Pres ent
Contractors
Prese nt
No of workers 5 26 15 2 9
Remarks
Levelling work cold stoarage works S.W.D. works panal fixing of antichamber machine earecation
Tommorrow's Plan
working hours
1 L1
Ware House
2 L1 3 L1
dismatilling of internalwalls and c.rmasnory work in adjecentwall C.R masnory work is completed.
4 L1
p.c.c work
5 L3
Pipe laying
6 L2
Levelling work
7 P.D STATION
Pres ent
Contractors
Prese nt
No of workers 8 4 5
Remarks
S.W.D. works
17 Action
Levelling work
2 L3 3 L1
Bricks shifting & piped shifted from factory Panels fixing in progress
4 L1
Admin Building(Existing)
5 Chandi
Drilling of borewells
Drilling to be completed
6 Chandi-2
Survey of farmland
started survey
survey to be completed
1 L2
2 3 4 5 6
L3 L1 L3(Elect) L3(Elect)
storm water drain Ware House Light pole erection work Borewell supply
Excavation & P.C.C. Cold stoarage Panels fixing in progress excavation & pole erection cable laying work
ECT
RT
DATE:- 17.12.09 Work No of workers 10 4 4 Remarks
KAL
Total No of workers Tommorrow's Plan Levelling work & hard rock cutting
18 Action
Pres ent
Contractors
Prese nt
No of workers 8 2 7
Remarks
Tommorrow's Plan
Compound wall Storm water Drain Temprorary Lab Cold Storage works
Disconnection of Electrical cables Removing of Cable and of street light. Poles. Allignment marking and Shifting the pipes, markout gradient line marking flooring, painting works & electrical works completed Panel fixing and marking HSE been followed while Panel fixing and marking Panel fixing HSE been followed while Panel fixing particularly working on height.
Krishna Murthy.
5 L1(warehouse)
Krishna Murthy.
DATE:- 09.12.09
Total
DESCRIPTION Today's work Review
Sl.No.
Section 1 L2 2 L3 Compound wall Storm water Drain Dismentaled bricks shifting alignment marking, levelling
3 L1 4 5
Temprorary Lab
ED ROJECT ANKAL No of Remarks worke rs Interior works, electrical works, vinyl 10 flooring Block shifting 9 Drain work(marking & levelling) 3 DATE:- 09.12.09 Work
EPORT
22 Total No of workers Tommorrow's Plan Levelling markout & levelling flooring, painting works & electrical worsks
Action
Pres ent
Contractors
Prese nt
No of workers 9
Remarks
Inspace Projects Mr Raphael Mr Kiran Mr G.Nagaraj Srinivasreddy Mr S.Sangashetty Mr Mahinderkar Mr Vithal Mr.J.S.Nandi Mr.N.G.Vaidya S.S.P.L.
Tommorrow's Plan
Action
1 L2
Compound wall
bricks shifting
2 L3
3 L1
Temprorary Lab
10
Pres ent
Contractors
Prese nt
No of workers 7
Remarks
SrinivasReddy Mr Raphael Mr Kiran Mr G.Nagaraj Ravindra Mr S.Sangashetty Mr Mahinderkar Mr Vithal Mr.J.S.Nandi Mr.N.G.Vaidya Inspace Projects
Tommorrow's Plan
Action
1 L2
Compound wall
bricks shifting
SrinivasReddy
2 L3
Levelling
3 L1
Temprorary Lab
Interior works, painting & electrical flooring, painting works & works electrical worsks
10
Pres ent
Contractors
Prese nt
SrinivasReddy Mr Raphael Mr Kiran Mr G.Nagaraj Ravindra Mr S.Sangashetty Mr Mahinderkar Mr Vithal Mr.J.S.Nandi Mr.N.G.Vaidya
No of Remarks workers 10 Inspace projects works not done due to JRS strike 8
Tommorrow's Plan
Action
1 L2
Compound wall
Bricks to be shift
SrinivasReddy
2 L3
Levelling
10
Pres ent
Contractors
No of workers 8
Remarks
Inspace Projects Mr Raphael Mr Kiran Mr G.Nagaraj SrinivasReddy Mr S.Sangashetty Mr Mahinderkar Mr Vithal Mr.J.S.Nandi Mr.N.G.Vaidya Ravindra
Tommorrow's Plan
Action
1 L1
Temporary Lab
2 L2
Compound wall
dismentaling
3 L3
Levelling
Levelling
10
Pres ent
Contractors
Prese nt
Inspace Projects Mr Raphael Mr Kiran Mr G.Nagaraj SrinivasReddy Mr S.Sangashetty Mr Mahinderkar Mr Vithal Mr.J.S.Nandi Mr.N.G.Vaidya Ravindra
Tommorrow's Plan
Action
Temporary 1 Lab
Inspace Projects
2 Levelling(L3)
Levelling work
Levelling
Ravindra
Srinivasreddy
10
Pres ent
Contractors
Prese nt
No of workers 8
Remarks
Inspace Projects
Temporary 1 Lab
Tommorrow's Plan 1)Lunch room Interior works. 2) Two doors can be removed from existing admin building and to be fix in Temp lab
Action
Inspace Projects
2 Levelling(L2)
Compound wall
10
Pres ent
Contractors
Prese nt
No of workers 8
Remarks
Inspace Projects
Tommorrow's Plan
Action
Temporary 1 Lab
10
Pres ent
Contractors
Prese nt
No of workers 8
Remarks
Inspace Projects
Tommorrow's Plan
Action
Temporary 1 Lab
10
Pres ent
Contractors
Prese nt
No of workers 8
Remarks
Inspace Projects
Tommorrow's Plan
Action
Temporary 1 Lab
10