Sie sind auf Seite 1von 3

Contract/Proposal No.

019988 POLYSMART POLYgeneration with advanced Small and Medium scale thermally driven Air-conditioning and Refrigeration Technology Integrated Project Call: FP6-2004-TREN-3 Priority: SUSTDEV-1.1.4 - POLYGENERATION Demonstration Projects

D3-22 SP2-System Assembled

Due date of deliverable: Actual submission date: Start date of project:

month 14 2008-07-30 2006-06-12 Duration: 48 months

Organisation name of lead contractor for this deliverable: Ikerlan Revision [final]

Project co-funded by the European Commission within the Sixth Framework Programme (2002-2006) Dissemination Level Public Restricted to other programme participants (including the Commission Services) Restricted to a group specified by the consortium (including the Commission S i ) Confidential, only for members of the consortium (including the Commission Services)

PU PP RE CO

019988 POLYSMART

D3-22 SP2-System Assembled

Subproject SPxx system assembled/erected


1) Description of assembled system The CHP oulet is directly connected to the TDC in order to reach the maximum tenperature at TDC inlet driving circuit. In the return line there is a mixing valve that mixes water from the TDC outlet and from the hot storage in order to keep the CHP inlet below 78C. In case of the hot tank reaches 78C there is an emergency dry cooling tower to reject that waste excess heta.
PolySMART SP2:HS with monitoring devices
V10 - 2008/04/10
EM302 EM505 EM301 EM412 EM 206 QM205 QM403 FM202 EM2061 EM2062 TimM207 NStM208 TimM413 NStM414 QM411 QM5031 TM409 TM5011 EM3021 TM410 TM5021 WP-5 TM402 FM408 FM5001 EM3022

5.5 kW

TM203 TM204

FM400

FL RL

FL FL

TM401

CHP G
RL
VM209 TM201 WP-1

TDC
RL
TC405 TC406 FM404

FL RL

WP-6

AB Vv31 A B

QM407

A AB B Vv33
TM806 TM807

QM801

FM200 TM901

TM803 QM800 TM804 QM903 TM805

Vv35 AB Vv32 A Vv34


TM902

TM808

TM809

B AB FL

FM900

EM3002 WP-8 TM7012 TC 1023 TC 1022 TC 1021 QM7031 QM708 TC7011 TM706 WP-7

Security dry cooling tower

TM5012

TC5022

FM5002 TM7021 TM707 QM7032

TC 100

QM5032

TM7022

FM7001 FM705 HM 1031

HM 1032

HM 1033

V1 V2 V3 V4

EM904

HM 101

FC7002 TimM7042

VvDHW V1 V2 V3 V4

V1 closed in summer, V3 closed in winter and summer V2 closed in winter, V4 alllways open
EM300

EM3001 TimM7041 TimM709

DHW

Kind of load, building description The installation is used to air-condition a corridor (60 m2) and the combustion laboratory (120m2) of Ikerlan facilities sited in Vitoria-Gasteiz, Araba, Spain (Latitude 4251 N, Altitude 525 m). The building was built in 1999 following the NBE-CT-79. The number of degree days based on 18C for cooling are 308 and for heating are 2100. A consumption of 200 litres/day of DHW has been added to the installation. Heat and cold distribution system Fan coils are used for corridor and there are radiant panels on the ceiling of the combustion laboratory. Heat rejection Dry air cooling tower is used for heat rejection. With 36 l/min water flow rate at 50C and 7580 m3/hr air flow rate, at 35C, the dsipation capacity is 20.6 kW.

Revision [final]

page 2 of 3

019988 POLYSMART

D3-22 SP2-System Assembled

mCHP Senertec DACHS HKA G5.5. The nominal electricicy capacity is 5.5 kW and the thermal capacity is 12.5 kW. It is fueled with Natural Gas. The electrical eficiency is 26.8% and global efficiency is 88%. TDC Rotartica 045. The cooling capacity is 4.5Kw and COP of 0.62 when the driving tenperature is 90C, recooling tenperature is 35C and the chilling temperature outlet is 12C. Storage Hot storage tank 370 liters Cold storage tak 1000 liters Data acquisition system Agilent and Field Point Sensors List of sensors from the CMD and SMD.

2) Pictures of assembled system Control and Monitoring Cabinets

Hot & Cold Storages SENERTEC CHP, 5.5kWe, 12.5 kWth ROTARTICA Absorption unit, 4.5 kWc Heat rejection units on the roof

Control & Monitoring desk

Revision [final]

page 3 of 3

Das könnte Ihnen auch gefallen