Fieldbus Design and Project Execution for FPSO Projects

Murali Krishnan T and Kaustubh Deshpande K t bh D h d Emerson Process Management, Asia Pacific

FPSOs using Foundation Fieldbus


Project Name Teekay SIRI PIPA-II Lord of the Sea Greater Plutonio Enfield Owner/ End User PetroJarl Petrobas Pemex BP Woodside Capacity Bpd 15,000 30,000 200,000 240,000 Date Commissioned March 2008 In commissioning May 2007 Oct 2007 2007

Singapore FPSO Seminar - 21 August 2009


2

Agenda

Typical project organization Implementation Process Modular concept System hardware design, delivery and installation y g , y flexibility Software standards for FPSO automation Use of bus technologies

Singapore FPSO Seminar - 21 August 2009


3

Proven project execution model Typical project organisation


Project Execution Model Stages with defined objectives Key activities Milestones
HSE Project Manager

Involving specialist in Operational experience Power and Automation Systems


Specialists

How do you do it? y


Project P j t support t Asset Optimisation Conceptual p engineering System and y detail engineering Power Systems Safety and Automation Installation support & y pp System Commissioning Operational p Support

Experienced personnel in Project Management Application knowledge Asset Management Safety and Automation System Instrumentation / Valves Power Systems Fieldbus Technology

Global Support g g Engineering Installation supervision Commissioning Service Fieldbus Workshops

Singapore FPSO Seminar - 21 August 2009


4

Project Execution FEED Phase

Integrated Engineering Team during FEED, follow-up engineering and site integration coordination
( Customer / Contractor / Suppliers / End-user ) Customer/End-User/Contractor experts availability Co-design Co design on solutions Prepare and train customer organization and yard-teams for utilization of new designs/techniques and maximize the yield Prepare and distribute project design specifications and f perform FEED Empowered participation in the preparation of tender documents and package procurement to enforce standards and improve data from package units

Singapore FPSO Seminar - 21 August 2009


5

Project Execution

Design phase Implementation phase FAT Metering Skid FAT Top Sides Site work on yard Site work on Offshore location

FDS helps S ensure agreement and consistency


Singapore FPSO Seminar - 21 August 2009
6

Fieldbus Implementation Process


FEED Phase
Fieldbus Deployment Assessment

Site Commissioning Phase


Commissioning Workshop

Engineering Phase
Fieldbus Technical Training

Final Review Loop Check & Commissioning

Fieldbus Application Workshop Simulation Test

Design / Segmentation

Singapore FPSO Seminar - 21 August 2009


7

FEED Phase
FEED Phase
Fieldbus Deployment Assessment

Example of Physical Design: Hazardous Area Easier live maintenance: -Exi - ExnL What device and component hazardous area certification is required? -FISCO devices for FNICO -Entity Exi devices for Entity ExnL

Singapore FPSO Seminar - 21 August 2009


8

Engineering Phases
FEED Phase
Fieldbus Deployment Assessment

Engineering Phase
Fieldbus Technical Training

Fieldbus e dbus Application Workshop Simulation Test

Design / Segmentation

Singapore FPSO Seminar - 21 August 2009


9

Training for Success


Training is a critical success factor for any projects For most projects the customer, EPC, and sub-contractors have not undergone extensive Foundation fieldbus training Standard training must be customized to the unique design and requirements of each project
Day 1 1) Foundation Fieldbus Technical Overview 2) Project Fieldbus Component 3) Segment Design ) g g 4) Fieldbus Installation 5) Field-Check and Troubleshooting Day 2 6) Transmitter - Fieldbus functionality 7) Valve Positioner - Fieldbus functionality 8) Fieldbus Systems Setup (Hands-on) 9) Roundup : Questions and Answers
Singapore FPSO Seminar - 21 August 2009
10

Fieldbus Application Workshop

EPC defines philosophy (rules) by which Fieldbus devices are allocated to the bus to achieve desired control availability

Workshop topics for discussion: Control Loop / Valve Criticality Ranking Application Scope of Foundation Fieldbus Cable Selection A Arrangement of JB, Grounding t f JB G di Redundant Philosophy Macro-cycle philosophy Function Block Requirement Controller Location (CIC/CIF) Zone Application

Consists of: - Definition of control loop criticality level - Restrictions for allocation for control criticality level - Analysis and ranking of control loops/valves Impacts: - Number of devices per bus - Number of loops per bus

Singapore FPSO Seminar - 21 August 2009


11

Functional Design Specification (FDS) Generated by the Project Team Common design philosophy document for all parties Appendix content: Hazardous area concept Components Wi i Wiring Design considerations Control strategy gy Etc.

Singapore FPSO Seminar - 21 August 2009


12

12

Fieldbus Implementation Methodology

(EPC)

EPC will load the segment based on process plot plan and results from Segment Design Tool, risk assessment, process criticality and equipment unit.

Segment Allocation = assigning devices to bus Segment Loading = block and communication timing Segment Design = calculate current and voltage S tD i l l t t d lt
Singapore FPSO Seminar - 21 August 2009
13

Fieldbus Segment Design Tool

Singapore FPSO Seminar - 21 August 2009


14

Fieldbus Implementation Methodology

EPC will load the segment based on process plot plan and results from Segment Design Tool risk assessment process criticality and plant unit Tool, assessment, unit. MIV will then validate for any software constraint and provide Fieldbus Segment Software Analysis to EPC.

Singapore FPSO Seminar - 21 August 2009


15

Fieldbus Software Validation p Report


Macrocycle VCRs and other resources

Singapore FPSO Seminar - 21 August 2009


16

16

Site Commissioning Phase


FEED Phase
Fieldbus Deployment Assessment

Site Commissioning Phase


Commissioning p Workshop

Engineering Phase
Fieldbus Technical Training

Final Review Loop Check & Commissioning

Fieldbus e dbus Application Workshop Simulation Test

Design / Segmentation

Singapore FPSO Seminar - 21 August 2009


17

Installation & Pre-commissioning Test Equipment q p


Establish procedure and checklist Hands-on training Installation test tools are made available in required quantity so as to not delay project Fieldbus power and signal simulator Fieldbus tester Oscilloscope R and C meter Pre-commissioning test tools are made available Fieldbus tester Handheld field communicator

Singapore FPSO Seminar - 21 August 2009


18

System modular in Zone

Singapore FPSO Seminar - 21 August 2009


19

System modular in Zone


Topsides plug&play concept Built & test as stand alone stand-alone Only electrical connections: power & network
M31 M10

M45

Singapore FPSO Seminar - 21 August 2009


20

M60

Technical solution for FPSO Cabinets with late IO binding g

Singapore FPSO Seminar - 21 August 2009


21

Software Configuration Flexibility


Database-Area: M10 - Separation AI module FF PID module FF Pump module Profibus

Modules in DCS Engineering Database

M10 Separation skid


AI PID

M41 - MCC
Pump

H1

Profibus

Classic & HART I/O

Fieldbus I/O
Singapore FPSO Seminar - 21 August 2009

22

Use of Bus Technology for FPSO

Safety

Data Acquisition

Control & Monitoring

Electrical

23

Digital system architecture that uses the power of field intelligence to improve FPSO performance
Singapore FPSO Seminar - 21 August 2009
23

Summary

Key success factors:


F Foundation Fieldbus already used in several FPSO d ti Fi ldb l d di l projects Fieldbus architecture fits well with modular construction approach of FPSOs FDS discussion helps to optimize design and save p p g cost Tools and Documentation by Vendor Training at all stages is vital for success 24

Singapore FPSO Seminar - 21 August 2009