Beruflich Dokumente
Kultur Dokumente
Address:
1206/B Mumtazabad Colony Multan Pakistan. Mobile: 00923476968665 Email: engr.adam@gmail.com
PROFILE
Proficient in KPI analysis, parameters fine tuning, pre and post drive test analysis. I am a fast learner with ability to work under pressure to achieve the desired commitments.
ACADEMICS
Bachelors in Computer Systems Engineering 2002 to 2006
ZTE TEAM LEAD CENTRAL3 REGION NPO PROJECT CHINA MOBILE PAKISTAN.
Currently heading Team of 7 Engineers NPO project in Central3 region of Pakistan.
Special Projects
MUHAMMAD ADAM IMAM TRX removal project of Low utilization cells to save the capex and improve the Utilization.
JOB EXPERIENCE AUGUST 2011 OCT 2011 RF OPTIMIZATION CONSULTANT (MOTOROLA TO NSN) VODACOM SRAN SWAP SOUTH AFRICA.
I have completed my assignment as RF Optimization Consultant Motorola to NSN Vodacom SRAN Swap Project in South Africa . I leaded the Optimization area for swap sites on daily basis includes BSC KPIs Optimization according to customer agreed SLA and getting acceptance of Swapped clusters .
MUHAMMAD ADAM IMAM Making MAIO plans for new sites. Frequency and Neighbour Planning for new sites. Adjustments of dedicated boundaries by tuning HYSTSEP. Making daily reports for benchmarking of parameters modification. Entertaining the customer complaints .
Network Audits
MARCH 2010 JULY 2011 TELENOR PAKISTAN (NOKIA SEIMENS NETWOKS) AS RF PLANNING AND OPTIMIZATION ENGINEER
Main responsibilities and tasks accomplished are:
MUHAMMAD ADAM IMAM Coverage , Quality and Capacity sites planning. Coverage prediction using Asset 3g. Making MAIO plans for new sites. Frequency and Neighbour Planning for new sites. Pre Launch Sites Optimization and getting acceptance of Pre Launch sites according to given criteria. Adjustments of dedicated boundaries by tuning HYSTSEP. SDCCH dimensiong for reduced SDCCH congestion. HR/FR Parameters setting for reduced TCH Blocking improving CSSR RX Acceslevel , NBLO setting for traffic shifting. Handover Success improvement on cell level by changing Pbgt (Power Budget parameter) and RX level and Quality values. Conducted parameter tuning of RLT, resulting in 20% decrease in the total call drops Traffic optimization for neighbor cells when new sites come on air. Sets KPI definition/threshold/formulae for reporting purposes. Generates Reports from different set of tools specifically for backup to ensure Quality monitoring. Implement different Radio Network Parameters to improve the performance of the radio network. Improve the CSSR 93% to 95%, DCR from 1.5% to 1.2%, HOSR 92% to 96% and MPD up to 20 minutes of the assigned BSCs areas. Redesigning of cells sites azimuth, HBA & tilting to overcome overshooting and to cater the weak coverage spots after integration of Phase IV. Different parameter settings have been trialed to shift traffic to 1800 band on appropriate level. Analyzing KPIs and Stats, and recommending changes and making Soft-launch and Pre-launch reports Identifying Causes of RF Interference Identifying causes of poor coverage, and making recommendations about the orientation changes, electrical tilts changes or antenna heights etc. Coordinating with BSS Teams to resolve Issues, such as Handover Failures, Frequency Interference, and Low Power TRXs. Neighbour Planning and neighbour audit.
Network Audits
Carrying out Bi-weekly audit to find BSC, Cell and Adjacencies parameter discrepancies and Generate WOs to remove such discrepancies.
Special Projects
Trial performed to optimize power control window so as to make sure good RxLev/Rxqual Samples while ensuring minimum interference. Restricted overshooting cells coverage areas through parametric adjustment. Retuned parameters to Push traffic from outer GSM to inner DCS zone in order to Optimize DCS utilization.
MUHAMMAD ADAM IMAM Extremely Remote Sites DCR and CSSR Optimization Project GSM and DCS Layer Utilization Project 900/1800 Drops Reduction Project HR/FR Utilization improvement Project for better user perception. Expansions of basis of TCH call setup blocking.
JUNE 08 TILL MARCH 2010 CHINA MOBILE PAKISTAN CENTRAL REGION (ZTE) RF PLANNING AND OPTIMIZATION ENGINEER
Main Responsibilities and Tasks accomplished were:
Special Projects
MUHAMMAD ADAM IMAM TRX removal project of Low utilization cells to save the capex and improve the Utilization.
JUNE 07 TILL JUNE 2008 (SHANGHAI TELECOM CMPAK PROJECT ) RF OPTIMIZATION ENGINEER
Main Responsibilities and Tasks accomplished were:
TRAININGS
NSN BSS Dimensioning Training(Duration:3 Days) Nokia Seimens Networks, Pakistan
TECHNICAL TOOLS
Tools:
1. TEMS Investigation 8.1.1 3. Optima 5. MAP INFO 8.0 7. Auto Cad 9. Plan Edit 11. Actix 13. Minos(ZTE) 2. 4. 6. 8. 10. 12. 14. Asset 6.1 Net Act 5.1 GOOGLE EARTH Ericsson MCOM SONAR OMCR ZTE IBSC ZTE
Operating Systems
Microsoft Windows (98, 2000, xp)
REFERENCE
Will be furnished on request