Sie sind auf Seite 1von 4

Shaybah NGL Programme - Package 4.

GOSP 2 &3 Mechanical Erection and GOSP 1, 2, 3 & 4 UG Piping


Project Schedule
S/No

Description

Start
Date

Mobilisation
i Initial for Setting-up
ii UG Fabrication Shop
iii Mechanical Works - Fab Shop and Temp Facilities

2/1/2012
2/15/2012
2/28/2012

3/12/2012
3/15/2012
3/30/2012

UG Fabrication GOSP 1, 2, 3 & 4


i Header
ii Ring Main
iii Branch Lines

2/15/2012
2/28/2012
5/10/2012

4/23/2012
7/7/2012
9/7/2012

UG Installation GOSP 1
i Road Crossing Area
ii Ring Main Line
iii Branch Line
iv Penetration into Valve Box
v Hydrotest
vi Tie-In
UG Installation GOSP 2
i Road Crossing Area
ii Ring Main Line
iii Branch Line
iv Penetration into Valve Box
v Hydrotest
vi Tie-In
UG Installation GOSP 3
i Road Crossing Area
ii Ring Main Line
iii Branch Line
iv Penetration into Valve Box
v Hydrotest
vi Tie-In
UG Installation GOSP 4
i Road Crossing Area
ii Ring Main Line
iii Branch Line
iv Penetration into Valve Box
v Hydrotest
vi Tie-In
3

Finish
Date

Mechanical Works - GOSP 2 & 3


i GOSP 2
A Structure
a Pipe Rack
Protocol Inspection and Taking Over
Survey and Center Line Marking
Packer Plate Setting
Section 1 - Erection
Alignment and Inspection
Bolt Tightening
Final Inspection
Grouting
Curing
Section 2 - Erection
Alignment and Inspection
Bolt Tightening
Final Inspection
Grouting
Curing
Section 3 - Erection
Alignment and Inspection
Bolt Tightening
Final Inspection
Grouting
Curing
De-Watering / De-Salter Area and Inlet-Outlet
Protocol Inspection and Taking Over
Survey and Center Line Marking
Packer Plate Setting
De-Watering /De-Salter - Erection
Alignment and Inspection

3/15/2012 4/15/2012
4/15/2012 6/15/2012
6/15/2012 9/15/2012
9/15/2012 10/15/2012
8/15/2012 11/30/2012
11/30/2012
4/15/2012 5/15/2012
5/15/2012 7/15/2012
7/15/2012 10/15/2012
10/15/2012 11/18/2012
9/10/2012 12/31/2012
12/31/2012
4/15/2012 5/15/2012
5/15/2012 6/30/2012
7/1/2012 8/30/2012
9/1/2012 9/30/2012
9/1/2012 10/30/2012
10/30/2012
3/15/2012 4/15/2012
4/15/2012 8/20/2012
8/20/2012 12/30/2012
12/15/2012 1/18/2013
9/20/2012 2/10/2013
2/10/2013

4/7/2012
4/20/2012
5/7/2012
5/21/2012
7/12/2012
7/18/2012
8/4/2012
8/4/2012
8/21/2012

4/20/2012
5/7/2012
5/21/2012
7/12/2012
7/18/2012
8/4/2012

6/20/2012
8/10/2012
8/20/2012
8/20/2012
9/7/2012
9/20/2012

8/10/2012
8/20/2012

8/21/2012
9/10/2012

9/7/2012
9/20/2012
10/7/2012

6/20/2012 9/10/2012
9/10/2012 9/20/2012
9/20/2012 10/6/2012
10/6/2012
10/6/2012 10/20/2012
10/20/2012 11/7/2012

4/7/2012
4/20/2012
5/15/2012
6/24/2012
8/10/2012

4/20/2012
6/10/2012
6/24/2012
8/10/2012
8/25/2012

Jan

Feb

Mar

Apr

May

2012
Jun July

Aug

Sept

Oct

Nov

Dec

MCC Date

Jan

Feb

Mar

Apr

May

2013
Jun July

Aug

Sept

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

2014
Jun July

Aug

Sept

Oct

Nov

Dec

Bolt Tightening
Final Inspection
Grouting
Curing
GAS Compressor / Aux Eqpt - Erection
Alignment and Inspection
Bolt Tightening
Final Inspection
Grouting
Curing
B

Piping
Pipe Rack - Section 1
Scaffolding
Pipe Delivery to Site
Pipe moving into Pipe Rack - Level 1
Pipe moving into Pipe Rack - Level 2
Pipe moving into Pipe Rack - Level 3
Pipe Fit-up and Weld
Big Bore CS-Header lInes
Small Bore CS
Big Bore SS
Small Bore SS
Pipe Rack - Section 2
Scaffolding
Pipe Delivery to Site
Pipe moving into Pipe Rack - Level 1
Pipe moving into Pipe Rack - Level 2
Pipe moving into Pipe Rack - Level 3
Pipe Fit-up and Weld
Big Bore CS-Header lInes
Small Bore CS
Big Bore SS
Small Bore SS
Pipe Rack - Section 3
Scaffolding
Pipe Delivery to Site
Pipe moving into Pipe Rack - Level 1
Pipe moving into Pipe Rack - Level 2
Pipe moving into Pipe Rack - Level 3
Pipe Fit-up and Weld
Big Bore CS-Header lInes
Small Bore CS
Big Bore SS
Small Bore SS
De-Watering / De-Salter Area and Inlet-Outlet
Scaffolding
Pipe Delivery to Site
Piping -Header to Equipment
Piping - Equipment to Equipment
Piping - Equipment to Piperack
Piping - CS Small Bore
Piping - SS Small Bore
GAS Compressor / Aux Eqpt - Erection
Scaffolding
Pipe Delivery to Site
Piping -Header to Equipment
Piping - Equipment to Equipment
Piping - Equipment to Piperack
Piping - CS Small Bore
Piping - SS Small Bore

Hydrotest
Test Pack Preparation
Test Pressure
Pessivation
Equipment Erection
Protocol Inspection and Taking Over
Survey and Center Line Marking
Packer Plate Setting
Anchor Bolt Setting
De-Watering /De-Salter - Erection
Alignment and Inspection
Bolt tightening
Final Inspection
Formwork for Grouting

8/25/2012
9/3/2012
9/3/2012
9/20/2012

9/3/2012
9/20/2012
10/7/2012

8/20/2012
10/13/2012
10/20/2012
11/4/2012
11/4/2012
11/18/2012

10/13/2012
10/20/2012
11/4/2012

12/12/2012
12/25/2012
2/10/2013
2/27/2013
3/7/2013

1/20/2013
2/10/2013
3/15/2013
4/2/2013
4/10/2013

2/10/2013
3/1/2013
4/30/2013
5/27/2013

3/30/2013
4/30/2013
5/27/2013
6/12/2013

12/20/2012
1/20/2013
3/12/2013
3/27/2013
4/4/2013

2/12/2013
3/12/2013
4/15/2013
5/2/2013
5/12/2013

3/15/2013
4/1/2013
6/1/2013
6/20/2013

4/27/2013
5/30/2013
6/20/2013
7/7/2013

1/20/2013
2/12/2013
3/30/2013
4/20/2013
5/20/2013

3/12/2013
3/30/2013
5/1/2013
6/1/2013
6/30/2013

4/15/2013
5/1/2103
6/30/2013
8/15/2013

5/28/2103
6/30/2013
8/15/2013
9/15/2013

11/18/2012
12/12/2012

11/15/2012
1/7/2013
12/1/2012 1/30/2013
1/6/2013 2/20/2013
2/20/2013 5/12/2013
5/12/2013 7/15/2013
7/15/2013 8/24/2013
8/24/2013 10/15/2013

1/15/2013
2/1/2013
3/6/2013
3/18/2013
7/26/2013
9/27/2013
12/7/2013

2/26/2013
4/15/2013
5/30/2013
7/26/2013
9/27/2013
12/7/2013
1/15/2014

4/24/2013
4/30/2013
12/1/2013

4/30/2013
2/27/2014
3/30/2014

1/1/2013
2/1/2013
3/5/2013
9/12/2013

3/30/2013
4/25/2013
5/12/2013
5/27/2013

5/1/2013 6/30/2013
5/22/2013 7/27/2013
6/20/2013 8/27/2013
8/1/2013 10/25/2013

Grouting
Curing
GAS Compressor / Aux Eqpt - Erection
Alignment and Inspection
Bolt tightening
Final Inspection
Formwork for Grouting
Grouting
Curing

8/15/2013 11/10/2013

6/1/2013 7/30/2013
6/25/2013 8/27/2013
7/18/2013 9/27/2013
9/1/2013 11/25/2013
9/22/2013 12/13/2013
10/12/2013 12/30/2013

Flare Installation
Flare Structure
Flare Piping
Flare Burner / Tip and Gun

GOSP 3
A Structure
Pipe Rack
Protocol Inspection and Taking Over
Survey and Center Line Marking
Packer Plate Setting
Section 1 - Erection
Alignment and Inspection
Bolt Tightening
Final Inspection
Grouting
Curing

4/7/2012
4/20/2012
5/7/2012
5/21/2012
8/12/2012
8/18/2012
9/4/2012
9/4/2012
9/21/2012

4/20/2012
5/7/2012
5/21/2012
8/12/2012
8/18/2012
9/4/2012
9/21/2012
10/8/2012

Section 2 - Erection
Alignment and Inspection
Bolt Tightening
Final Inspection
Grouting
Curing

6/20/2012 8/30/2012
8/30/2012
9/8/2012
9/8/2012 9/21/2012
9/25/2013
9/25/2013 10/5/2012
10/5/2012 10/27/2012

Section 3 - Erection
Alignment and Inspection
Bolt Tightening
Final Inspection
Grouting
Curing

7/20/2012 9/10/2012
9/10/2012 9/20/2012
9/20/2012 10/6/2012
10/6/2012
10/6/2012 10/20/2012
10/20/2012 11/7/2012

De-Watering / De-Salter Area and Inlet-Outlet


Protocol Inspection and Taking Over
Survey and Center Line Marking
Packer Plate Setting
De-Watering /De-Salter - Erection
Alignment and Inspection
Bolt Tightening
Final Inspection
Grouting
Curing

4/7/2012 4/20/2012
4/20/2012 6/10/2012
5/15/2012 6/24/2012
6/24/2012 9/10/2012
9/10/2012 9/20/2012
9/20/2012 9/30/2012
9/30/2012
9/30/2012 10/10/2012
10/10/2012 10/30/2012

GAS Compressor / Aux Eqpt - Erection


Alignment and Inspection
Bolt Tightening
Final Inspection
Grouting
Curing

9/10/2012 11/27/2012
11/27/2012 10/30/2012
10/30/2012 12/4/2012
12/4/2012
12/4/2012 12/18/2012
12/18/2012 1/12/2013

Piping
Pipe Rack - Section 1
Scaffolding
Pipe Delivery to Site
Pipe moving into Pipe Rack - Level 1
Pipe moving into Pipe Rack - Level 2
Pipe moving into Pipe Rack - Level 3
Pipe Fit-up and Weld
Big Bore CS-Header lInes
Small Bore CS
Big Bore SS
Small Bore SS
Pipe Rack - Section 2
Scaffolding
Pipe Delivery to Site
Pipe moving into Pipe Rack - Level 1
Pipe moving into Pipe Rack - Level 2
Pipe moving into Pipe Rack - Level 3
Pipe Fit-up and Weld

11/21/2012
12/25/2012
3/15/2013
4/15/2013
5/2/2103

1/20/2013
3/15/2013
5/15/2013
5/30/2013
6/29/2013

4/15/2013
6/15/2013
8/15/2013
9/12/2013

7/8/2013
8/15/2013
9/5/2013
10/4/2013

12/20/2012
1/20/2013
4/30/2013
5/8/2013
6/1/2013

2/12/2013
4/30/2013
5/30/2013
6/15/2013
7/8/2013

Big Bore CS-Header lInes


Small Bore CS
Big Bore SS
Small Bore SS
Pipe Rack - Section 3
Scaffolding
Pipe Delivery to Site
Pipe moving into Pipe Rack - Level 1
Pipe moving into Pipe Rack - Level 2
Pipe moving into Pipe Rack - Level 3
Pipe Fit-up and Weld
Big Bore CS-Header lInes
Small Bore CS
Big Bore SS
Small Bore SS

6/5/2013 8/27/2013
7/15/2013 9/20/2013
9/20/2013 10/20/2013
10/20/2013 11/3/2013

4/1/2013
5/21/2013
7/3/2013
4/20/2013
8/20/2013

5/21/2013
7/3/2013
8/3/2013
8/30/2013
9/20/2013

4/15/2013
5/1/2103
6/30/2013
8/15/2013

5/28/2103
6/30/2013
8/15/2013
9/15/2013

De-Watering / De-Salter Area and Inlet-Outlet


Scaffolding
Pipe Delivery to Site
Piping -Header to Equipment
Piping - Equipment to Equipment
Piping - Equipment to Piperack
Piping - CS Small Bore
Piping - SS Small Bore

2/15/2013
4/7/2013
3/1/2013 4/30/2013
4/1/2013 5/20/2013
5/20/2013 8/12/2013
8/12/2013 10/15/2013
10/15/2013 11/24/2013
11/24/2013 1/15/2014

GAS Compressor / Aux Eqpt - Erection


Scaffolding
Pipe Delivery to Site
Piping -Header to Equipment
Piping - Equipment to Equipment
Piping - Equipment to Piperack
Piping - CS Small Bore
Piping - SS Small Bore

4/15/2013 5/26/2013
5/1/2013 7/15/2013
6/6/2013 8/30/2013
7/18/2013 10/26/2013
10/26/2013 12/27/2013
12/27/2013 2/27/2014
2/27/2014 4/15/2014

Hydrotest
Test Pack Preparation
Test Pressure
Pessivation
Equipment Erection
Protocal Inspection
Survey and Center Line Marking
Packer Plate Setting
Anchor Bolt Setting
De-Watering /De-Salter - Erection
Alignment and Inspection
Bolt tightening
Final Inspection
Formwork for Grouting
Grouting
Curing
GAS Compressor / Aux Eqpt - Erection
Alignment and Inspection
Bolt tightening
Final Inspection
Formwork for Grouting
Grouting
Curing
Flare Installation
Flare Structure
Flare Piping
Flare Tip / Gun Installation
Testing

4/24/2013
6/30/2013
1/21/2014

6/30/2013
4/27/2014
5/15/2014

1/1/2013
3/1/2013
4/5/2013
5/1/2013

4/30/2013
5/25/2013
6/12/2013
7/27/2013

6/1/2013 7/30/2013
6/22/2013 8/27/2013
7/20/2013 9/27/2013
9/1/2013 11/25/2013
9/15/2013 12/10/2013
10/12/2013 12/30/2013

6/1/2013 7/30/2013
6/25/2013 8/27/2013
7/18/2013 9/27/2013
9/1/2013 11/25/2013
9/22/2013 12/13/2013
10/12/2013 12/30/2013

11/1/2013
11/2/2013
1/21/2014

1/21/2014
1/21/2014
3/30/2014

Das könnte Ihnen auch gefallen