Structural Loads.
Live Load. - negative and positive wind pressure. - intermittent tensile stress. Dead Load. - Due entirely to the weight of the panel. - Load is constant and generally in shear.
Structural Glazing
Structural Glazing
Structural Glazing
Structural Glazing
Authorized Substrates.
Anodized aluminum. Polyester Powder coated aluminum. PVDF coated aluminum. Stainless steel. Glass Stone
Structural Glazing
Forbidden Substrates.
Structural Glazing
The curtain wall manufacturer is responsible for the structural integrity of the support frame.
Structural Glazing
10
Structural Glazing
11
The Glazing.
Structural Glazing
12
Structural Glazing
13
Structural Glazing
14
Structural Glazing
15
Structural Glazing
16
Structural Glazing
Project Check List. Drawing Review. Designing the Joints - Calculations. Adhesion and Compatibility testing. Prepare Method Statements. Quality Control. Factory / Site Visits.
18
Structural Glazing
Structural Glazing
19
Drawing Review.
Dow Corning will make comments and suggestions on all sealant details. Identifies components required for testing.
Structural Glazing
20
Structural Glazing
21
Structural Glazing
22
Structural Glazing
23
Structural Glazing
24
Structural Glazing
25
Adhesion Tests.
Samples tested to a modified ASTM C794 - 93 Initial testing. Aging test. Takes 3 weeks in total.
Structural Glazing
26
Compatibility Test.
Need to check all materials that the sealants comes into contact with i.e. gaskets, setting blocks, etc. There must be NO loss of adhesion of the sealant to the glass, and NO dis-coloration of the sealant. Takes 21 days of UV exposure.
Structural Glazing
27
Method Statements
Surface Preparation. Priming. Sealant type. Adhesion. Compatibility.
Structural Glazing
28
Quality Control.
The applicator of the structural sealant MUST carry out his own internal tests as the project is being carried out and to RECORD the results. These include adhesion tests, record lot numbers of sealants used with what frame, dates, cure times of the sealant etc.
Structural Glazing
29
Conclusion.
Structural Glazing is a partnership between the Designer, the Curtain Wall company, the Glass manufacturer and Dow Corning. If we all work together the outcome will be a successful project.