to view list of products found based on my entered search criteria (Search Result screen) I want to be able to view detailed product information (Product Detail screen - Generic section) I want to be able to view R3 and EPH data (Master Data Set-up from SAP - IR - Integrity) System should be developed using Visual Studio 2010 Sprint 2 (July 11 - August 5) I want to be able to build short/long description by selecting 6 product characteristics (Product Detail screen - Translation tab)
I want to be able to view more R3 data (Master Data Set-up from SAP - IR - Integrity)
I want to be able to select appropriate GSU & SU factor (Product Detail screen - Generic section) Depending on user role, a Category Manager should have different field access than a Planner (Role and Access Set-up for Category Manager and Planner; Field Level Security Set-up for Category Manager and Planner) I want to be able to view all screens pertinent to Product Create Process (Complete UI design; Populate check lists and Implement cascading drop down logic for NMC process) I want to be able to view NMC email screens (Email prototype) Sprint 3 (August 8 - September 9) I want to be able to create new product from scratch (Create Product menu, screens, and full functionality; NMC email screens, full functionality and delivery) and save my work I want to be able to create new product using copy function (Copy Product menu, screens, and full functionality; NMC email screens, full functionality and delivery) and save my work User should see on-screen indicator for different types of fields On Save, I should receive error messages if required fields are blank Test Reminder: My Product check box set up SP data library for SP report. Assign search result SP report to Julien Sprint 4 (September 12 - October 7) workflow Output (red/nmc fields) DYP process, screens, validation, etc
FMC process, screens, validation, etc ddl logic for yellow & green Complete email for yellow & green start discussing report outcome for nightly validation Sprint 5 (October 10 - November 4)
I want to be able to view APO and GATP data (Master Data Set-up from APO/GATP - IR Integrity) - display APO & gATP data for existing product - populate drop down with APO & gATP values for create/copy screens
Validation Engine (August 8 - November 8 TBD) validation rules for red (on save validation: null check & validation to create) Provide nightly validation of material data of all materials. Report on validation outcome.
Home page
LATER PHASE??? Be able to attach any product related documentations Tab Web Summary R&E Tab Packaging Tab Design a mapping table for each type of packing vs. respective attribute Packaging - user will be able to see the case, pallet and packaging specifications. User will be able to see the case and pack barcode Planning Tab Tab Cost Tab for related products (later enhancement) R/3 summary
Comments
2 (July 11 - August 5) Full function incl generation of short/long description and display of read only corresponding values for existing materials For all 80+ fields to work with Omp to detemine what needs to be brought over from SAP to IR and also to determine check tables for all 80+ fields start on sprint 2 maybe needs to go over sprint 3/4 Full function incl display of applicable GSU & SU factor and display of read only corresponding values for existing materials Margaret & team to provide mapping file of product to CM and Planner to load into database. Margaret & team to provide list of NA CM & NA Planner
Closed
Open
Closed
Closed
August 8 - September 9)
26-Aug
ctober 10 - November 4)
23-Sep
1)decide which EU admin function applicable to NA in phase 1; create new admin function for NA (Field level access) KCP Access - any changes needed for NA specific 2)Admin function for changing planner name/snp id. Provide ability to both planner and admin 3)Admin function for changing cat mgr. Only admin can do this 1) Mapping exercise from respective systems 2) PI team to develop IDOC 3) Omp to set up IR for holding data 4) Offshore to complete Integrity mapping NOTE: step 2 - 4 can be done in parallel
e (August 8 - November 8 TBD) dependent on validation engine??? use validation engine to run nightly validation and then provide error report use validation engine to run nightly validation and then provide error report
Sl.No 1 2 3 4 5
Requirement Provide a thermometer to provide visual of product create completion Email notification on status change in Integrity Admin function to move from one category manager to another and also for planner Cascading drop down for Business L2 -> Business L4-> product category L5 Admin screens for managing roles & access (decide what sprint..most likely added to backlog) Prevent human error when reading Integrity screen & modifying SAP screen
Taken in Sprint?