Sie sind auf Seite 1von 4

CURRICULUM VITAE

PERSONAL DETAILS
Name Date and Place of Birth Marital Status Address E-mail Phone Mobile Phone : Rizki Oktowiandi, ST : Oct 03, 1981, Jakarta : Single : Jl. Chairil Anwar C/27 Bekasi : oki_speedy@yahoo.co.id : (021) 8802423 : +6283869691133

LANGUAGE
English Indonesia

QUALIFICATION
Project Coordinator Controlling project progress. Manage BTS and Radio Transmission instalation, commissioning team. Perform project progress report and time schedule. test &

Commissioning Engineer Test & Commissioning ( Huawei MA 5600 DSLAM & MD 5500 OAN ), BTS and Radio Transmission, Test & Commissioning FIU ( Flexi hoper),OptiX RTN, NEC pasolink, FLEXI EGDE WCDMA, HUAWEI RBS 2G AND 3G . Microwave test & commissioning Crosconection,software activation and alignment (pointing). Measure VSWR with Anritsu Site Master, Bird Site Analyzer and Network Analyzer. Measure Gain Antenna/BTS Transmit with Power Meter. Measure BER. Perform BTS Radio Transmission Acceptance Test Procedure. BTS Troubleshooting and Maintenance. NMS Engineer Configuration of IP radio can incircuit one another and can controling in long distance with equipment nec to nec and rtn to rtn and nec to nec. CROSSCONECT Engineer Activated E1 from bsc until endsite and check data in bsc for port and make cross connect soft ware in osn to delivery data until end site to use on air site.
Curriculum Vitae

BSC Instalation Installation BSC Huawei

PROFESSIONAL TRAINING
27 june until 19 July 2005 Feb 2006 June 2007 May 2008 Sep 2008 Broadband Products Engineer at Huawei Training Center Shenzhen,China. Emerson Power System Optical Access Network (OAN) Optical Transmission System (DWDM) Huawei RTN & BTS Huawei 3900 2G/3G

EDUCATIONAL BACKGROUND
Sept 1999 Maret 2005 Bachelor Electrical Engineering Majoring in Electrical Engineering

PROFESSIONAL EXPERIENCES
Company Position Periode Job Description : PT. Tunas Graha Servindo : BSS Engineer : 7 April 2010 Present : 1. Maintenance site and handling alarm that be Happen. 2. Solve problem in the site and report to office. Company Position Periode Job Description : PT. Selnet Optima : Project Coordinator : Agustus 2008 Januari 2010 : 1. Make coordination with vendor, Project Office and instalation team. 2. Perform time schedule for instalation, commissioning & integration team. 3. Perform progress report to Project office. 4. Perform commissioning, integration BTS & MW 5. Perform Acceptance Test Procedure (ATP) 2

Curriculum Vitae

Achivements :1. Succesfull, Instalation, Commisioning and Integration Flexi EDGE WCDMA BTS and MW FLEXI HOPPER of Nokia Siemens Network for Telkomsel YOGYAKARTA (December 2008) 2. Successfulll, Commisioning, Integration and ATP (Acceptance Test Procedure) of NEC Pasolink, Huawei OptiX RTN Radio Transmission and HUAWEI BTS for Natrindo Telepon Seluler, Yogyakarta (Agustus 2008 Desember 2009), Purwokerto (Desember 2008 Desember 2009) 3. Succesfull, Instalation, Config ip for nec to nec nec to neo pasolink nec to rtn mw in jogja (July 2009) 4. Succesfull crossconnect E1 from bsc until endsite joint E1 bts until bsc and msc(Toc). Axis 120 site (from December 2008 until July 2009). Telkomsel 4 site (December 2008) using equipment NEC, Nokia, RTN, Minilink, Optik.

Company Position Periode Achivements

: PT. Inpar Saka Telekomunikasi : Engineer / Project Coordinator : April 2005 July 2008 : 1. Succesfull, Instalation, Commisioning Integration GSM XL Project in Pekanbaru. 2. Succesfull Instalation Sumatera Selatan. GSM XL Project in

3. Succesfull, Instalation, Commisioning and Integration Telkom Speedy Divre VII in Sulawesi Selatan. 4. I have been working Location survey for equipments Telkom Speedy Divre II in Jakarta, Bogor and Bekasi. 5. Succesfull, Instalation, Commisioning and Integration GSM Indosat Project in Sulawesi Selatan.

Curriculum Vitae

6. Succesfull, Instalation, Commisioning and Integration Telkom Speedy Project Divre II Jakarta. 7. Succesfull, Insatalation, Commisioning Rectifier Emerson BSC Telkomsel in Batam 8. Succesfull Instalation STP Indosat in Sumatera. 9. Succesfull Instalation, Commisioning and Integrasi Telkom MSOAN ( Optical Access Network ) Divre IV in Central Java and DIY ( Kandatel Purwokerto )

ADDITIONAL SKILLS
Software Multimedia software Operating System Hardware : Auto Cad, Office 97/2003/2007 : Adobe Photoshop CS, Adobe Ilustrator, Corel Draw, PCB Desingner : Windows , Linux : Computer Repair and Maintenace

PERSONAL ABILITY
1. 2. 3. 4. 5. Want to develop and upgrade skills and experiences Like to identify, predict, anticipate, and solve the problems Highly motivated and responsibility Delight to work hard and under pressure Team work player

Curriculum Vitae

Das könnte Ihnen auch gefallen