0 Bewertungen0% fanden dieses Dokument nützlich (0 Abstimmungen)
1K Ansichten13 Seiten
In most of the problems on time and work, one of the following basic parameters is to be calculated: (a) Time: Time needed by more than one person to complete a job or time for which a person(s) actually worked on the assigned job. (b) Work: The amount of total work (assigned) or the part of total assigned work actually done.
In most of the problems on time and work, one of the following basic parameters is to be calculated: (a) Time: Time needed by more than one person to complete a job or time for which a person(s) actually worked on the assigned job. (b) Work: The amount of total work (assigned) or the part of total assigned work actually done.
Copyright:
Attribution Non-Commercial (BY-NC)
Verfügbare Formate
Als PDF, TXT herunterladen oder online auf Scribd lesen
In most of the problems on time and work, one of the following basic parameters is to be calculated: (a) Time: Time needed by more than one person to complete a job or time for which a person(s) actually worked on the assigned job. (b) Work: The amount of total work (assigned) or the part of total assigned work actually done.
Copyright:
Attribution Non-Commercial (BY-NC)
Verfügbare Formate
Als PDF, TXT herunterladen oder online auf Scribd lesen