PERSONAL INFORMATION
Full Name: Mohammad Samir Khalil Abu-Radi Nationality: Jordanian Date of Birth: November, 19th, 1974 Marital Status: Married having 3 female kids
PROFESSIONAL EXPERIENCE
Sicon Oil & Gas Abu Dhabi UAE
Project: EPC works for Bu Hasa Shuaiba Unit H water injection enhancement project Client: ADCO Approximate Project Value: 30 M$ Title: Project Engineer Controls, Acting Project Controls Manager Responsibilities:
Acting as Project Controls Manager reporting directly to the Project Manager. Holding full responsibility for the project monitoring & controls activities through supervising and managing a team of professionals (Around 25 personals). The department duties can be summarized in defining the project controls guidelines and assuring the integrity between all project controls functions and tools. A detailed project controls procedures where developed defining the process, rules and basis in compliance with company policies and contract requirements. In details my duties are: FUNCTION Planning & Scheduling TEAM ACCOUNTABILITY Developing the plans and schedule and identifying the activities likes to each other and identifying the critical path of the project Updating according to actual achievements Evaluating and predicting the forecast based on the project conditions Developing and updating the S-Curves Holding weekly and monthly meetings with internal staff updating and providing general guidelines for the project status and recommending future plans and strategies to complete the work within the required project period Claims tracking Developing weighting and progress measurement system for all project phases, Engineering, Procurement and Construction through assigning weights to each one based on different criteria suits each work package Updating the progress based on the feedback from all departments Analyzing the progress completion percentages comparing with the planned ones and provide recommendations accordingly. Estimating the forecast for the progress, staff, manpower and construction equipment. Preparation and issuing of project reports, weekly and monthly Managing the contract requirements with the client Developing the contracts between company and sub-contractors Weekly meeting managing the works with both client and sub-contractors Preparation of project invoices to the client 1 OF 4
2010 - present
Contract Management
MOHAMMAD ABU-RADI -
PROJECT ELECTRO-MECHANICAL ENGINEER Monitor and review sub-contracts and LPOs payments Preparing and managing the variation orders. Preparation and floating of RFQ to the approved suppliers / vendors Preparation of commercial comparison sheets and leading the negotiation with the suppliers / vendors Issuing of LPO, expediting and inspection of procured material Store management and site requisition issuing Collecting the actual expenditure and comparing it to the budget according to company procedure. Issuing the cost report with analysis write-ups and recommendations Generate the forecast cost up to the end of the project Preparation of the cash performance curves Preparation of cash in and cash out curves Preparation of productivity report and indexes, CPI, SPI Managing the engineering documents and related revisions issuing, Start, IDC and IFA. Managing project correspondences, in and out. Managing the project hand over documentation Managing the IT and automation of IT network Managing and maintaining the automation of company in-house softwares related to the project.
Material Management
Cost Control
Document Management
IT & Automation
2010 - 2010
Holding full responsibility for the preparation of technical and commercial proposals and estimation in the bidding stage for EPC Oil & Gas pipeline/piping projects/clients such as GASCO, Arabian Power Company, ADCO, etc. Other Selected Responsibilities: 1- Preparation of bidding execution plans. 2- Estimating the direct and indirect cost for the execution of miscellaneous disciplines; pipeline, piping, mechanical, electrical, telecommunication, instrument and civil. 3- Preparation of manpower and equipment project requirements and deployment plans 4- Preparation and review of tenders proposed schedule/plan and project control requirements. 5- Preparation of Technical and commercials bids 6- Preparation of budget and tender summary files after the award 7- Gathering all commercial/technical information from the VENDORS/Sub-Contractors and preparation of Commercial/technical comparison sheets.
2008 2010
Reporting to the project control manager, holding full responsibility for the control and coordination of a multi-site locations and discipline activities during project phases: engineering, procurement, construction, pre-commissioning and commissioning activities, as well as all VENDORS tasks ensuring all the requisites of engineering, construction, pre-commissioning, commissioning, performance tests and start up activities are accomplished with full compliance with the project schedule and AGREEMENT. All tasks were managed and controlled by a dedicated software management systems that used to control the scheduled activities and progress cumulative and earned values. ICAP software were utilized to control and monitor the pre-commissioning and commissioning requirements through project phases starting by engineering phases till hand-over to client; and in accordance to the OPERCOM methodology which applies to piping & pipeline erection, pressure test packs, pressure transmitter and gauges calibrations, temperature elements calibration, valve actuators, pig signalers, gas meter skids testing along with filtration and pressure reduction skids, RTU/SCADA, OTN network functionality, CCTV, UPS, fire protection system, 11kv systems, building electromechanical services and fire and gas system operation. Other Selected Responsibilities: 1- Coordinating and following up punch list clearance with the VENDORS, construction team, commissioning team and CLIENT. 2- Certifying/approving systems/sub-systems upon the completion of work and handing over to the client through the preparation of Mechanical completion/RFC dossiers (Ready for Commissioning), RFSU dossiers (Ready for Start-Up), PSSR (Pre-Start Up safety Review) and PT (Performance Test) processes. 3- Chair inter company certification meeting and actively representing CCIC in CLIENT quality, certification meetings, commissioning, construction, project closing out, Provisional Acceptance and final documentation handing over. 4- Periodically reporting to the project manager and control manager the key company accomplishments and foreseen requirements and problems 5- Advise the commissioning manager on possible deviations/alternative methodologies to perform commissioning tasks 2 OF 4
Acting as deputy commissioning manager handing all commissioning department responsibilities and duties on commissioning manager absent. Preparation of Sequential Logical Start Up for System/Sub-System.
2005 2007
Held full responsibilities of electrical and instrumentation inspections which includes: non-process building services, outdoor lighting, 11KV distribution system, HV/LV transformer, fire alarm system, fire hydrant, fire suppression system, HV/MV/LV switchboard, MCC, UPS, Duct Banks, Cables pulling and Termination which includes all type of cables (HV, MV, LV, instrument, fiber optic, telecommunication), Instrument installation and calibration. Other Selected Responsibilities: 1- Design the fire protection system which includes fire alarm and detection system, fire suppression system using CO2 gas and fire hydrant & hose reel network. 2- Lead the Discussions and following up with Authority having Jurisdiction (Jordanian Civil Defense) to gain their approval for all safety and fire protection requirements (Architectural, electrical and mechanical). 3- Design of underground GRP piping network (Dia. 50 up to 3000) including detail pipe spools arrangements and installation reflected on the pipe profile drawings which was prepared using AutoCAD. 4- Coordination of all external services installation assuring no conflicts between services which includes: Potable water Network, Industrial Water Network, Fire Fighting Network, Duct Banks, GRP pipe network, SS hot air Network, Surface Drainage, Irrigation System, Process Drain Network, Sewage Drain Network, Biosolids Network, etc. 5- Leading and advising site engineers for the installation of external services in sequence to avoid repetition of work and installation conflicts.
2004 2005
Design-oriented engineer held the responsibility of designing electrical system for buildings, gardens, roads and tunnels. The electrical systems includes: Lighting, small power, telecom, CCTV, public address, fire alarm, area lighting, swimming pool lighting, etc. Other Selected Major Responsibilities: 1- Tender preparations 2- Tender Studying. 3- Construction projects estimation. 4- Handing over committee member
2002 2004
Held the responsibility of designing, procurement, executing and handing over of fire protection systems which includes: Fire Alarm, Water Sprinkler, Pre-action, Deluge, CO2, FM-200, Inergen, Hydran, Hose Reel, Landing Valves, Fire Pumps, Voice Evacuation, etc. Lead the discussion with Authority having Jurisdiction to approve all designs and installations. Key Project: 1- Le-Royal Hotel (Water Sprinkler System, FM-200 systems & CO2 systems) 2- Hikma Pharmaceutical Manufacturing Co. (Water Sprinkler System & Deluge System). 3- Al-Ahli Plastic Co. (Water Sprinkler System) 4- AlGhad Newspaper (Water Sprinkler System) 5- Maintenance projects: I was responsible for: 6- Intercontinental Hotel. 7- Four Seasons Hotel. 8- Sheraton Hotel. 9- Amra Forum Hotel.
2001 2002
1999 2001
MOHAMMAD ABU-RADI
1999 1999
1997 1999
I played major rule in during the construction of the factory responsible for the installation of the pharmaceutical machines. Follow up the installation of buildings services as a client representative for: BMS, Fire Alarm, Fire Fighting, HVAC, Public Address, CCTV, PABX, Electrical Generator, Water Treatment Plant, Sewage Treatment Plant, Lighting etc. Upon the completion of the factory I was responsible for operating Control Room using Honeywell BMS, maintaining MCC using PLC, HVAC, Generator, Water treatment plant (softener, RO and de-ionizing unit), Preparation of SOP (Standard Operating Procedure) for both production and utilities machines and preparing the Maintenance Control Schedule (Preventive and Breakdown Maintenance).
234-
QUALIFICATIONS
Scientific High Degree Certificate: Hettein Secondary School Jordan Year of Graduation: 1993, Total Grade: 90.9 (Excellent) Bachelor of Electro-Mechanical Engineering: Amman University College for Applied Engineering Jordan Year of Graduation: 1997, Total Grade: 74.1 Graduation Project: Design & manufacturing of Single & Three-Phase Linear Motor and controlling it using Electronic PWM (Pulse Width Modulation) Circuit. Total Grade (Graduate Project): 99 Languages: 1- Fluent in Arabic; reading, writing and speaking. 2- Excellent in English; reading, writing and speaking.
4 OF 4