Beruflich Dokumente
Kultur Dokumente
AMS Test Service Quality Gate Proforma out of <Test Level> <Project Name> Version 0.1
Confidential
DOCUMENT INFORMATION This is a snapshot of an on-line document. Paper copies are valid only on the day they are printed. Refer to the author if you are in any doubt about the currency of this document. Owner Work Group: Owner Name: Tool used Version 0.1 <PROJ SHORT NAME> Test James Brodie CHANGE HISTORY Date 26-Apr-11 Changed by Changes Initial draft
Distribution
Name Title
Approvals
Name Title <PROJ SHORT NAME> Test Manager
Confidential
Contents
1. Introduction...................................................................................................................4
1.1 Quality Gate criteria for <PROJ SHORT NAME>...............................................................................4 1.2 Production Defect Quality Gate process............................................................................................4 1.2.1 Responsibilities............................................................................................................................4 1.2.2 Escalation route...........................................................................................................................4
Confidential
1. Introduction
This document is used as a means of tracking and accepting Production Defect Deliverables out of the <Test Phase> phase. This document should be seen as the only formal mechanism for accepting code out of <Test Phase>, and is a pre-cursor to the start of the subsequent test phases. Currently this translates into accepting code into the formal Testing Phases of Systems Integration Test (SIT) and (when appropriate) Operational and Performance (O&P) test.
Development
<PROJ SHORT NAME> Test Manager <PROJ SHORT NAME> Test Manager/Lead <PROJ SHORT NAME> Test Manager