Beruflich Dokumente
Kultur Dokumente
1.
: GAZA-TURKISH PALESTINE FRIENDSHIP HOSPITAL : AKER-GZ/2011 : Turkish Development and Cooperation Agency TIKA : Islamic University Gaza " Engineering Office " : Aker Construction Trade& Industrial INC.
2.
3.
Actual Start
14 / 06 / 2011
4.
5.
Project manager Administrative Manager Engineers Safety officer Accountant Forman Surveyor Assistant surveyor Skilled labor Unskilled labor Driver Office Boy Guard man Total on site
6.
None
7.
8.
Total
9.
No. 2 2 1 3 1 1 3 1 2 20 295 2 2 2 10 1
Compressor Water pump Generator Cutting Machine Welding machine Mobile Crane Vibrator Loader Compactor Concrete pump Concrete mixer Total station Level Petroleum tank Water tank Back-hoe excavator
10. Work Performed during report period: Complete the placing concrete for mat foundation at block A-A',B-B', Qty = 838 m3. Complete the placing concrete for mat foundation at block F-G, Qty= 1187 m3. Complete the placing concrete for R.C walls and columns at block C, Qty= 286 m3. Placing concrete for parts of R.W and R.W foundation, Qty= 401 m3. Placing concrete for part of R.C walls and columns at block E Qty=161 m3. Complete the rebar and formwork installation for remaining part of R.C walls at block E. Complete the Placing concrete for caps foundation at Block A-B,F-G,C-E, Qty= 47 m3. Continue the rebar and formwork installation for external Retaining Wall. Continue the rebar and formwork installation for R.C walls and columns at Block D, A-B,F-G. Backfilling work on the foundation at Block C. Placing concrete for up stand beams at block C, Qty = 5.5.
Description Lean Concrete (B150) Protection concrete (B250) External R.W (B250) Structural Elements (B250)
11. Progress of work item of work executed Actual completion Planned ahead or behind schedule Ahead Ahead Ahead
Site handing over site mobilization Excavation work External Retaining wall R.C RF Concrete Structural works C-D-E Blocks 10 cm Gravel & Sand Plain concrete under foundation Water Proofing works Protection Concrete Foundation works Columns & RC walls -9.0 to -4.5m 30cm Backfilling on the foundation Plain concrete (At -9.0m ) -4.5m Slab& Beams Water proofing works for RC.Walls A-A',B-B' Blocks 10 cm Gravel & Sand Plain concrete under foundation water Proofing works Protection Concrete Foundation works Columns & RC walls -9.0 to -4.5m 30-40 cm Backfilling on the foundation Plain concrete (At -9.0m ) -4.50m Beams & Slab Waterproofing works for RC.Wall F-G Block 10 cm sand & Gravel Plain concrete under foundation water Proofing works Protection concrete Foundation works Columns & RC walls -9.0 to -4.5m 30-40 cm Backfilling on the foundation
100% 100% 100% 100% 100% 85% 35% 0.0% 0.0% 0.0% 100% 100% 100% 100% 100% 35% 0.0% 0.0% 0.0% 0.0% 100% 100% 100% 100% 100% 20% 0.0%
100% 100% 100% 100% 100% 84% 15% 0.0% 0.0% 0.0% 100% 100% 100% 100% 100% 28% 0.0% 0.0% 0.0% 0.0% 100% 100% 100% 100% 86% 18% 0.0%
Ahead Ahead Ahead Ahead Ahead Ahead Ahead Ahead Ahead Ahead Ahead Ahead Ahead
13. Schedule:
10
11
Photo # 10
12
13
14
15
16
17
18
Report #:
1 01/09/2011 30/09/2011
Reporting Period:
Date of submission:
5/10/2011
Approved by:
Prepared by:
19