying & termination of cable etc. provision for the same shall be made Labour Charges towards Station Works (As per Prevailing KPTCL SR with effect from 01.09.06) 11KV SWITCHGEAR Erection, alignment and fixing to the foundation, indoor/outdoor 11KV switchgear panel/unit including movement from the point of unloading to thr point of erction. 11KV Indoor /outdoor switchgear 11KV Kiosk Wiring & assigning in testing & Commissioning 11KV indoor/outdoor switchgear 11KV Kiosk a) Wiring b)Testing & Commissioning

per box

191

28

305

28.1

set

7056

306

28.2 29

307

29.1

308 309 310 311 312

29.1.1 29.1.2 29.1.3 29.1.4 29.1.5 30

1193 Per Panel 994 398 398

313

30.1

Identification of wires, Ferruling Crimping & Termination of wires fir annunciation, etc., Testing of Relays, CTs, PTs, & Breaker for operation. For indoor /outdoor panel comprising of 2I +8F+1BC+1AP3 For single 11KV panel indoor type For additional 11KV panel (indoor type) For single 11KV panel outdoor type/Kiosk For each additional 11KV panel out door type/kiosk Per Set Each Each Each Each a) 9862 b) 39448 a) 1972 b) 7894 a) 986 b) 3950 a) 1972 b) 7894 a)1507 b) 6034

314 315 316 317 318

30.2 30.3 30.4 30.5 30.6 NOTE:

For works involving single pole only 25% extra labour and for works involving 2 poles only 10% extra labour is allowed. The loading and unloading charges shall be included at the following rates in all estimates for the works which are proposed to be taken up on labour contract. For Poles - As per the rates provided for Loading and unloading of poles in the S.R. For all other materials excluding transformers and conductors - 10% of the rates provisioned for Loading and unloading of poles in the estimate. For Transformers and Conductor - As per the rates provided in the S.R.

Page 17 of 18

Sl. No. Item.No.

Particulars

Unit

Labour charges 2010-11 (in Rs.)

The Labour charges for erection of Poles, Guy Sets, DP Structures etc., involving excavation of soil provided in the cost sheet for general works is for ordinary soil only. Wherever other type of soil is encountered, the difference in rates for excavation

Page 18 of 18