Sie sind auf Seite 1von 2

Offshore Rig Move Plan

Last Updated Wednesday, 22 June 2011 15:06

The rig move procedure shall address the following points:

1. Rig move preparation


- Administration (Rig move plan) - Equipment Inspection - Weather

2. Preparation of new location


- Hydrographic surveys - Diving/seabed surveys - Preparation of jacket

3. Logistics
- Number of Boats - Navigation routes - Helicopters

4. Rig move descriptions


Preparation Pre-move plans Rig release Move safety meeting Line of responsibility Chart of responsibility Job Descriptions Daily move plan Lower/Raise rig procedures

5. Rig checklist 6. Critical lifts/operations 7. Pre-spud inspection

- Safety - General - Drill floor

1/2

Offshore Rig Move Plan

Last Updated Wednesday, 22 June 2011 15:06

Derrick Mud tanks Mud pumps Engines Equipment Drawworks

8. Daily move report 9. Rig orientation/workover drawings 10. Medivac procedures


- 12.1 Ambulance Drill - 12.2 Notification chart - 12.3 Emergency Instructions

11. Rig Move Review

2/2

Das könnte Ihnen auch gefallen