Sie sind auf Seite 1von 3

ANTENNAS

Antenna Mounting, Alignment (Azimuth, Tilt) Transmission Line

CELL EXTENDERS
Cell Extender Planning Installation and Acceptance: Marius

to Revise

FREQUENCY : Magdaleen to revise (check OTB and New CellOpt) Frequency Plan Summary Form : ok Frequency Planning: ok GSM Spectrum and Allocation in South Africa : Please see if still conforms Producing and Implementing a Frequency Plan : Jay to revise IN-BUILDING BTS SITES Micro Cell Planning and Installation : Natasha & Hendi to revise MOBILE
CellOpt User Manual Mobile BTSs; Correct Site Specification

OPTIMISATION
Neptune User's Manual TEMS Operation

QUALITY
Interference in Cellular Networks Network Drive Tests, Measurements of Network Quality : Hendi to revise (Buzzard?) Network Quality Targets, GOS, Availability, Dropped Calls, Noise, Set-up Time, Signal Level : Needs to be updated.

STATISTICS
EMG Region Boundaries for Cell Statistics Network Status Report :

Brian Collet to revise.

Use of MSC/BSC Statistics for Correction of Network : This needs to be relooked.

TMOS
Using TMOS

: oss7 needs to be oss8

TRAFFIC : needs updating Holiday Upgrade Planning : Needs updating Special Events Report : Does this procedure still take place? Who? Pls. Revise.
Cell Dimensioning Policy The Erlang; Definition and use of, Erlang Tables, Traffic Behaviour

ANTENNAS
Antenna Feeder Configuration Codes and Numbering Scheme Version 3.1 Antenna Feeder Configuration Codes and Numering Scheme Version 4 Antenna Feeder Configuration Codes and Numering Scheme Version 4.0

Antenna Diversity Theory and Practice Antenna Radiation Patterns; How to Interpret Antenna Site Share Diagrams Antenna System Test Procedure Duplexers; How to use, Costs, Performance Painting of Antennas Preferred Antenna Types Use of Up Link Pre-amplifiers VSWR Description and Theory

: all above ref. Amterial need to be revised

BSC ISSUES
BSC Naming Convention and BSC Boundaries Dimensioning of a BSC

BUDGETING
Base Station Build Costs Capex Budgeting Procedure

: needs to be updated

CELL DATA
Generating and Changing Radio Cell Data

MTNIS
Data Flow between Planet and MTNIS MTNIS Queries (List and Function)

NETWORK PLANNING
Pico Cell Planning, Design and Installation Cell Planning Techniques in High Capacity Areas Cell Planning Techniques in Low Capacity Areas Coverage Area; Definition, % Coverage Effect of Antenna Height on Coverage Area Planning Boundaries for Cell Planners Network Design for License Bids Network Dimensioning

RADIO PLANNING TOOL


Correct use of Planet Flags

: This whole section needs to be updated.

Digital Elevation Model (DEM): Documentation Radio Planning Tool Clutter Data Clutter Types and Tuning of Asset Models Radio Planning Tool Vectors Site Planning using Planet

: need to link to asset manual

PROPAGATION

Basic Electromagnetic Wave Equations CW Measuring Guidelines CW Survey Details Form Link Budget : Propagation into and within Buildings Transmission Feeder Loss Table Tuning Planet's Propagation Model

: needs to be revised.

: Magdaleen to revise. : Needs to be revised

SITE RELEASE AND BUILD


Aspects Relating to Acquiring a Site Lease Detailed Site Acceptance Procedure Ericsson Equipment Types Evaluating a Potential Site Integration of New Site List of Standard Mast Types Radio Electromagnetic Field Exposure Environmental Site Evaluation Form Site Survey/Pre-consultation Form

: Needs to be revised

SYSTEM ADMINISTRATION : needs to be revised Restarting PlaNet Machine after a Power Loss : needs to be revised WORK AUTHORISATION SYSTEM Work Authorisation Form (currently under development) On-line Work Authorisation Process (currently under development)
Database Backup for PlaNet, MTNIS MTN New Site Build Workflow MTN Site Decommissioning Workflow MTN Upgrade / Downgrade Site Workflow

TELETRAFFICKING
Optima Change Request

REFERENCE DOCUMENTS
Radio Frequency Spectrum Designations : are spectrums updated?

Das könnte Ihnen auch gefallen