TESTING & COMMISSIONING REPORT FOR PROCEDURE NO: T&C/T& C P/AIS-GIS/001 SWITCHYARD EQUIPMENTS &SWITHGEARS

PROJECT-765/400 KV UNNAO PROJECT CLIENT-CROMPTON GREAVES LMITED OWNER UTTAR PRDESH POWER TRANSMISSION CORPORATION LIMITED
EXECUTED BY-LARSEN & TOUBRO LIMITED-ECC DIVISION Pre Commissioning Tests For Lightning or Surge Arrester Rev-3 Page 1 of 3 Bay/Feeder No-801 1B Equipment IdentificationLA Date-2-2-2012

PRE COMMISSIONING TESTS FOR LIGHTNING ARRESTER OR SURGE ARRESTER DETAILS OF EQUIPMENT: LOA No. Make Type: Sl. No. : : : : EPU/RA/UPPTCL/CA-02 XIAN XD ARRESTER CO LTD METAL OXIDE SURGE ARRESTER R-Phase: 8830 R-Phase: 2010 BAY-1B 765kV Remarks, Record discrepancies, if any Y-Phase: 8936 Y-Phase: 2010 B-Phase: 8834 B-Phase: 2010

Year of manufacture: Feeder Name Voltage Rating S. No. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. : :

12. 13.

14.

Post Installation check list Description Status Yes No Equipment is cleaned and free from dust / dirt, foreign Yes materials etc. Equipment is free from all visible defects on physical Yes inspection Support structure and surge counter has been provided Yes with double earth All nuts and bolts are tightened correctly as per specified Yes torque Equipment erection is complete in all respect Yes Permanent Labeling and identification is done Yes Leveling and alignment of structure and base frame is Yes checked All insulators and surge counter are free from any Yes physical defect Tightness of nuts bolts of terminal connectors are Yes checked Erection completion certificate along with list of Yes outstanding activities reviewed Check one end of surge counter is connected to the Yes bottom of LA stack and one end of surge counter has been earthed The direction of the exhaust vent ports away from the Yes protected equipment and other arrester poles Clearance from the arrester to earthed objects and from Yes the arrester pole to another arrester pole maintained as per outline drawing and all erection has been done as per drawing issued by Engg. Deptt. Serial number and sequence of LA parts for erection of Yes multi stack LA is checked

TESTING & COMMISSIONING REPORT FOR PROCEDURE NO: T&C/T& C P/AIS-GIS/001 SWITCHYARD EQUIPMENTS &SWITHGEARS
PROJECT-765/400 KV UNNAO PROJECT CLIENT-CROMPTON GREAVES LMITED OWNER UTTAR PRDESH POWER TRANSMISSION CORPORATION LIMITED
EXECUTED BY-LARSEN & TOUBRO LIMITED-ECC DIVISION Pre Commissioning Tests For Lightning or Surge Arrester Rev-3 Page 2 of 3 Bay/Feeder No-801 1B Equipment IdentificationLA Date-2-2-2012

15. 16.

Alignment of corona rings are checked After charging, leakage current on the surge counter is checked within safe limits

Yes

IR VALUE TEST Insulation resistance measurement using 5 kV Megger: (min. >1000M ) Sl. No. Between Phase R- Phase Y- Phase 1 2 3 4 5 1st stack and Earth 2nd stack and Earth 3rd stack and Earth 4th stack and Earth Support Insulator to Earth >1T 173G 298G 648G 388G

B-Phase >1T 203G 385G 417G 239G

Surge counter reading: Sl. No.

Reading R-Phase

Phase Y-Phase 3 to 5

B-Phase 1 to 3

1.

Counter Reading

1 to 3

CALIBRATION STATUS TABLE TEST INSTRUMENT DETAILS:

VOLTECH

L&T

CGL

UPPTCL

TESTING & COMMISSIONING REPORT FOR PROCEDURE NO: T&C/T& C P/AIS-GIS/001 SWITCHYARD EQUIPMENTS &SWITHGEARS
PROJECT-765/400 KV UNNAO PROJECT CLIENT-CROMPTON GREAVES LMITED OWNER UTTAR PRDESH POWER TRANSMISSION CORPORATION LIMITED
EXECUTED BY-LARSEN & TOUBRO LIMITED-ECC DIVISION Pre Commissioning Tests For Lightning or Surge Arrester Rev-3 Page 3 of 3 Bay/Feeder No-801 1B Equipment IdentificationLA Date-2-2-2012 Calibration status 05/07/2012 06/07/2012 16/05/2012 17/06/2012 23/06/2012 18/06/2012 20/06/2012

Sl.no 1. 2. 3. 4. 5. 6. 7.

Instrument description LT MEGGER (Analog) HT MEGGER (Analog) DIGITAL MULTIMETER AC CURRENT LEAKAGE TESTER CONTACT RESISTANCE KIT DIGITAL HT MEGGER DIGITAL CLAMPMETER

Range 500 V DC (2.5-5.0) KV DC (0-1000) V AC (0-100) A 100 A (0.5-5) KV DC (0-2000) A

FINAL DOCUMENTATION REVIEW : A. Final documents of Pre-Commissioning Checks Reviewed and Approved YES / NO B. Documents regarding Spares, Equipment ,O&M Manuals etc available YES / NO at site for O&M purpose C. After Modification, If Any, AS BUILT DRAWINGS are available at site YES / NO

VOLTECH

L&T

CGL

UPPTCL