Beruflich Dokumente
Kultur Dokumente
Improvement of the appearance of the area 2. Socio-Cultural Impacts 1. Social bonding 2. Promotes cultural exchange and understanding between locals and tourists. Economic Impacts 1. Increase local employment 2. Improves local economy
NEGATIVE TOURISM IMPACTS Physical Impacts 1. Socio-Cultural Impacts 1. Excessive drinking, alcoholism 2. Crimes, drugs, prostitution Economic Impacts 1. Seasonal tourism creates high risk, under or unemployment issues 2. Jobs may pay low wages
RATIONALE
VISION
MISSION
OBJECTIVES: To give the tourist/visitors an assurance for their safety To refresh and to help them relax with the ambiance of the environment To promote the local product e.g. bamboo To give them additional recreational facilities
SUSTAINABILITY PLAN RECREATIONAL ACTIVITY DEVELOPMENT Sustainable Plan of Other Tourism- Related Establishments Description Building concrete bridge that will secure the safety of the tourists and visitors as well as to protect the recreational activity from damage during typhoon. Adding some amenities like boats to use while fishing and different types of plants that will enhance the ambiance of the place.
Sustainability This development will enhance the environment and the ambiance of the place. This will also add to the customer satisfaction that would help the place to be more popular. Adding these facilities will be their advantage from the other recreational activities. There will also be a person in charge in supervising this plan to know and evaluate if the development changes something for the better of their service for their customers and visitors.
Action Plan Timeframe 2 months Responsibility Private engineer Result Identifying the scope and the resources needed Concrete bridge is being build Boats are constructed Plants are in good condition and being placed along the bridge Local boaters are evaluated New attraction and activity opened to the tourist/visitors Est. Budget (PHP)
Objectives 1.Planning to build concrete bridge 2.Constructing of concrete bridge 3.Purchasing of boats 4.Purchasing of additional plants and flowers 5.Training of local boaters 6.Opening of the fishing village
Private engineer
Environmental Mitigation Plan Phase Pre-construction phase Construction Operation Impacts Mitigating measure Comments