Beruflich Dokumente
Kultur Dokumente
com/
01. title page 02. acknowledge 03.executive sumry 04. table of contant 05. list of table 06. introduction 6.1 . objective of studing the orgnation 6.2 . overviw of org 6.3 . brif histry 6.4 nature of org
6.5 org structure.
Echo West International, Kabul (Afghanistan) February 2003 December 2005 (2 years 11 months) Project management of Infrastructure (underground utilities, treatment plants with emphasis on environmental protection, roads, power etc) & Building works (demolition, construction, rehabilitation, maintenance) for the army garrisons of US Army Corps of Engineers (USACE) in Kabul in association with Washington & Perini Corporation from USA. Managed ANA Garrison construction at Darualaman (Kabul) amounting to US$ 11Million. Coordinated with contracting firm regarding change control, issue management, monitoring of the progress, resources arrangement & reporting on technical, commercial and other aspects. Administered Contract and supervised Execution, QA/QC & HSE Plans in accordance with USACE standards. Prepared and presented Preparatory Meetings & implemented audits for each project phase to ensure compliance with QA/QC and safety regulations. Managed task Orders and procurements using World Bank, ADB, UN, USAID guidelines. Manager Technical (Pre-Qualifications) Echo West International (Pvt.) Limited Lahore, Pakistan July 1999 February 2003 (3 years 8 months) Prepared Prequalification packages, Technical proposals and Method Statements of projects. As Management Representative (MR), supervised development of Standard Operating Systems (SOPs) for achievement of Company's ISO9001 accreditation. As a field engineer in planning section, planned & 170Kms long US$ 38Million Highway project. Worked with foreign Consultants Clough Engineering from Australia and Foster Wheelers from UK on Infrastructure Projects of Oil and Gas Fields. Coordinating Engineer Yau Lee Construction / BRE HK PolyU, Hong Kong April 1998 July 1999 (1 year 4 months) Coordination / planning of pre-casting high-rise building components for optimal cycle time. Deputy Project Manager (QA/QC) Echo West International (Pvt.) Limited Lahore, Pakistan. April 1996 August 1996 (5 months)
Worked at Uch Power Plant with the Consultants (Raytheon Constructors USA) & Client (General Electric USA) to implement quality of construction / building materials, concrete, mortar & backfilling. Performed Lab tests related to quality & prepared concrete mix designs.
Since its inception, Echo West International (Pvt.) Ltd. (EWI) has steadily expanded its operations, whilst developing expertise across a range of Engineering projects. EWI is proud of its reputation, which is founded on the continual provision of high quality finished products those meet the Clients highest expectations. The company guards its reputation by exercising tight project financial control and excellent site management in sometimes difficult situations. Today, the company offers a full range of skills in the design, construction and management of Civil, Electrical and Mechanical works. The company's head office is located at Lahore while the regional offices are situated at Karachi and Islamabad.
Location
We do all type of construction projects including civil, mechanical, electrical and industrial projects of all type