MACHINE INSTALLATION MONDAY 27/02/2012 EQUIPMENT AND MACHINERY SETUP 2.

1 SETUP EQUIPMENT AND MACHINERY

2.1.1 TOOL AND EQUIPMENT 2.1.2 2.1.3 2.1.4 2.1.5 2.1.6 2.1.7 2.1.8 3.4 LIST OF EQUIPMENT MATERIAL HANDING EQUIPMENT MATERIAL HANDLING EQUIPMENT ARRANGEMENT METHOD COST CONTROL TECHNIQUE DETERMINE TOOL AND EQUIPMENT DETERMINE LIST OF EQUIPMENT DETERMINE MATERIAL HANDLING EQUIPMENT APPLY MATERIAL HANDLING EQUIPMENT ARRANGEMENT METHOD APPLY COST CONTROL TECHNIQUE MAXIMIZE EFFICIENCY COST ORGANIZE YOUR INSTALLATION TEAM

IN MOST CASES,THE VENDORS REPRESNTANTIVE WILL BE PRESENT DURING INSTALLATION AS PART OF SALES AND SERVICE AGREEMENT.IF THE RAP IS PRESENT, THEN HE COULD BE CONSULTED FOR UNPACKING AND PROPER PROCEDURE FOR INSTALLATION. IF NO REP AVAILABLE,ATEAM FORMED FOR THE INSTALLATION WILL BE APPROPRIATE. 3.5 HAVE A PRE-INSTALLATION MEETING HOW BEST IT SHOULD BE MOVED IN HOW AND WHO WILL HANDLE VARIOUS INSTALLATION ISSUES TRANSPORT EQUIPMENT TO LOCATION

CAUTION:PAY ATTENTION TO ALL SAFETY PRECAUTIONS IF YOU DO NOT HAVE SKILL PEOPLE OR RIGHT EQUIPMENT,GER AN OUTSIDE CONTRACTOR WHO CAN PROVIDE SPECIALIZED SERVICE. BEFORE THE EQUIPMENT IS MOVED TO CORRECT LOCATION. DETERMINE THE CORRECT PLACEMENT OR ANGLE OR POSITION CORRECT MOUNTING LOCATION / MOUNTING TOOLS EQUIPMENT LEVELNESS POWER POINT, AIR AND OTHER UTILITY LOCATION

MACHINE INSTALLATION MONDAY 27/02/2012 3.6 CORRECT UTILITY POSITION

MAKE SURE ALL UTILITY REQUIREMENT ARE BASED ON EQUIPMENT SPECIFICATION.IT IS THEREFORE CAREFUL STUDY SHOULD HAVE BEEN DONE DURING THE PREINSTALLATION STAGE. EASURE: CORRECT LECTRICAL SUPPLY, RATING AND CONNECTION PROVIDED CORRECT AIR PRESSURE AND PIPING ANY OTHER REQUIREMENT,VACUM,CHILLED WATER OR samb. 3.7 VERIFICATION BEFORE POWER-UP

USE THE EQUIPMENT INSTALLATION CHECKLIST TO VERIFY ONE MORE TIME,THAT ALL CONNECTIONS,POSITIONS AND SPECIFE PART ARE ALL samb.. 3.8 EQUIPMENT INSTALLATION BUY-OFF A BUY-OFF CHECKLIST CAN BE USED TO DOCUMENT ALL EVENT RELATING ON samb..

PERSIAPAN PERALATAN PEMASANGAN PENGUNAAN PERALATAN YANG SESUAI PERALATAN TAMBAHAN KHAS ALAT PENENTUKURAN (CALIBRATOR) KONTRAKTOR MAHIR JIKA PERLU PERKARA PENTING SEMASA PROSES PEMASANGAN MENGIKUT PROSEDUR YG TELAH DISYORKAN OLEH PEMBUAT MESIN MENGADAKAN SATU SESI PERBINCANGAN DGN KUMPULAN SUPAYA SEMUA MASALAH SAMPINGAN BOLEH DIURUSKAN SEBELUM PEMASANGAN PASTIKAN ADANYA PLAN LOKASI DAN TAPAK SEDIA DIAGIHKAN (AGIHAN MESIN IAITU JARAK DIANTARA MESIN) MEMBERI KEBERANAN KEPADA KAKITANGAN PEMBUAT MESIN MELAKUAKAN KERJA-KERJA PEMASANGAN SEKIRANYA IANYA TERMASUK DALAM PERJANJIAN JUAL-BELI. BERI TUMPUAN KHAS KEPADA: TAPAK-MENDATAR ORIENTASI BETUL-POSISI MESIN TIDAK MENGANGU DAN MENYEKAT PROSES ATAU MESIN LAIN MUDAH DIKENDALIKAN PASTIKAN SEMUA PEMASANGAN TELAH DI KENDALIKAN DENGAN BETUL SEBELUM BEKALAN ANGIN DAN KUASA DIHIDUPKAN.

MACHINE INSTALLATION MONDAY 27/02/2012