Sie sind auf Seite 1von 11

JOINTING AND BRANCHING PROCEDURE FOR PIGGY BACK DROP DUCT

While this information is presented in good faith and believed to be accurate, Dura-Line India Pvt. Ltd. does not, however, guarantee satisfactory results from reliance on such information due to the many variables attendant with every situation. Persons or parties utilizing this publication are solely responsible for the proper selection, installation, operation, maintenance and utilization of all products, nor as a recommendation to use any product in conflict with the intellectual property rights of any third party. Dura-Line reserves the right, without notice, to after or improve the design or specifications of the products described herein.

CONTENTS

S.no Particulars 1.0

Page

Introduction....4

2.0 Tools and Materials Required...5 Tools 2.1 2.2 2.3 2.4 2.5 Materials 2.6 2.7 2.8 2.9 3.0 Normal duct push fit coupler...6 Micro duct push fit coupler, Simple plug & End cap6 Service Cable Connector.6 Heat Shrink Rubber...7 Simple Duct Cutter..5 Rotary Duct Cutter...5 Armored Cable Cutter.....5 Micro duct straight cutter.5 Micro duct round cutter....5

Case Study..7 3.1 Joining of Piggy Back with Service wire, Co-axial Cable, Micro Duct and Normal Duct 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 3.2 Normal Duct preparation7 Micro duct preparation7 Service wire Cable Preparation.8 Co-axial Cable preparation.8 Joining of Piggy Back8

Joining of Piggy Back with Service wire and Normal Duct 3.2.1 3.2.2 Normal Duct preparation..8 Service wire Cable Preparation...8

3 3.2.3 3.3 Joining of Piggy Back ....9

Joining of Piggy Back with Micro Duct and Normal Duct 3.3.1 3.3.2 3.3.3 Normal Duct preparation9 Micro duct preparation 9 Joining of Piggy Back ..10

3.4 3.5

Joining of Piggy Back with Service wire, Co-axial Cable and Normal Duct..10 Joining of Piggy Back with Co-axial Cable, Micro Duct and Normal Duct.10

4.0

Contact Information...10

1.0

Introduction

This bulletin outlines the procedure for Jointing and branching procedure for Piggyback Drop duct Dura-line has always been a pioneer in developing new ducting technologies for deployment in non-traditional ways. Piggyback drop duct is the latest addition to our broad portfolio of alternative rights-of-way solutions. . Piggyback Drop Duct is a multi-pair service wire and/or coaxial F-dropwire "piggybacked" on permanently lubricated SILICORE drop duct. One step installation provides current service wire drop needs and a SILICORE permanently lubricated path for future coaxial or fiber optic upgrades as well as for service restoration. Any customer-specified service wire may be combined with any drop duct size. Usable with all currently deployed plows. The SILICORE lining provides permanent lubrication for ease of cable placement in future years. One step installation provides current service wire drop needs and a SILICORE permanently lubricated path for future upgrades to fibre as well as for service restoration. Any customer-specified (2, 3 or 5-pair) service wire may be combined with any drop duct size usable with all currently approved cable plows SILICORE lining provides permanent lubrication for ease of placement in future years.

Figure 1(a) Features


Figure 1(b)

Accommodates current service drop needs and provides a permanently lubricated path for upgrades or service restoration Any size drop duct may be combined with any size drop wire SILICORE permanent lubrication Sequential footage markings Rugged HDPE construction Available empty or with preinstalled pull line Standard wire preparation and termination techniques used Available with single drop wire on duct (as shown) or 2 drop wires in stacked configuration.

2.0 Tools and Materials Required If any cut occurs, we require following given tools to repair micro ducts, micro cables Tools 2.1 Simple Duct Cutter Simple duct cutter with sharp cutting blade makes a fast, clean and burr-free cut in ducts. Rotary Duct Cutter It is used for making perfectly straight, clean and burr-free cut in ducts up to 63 mm size to facilitate leak-proof coupling. Armored Cable Cutter: Utilized for cutting of Armour in OFC cables. Cable can be easily loaded in to tool. Adjustable cutting depth prevents damage to the Fibre Long lasting high-speed steal blade improves

2.2

2.3 insulation. productivity. 2.4

Micro duct straight cutter This cutter differs from the straight cutter in that it cuts just the Micro Duct itself, not the Micro Cable inside.

Figure 2.4 2.5 Micro duct round cutter This cutter gives a very nice 90-degree cut, which is required at the Micro Duct splice point.

6 Figure 2.5 Materials 2.6 Repair Kit

Figure 2.6 2.7 Normal duct push fit coupler Push-fit type having push-lock mechanism, which enables its installation without pre-dismantling without using skilled labor and installation tools. Micro duct push fit coupler, simple plug & end cap

2.8

Simple Plug

Push fit connector

End Plug Figure 2.8

2.9

Heat Shrink Rubber This is semi flexible, heat shrinkable tubing with melt able adhesive inner lining designed to provide moisture proof sealing to a wide range of substrates such as electrical wire splices, cable jackets, wire breakouts and electrical components. The high shrink ratios mean that only seven sizes are required to cover a wide range of substrate diameters. Typical applications are environmental sealing of electrical components including wire splices and harness breakouts as well as sealing cable ends against moisture ingress.

Figure-2.9 3.0 Case Study

3.1 Joining of Piggy Back with Service wire, Co-axial Cable, Micro Duct and Normal Duct 3.1.1 Normal Duct preparation & Joining Get Normal duct out from the piggyback duct.

Insert one part of duct in push-fit coupler, insert another part of duct from another side of same coupler till marked line 3.1.2 Micro duct preparation & Joining Remove micro-duct out from the piggyback duct. Make 90 degree cut on micro-duct by Micro-duct Straight Cutter.

Insert one part of micro-duct in Micro push-fit coupler till line given on push-fit coupler; insert another part of micro-duct from another side of same coupler till marked line. Check push-fit couplers grip on micro-duct.

Figure- 3.1.2 3.1.3 Service wire Preparation & Joining Remove service wire from Piggyback duct. Join both end of service wire by using service wire repair kit. Use tape over joint.

3.1.4 Co-axial Cable preparation & Joining Remove Co-axial cable from Piggyback duct. Join both end of Co-axial cable by using their repair kit. Use tape over joint.

3.1.5 Joining of Piggy Back The Co-axial cable, service wire and Micro Duct on Piggyback Duct is lightly bonded to the drop duct and is easily removed for wire preparation. Colored over sheath is easily removed from wire and does not interfere with normal wire preparation. Once you join all Normal Duct, Service Wire Cable, Co-axial Cable and Micro Duct, Use tape to combine all said ducts and cable. Install heat shrink sleeves for making joint, waterproof. Do not forget using of aluminum foil to avoid excessive heating, which may cause to damage piggyback duct. 3.2 Joining of Piggy Back with Service wire and Normal Duct 3.2.1 Normal Duct preparation & Joining Get Normal duct out from the piggyback duct.

Insert one part of duct in push-fit coupler, insert another part of duct from another side of same coupler till marked line

9 3.2.2 Service wire Cable Preparation & Joining Remove service wire from Piggyback duct. Join both end of service wire by using service wire repair kit.

Use tape over joint

3.2.3 Joining of Piggy Back The service wire on Piggyback Duct is lightly bonded to the drop duct and is easily removed for wire preparation. Colored over sheath is easily removed from wire and does not interfere with normal wire preparation Once you join all Normal Duct and Service Wire Cable, Use tape to combine all said ducts and cable. Install heat shrink sleeves for making joint, waterproof. Do not forget using of aluminum foil to avoid excessive heating, which may cause to damage piggyback duct. 3.3 Joining of Piggy Back with Micro Duct and Normal Duct 3.3.1 Normal Duct preparation & Joining Get Normal duct out from the piggyback duct.

Insert one part of duct in push-fit coupler, insert another part of duct from another side of same coupler till marked line 3.3.2 Micro duct preparation & Joining Get micro-duct out from the piggyback duct. Make 90 degree cut on micro-duct by Micro-duct Straight Cutter.

Insert one part of micro-duct in Micro push-fit coupler till line given on push-fit coupler; insert another part of micro-duct from another side of same coupler till marked line. Check push-fit couplers grip on micro-duct.

10

Fig.-3.3.2

3.3.3 Joining of Piggy Back Once you join all Normal Duct and Micro Duct, Use tape to combine all said ducts and cable. Install heat shrink sleeves, for making joint, waterproof. Do not forget using of aluminum foil to avoid excessive heating, which may cause to damage piggyback duct.

1. Twist end of wire to break bond.

2. Separate wire (with3. Ripcord in wire may 4. Wire may be be used to cut color oversheath intact) handled in normal from duct to needed oversheath and wire fashion. length. sheath.

3.4

Joining of Piggy Back with Service wire, Co-axial Cable and Normal. Duct We can join this kind of piggyback duct by following steps given in contents 3.1

3.5

Joining of Piggy Back with Co-axial Cable, Micro Duct and Normal Duct. 10

11

We can join this kind of piggyback duct by following steps given in contents 3.1

4.0

Contact Information:

Dura-Line India Pvt. Ltd.


A-10, Sanskrit Bhawan Aruna Asaf Ali Marg Qutab Institutional Area New Delhi - 110 067 (India) Tel: +91-11-51734157/51733606 Fax +91-11-51716816 duraline@duralineindia.com www.duralineindia.com

11

Das könnte Ihnen auch gefallen