CONTENTS Sr. No. Description 1. 2. 3. 4. 5. 6. 7. 8. 9.

About POWERGRID Introduction About PARLI Project Surveying Foundation Tower Erection Stringing Compensation Forest Case Conclusion Page No. 1 2 7 12 24 30 33 35 39

ABOUT POWERGRIDP OWERGRID EM P OWERING THE NATION THROUGH NATIONAL GRID POWERGR ID is a central transmission utility, wholly owned by government of India which is entrusted with the task to install, own,operate, and maintain regional/national transmission network acrossthe length and breadth of the country. It is one of the largest and bestmanaged transmission utility in the world which is consistently profitmaking. POWERGR ID achieved unique distinction of being First P ower Utility and Second Company in the world to get certificate with IntegratedManagement System (IMS) as per Publicly Available Specification,PAS 99:2006 integrating requirements of

ISO 9001:2000 (Quality),ISO 14001:2004 (Environment) & OHSAS 18001:1999(Occupational Health & Safety Management System) after extensiveaudit. During the Financial Year 2007-08 POWERGR ID achievedanother milestone in its quest for excellence in quality m anagementand got certified to Social Accountability Standards SA 8000:2001 POWERGR ID, a Navratna P ublic Sector E nterprise, is one of the largesttransmission utilities in the world. POWERGR ID wheels about45%of the total power generated in the country on its transmission network. POWERGR ID has a pan India presence with around69480Circuit Kmsof Transmission network and116nos. of EHVA C& HV DC sub-stationswith a total transformation capacity of 77217M VA . W ith 17000M W Inter-regional P ower transfers capacity. POWERGR

ID has alsodiversified into Telecom business and established a telecom network of more than19,000Kms across the country. POWERGR ID hasconsistently maintained the transmission system availability at99.65% which is at par with the International Utilities.

ABOUT POWERGRID POWERGRID EM POWERING THE NATION THROUGH NATIONAL GRID POWERGRID is a central transmission utility, wholly owned by government of India which is entrusted with the task to install, own,operate, and maintain regional/national transmission network acrossthe length and breadth of the country. It is one of the largest and bestmanaged transmission utility in the world which is consistently profitmaking. POWERGR ID achieved unique distinction of being First P ower Utility and Second Company in the world to get certificate with IntegratedManagement System (IMS) as per Publicly Available Specification,PAS 99:2006 integrating requirements of

ABOUT POWERGRID POWERGRID EM POWERING THE NATION THROUGH NATIONAL GRID POWERGRID is a central transmission utility, wholly owned by government of India which is entrusted with the task to install, own,operate, and maintain regional/national transmission network acrossthe length and breadth of the country. It is one of the largest and bestmanaged transmission utility in the world which is consistently profitmaking. POWERGR

ID achieved unique distinction of being First P ower Utility and Second Company in the world to get certificate with IntegratedManagement System (IMS) as per Publicly Available Specification,PAS 99:2006 integrating requirements of ISO 9001:2000 (Quality),ISO 14001:2004 (Environment) & OHSAS 18001:1999(Occupational Health & Safety Management System) after extensiveaudit. During the Financial Year 2007-08 POWERGR ID achievedanother milestone in its quest for excellence in quality m anagementand got certified to Social Accountability Standards SA 8000:2001 POWERGR ID, a Navratna P ublic Sector E nterprise, is one of the largesttransmission utilities in the world. POWERGR ID wheels about45%of the total power generated in the country on its transmission network. POWERGR ID has a pan India presence with around69480Circuit Kmsof Transmission network and116nos. of EHVA C& HV DC sub-stationswith a total transformation capacity of 77217M VA . W

ith 17000M W Inter-regional P ower transfers capacity. POWERGR ID has alsodiversified into Telecom business and established a telecom network of more than19,000Kms across the country. POWERGR ID hasconsistently maintained the transmission system availability at99.65% which is at par with the International Utilities.

AB OUT P ARLI P R OJECT A new 400/220KV Sub-station and associated lines are underconstruction at Ambajogai (Parli) Dist.: Beed. The project is sanctioned byMinistry Of Power (Govt. Of India) vide letter Dt. 12/07/2004 PG datedJuly- 2006, has granted administrative approval and expenditure sanctionfor Transmission lines and Substation under WRSS-II scheme as perElectricity Act- 2003. This project is planned for System Strengthening aswell as supply power to Southern Maharashtra.There are two incoming lines.A. 400 KV H.V. Double Circuit, Wardha-Parli Transmission LineB. 400 KV H.V.Double circuit, Bhadravati-Parli Transmission line.Parli Substation has following three 400KV double circuit Outgoing lines.a. 400KV double circuit Transmission line to MSEB SubstationGirwalib. 400KV double circuit Transmission line to Pune (PGCIL) Substation.c. 400KV double circuit Transmission line to Solapur (PGCIL)substation.

400/220KV SUBSTATION: 1.

SUBSTATION LOCATION:New 400/220KV Substation is located on Parli-Beed State highway,village Shepwadi (Ambajogai), Dist: Beed. Total 15.79 hector land isacquired for Substation construction.Substation planned for two incoming lines, three outgoing lines,associated 400KV bays, Future Extension(220KV), Residentialbuilding, Office, Community Hall, LT switchyard, Fire fighting Pumphouse, etc.2. SITE LEVELING:Contract for Site leveling is given to M/s Nath Construction(Parli).Work for Site leveling is started in February2008, andcompleted in May-2008. Substation site is situated 653.30mtr aboveMSL. Site leveling is completed in five step of one meter heightdifference due to slope of land.3. BOUNDRYWALL:Contract for construction of Boundary wall was awarded to M/s.R.B.Jain (Parli) through LOA no. - WRI/C&M/AB/BW/Parli/LOA/2008/41/413 dated 06/06/2008. Work of construction of boundary wall is in progress and 80% of the constructionwork is completed. Total construction cost is 10,958,517/- INR.

4. SITE OFFICE:Construction of Site Office is awarded to M/s. Aanand Engineers,Parli. Work is started from 4 TH May 2009 and is under progress.5. RESIDENTIAL QUARTERS:Construction work of Residential Quarters is awarded to M/s.Rudrani Infrastructures Ltd. Aurangabad. Construction work is startedfrom 10 TH December, 2008 and is under progress.6. APPROACH ROAD:Construction work of Approach road with Culvert from main road(Parli-Ambajogai state highway) to Substation is awarded to M/s.B.D.Sanap. Work is completed in January-2009.7. SWITCHYARD:Construction, Equipment supply & Erection, Commissioning of 400KV switchyard is awarded to M/s. ABB Ltd. Foundation work forGantry is started. Supply of Sub-station equipment has also startedand some of the CTs, CVTs, and BPIs etc. are arrived at site.8. LT SUPPLY:Temporary Supply from nearest 11KV line & Commissioning of 11/0.440 Kv substation with Max. Demand of 100KVA with associatedmetering & switching arrangement is awarded to M/s. PratibhaElectrical Engineers, Ambajogai through L.O.A.-WRTS:B:DHQ:C&M:146/344 dated 15/07/2008.Transformer of 11000/440 v, 250KVA is received from WardhaSubstation. Temporary LT supply work is completed. INCOMING LINES: A.

/LQH :As per WRSS-II, System Strengthening in SouthernMaharashtra, A 400KV double circuit Quad Conductor Transmissionline is constructed to connect Parli Substation with WardhaSubstation.Preliminary Survey & Detail Survey is done by M/s JyotiStructure Ltd. Mumbai. Supply & Service Contract is also awardedto M/s Jyoti Structure Ltd. Mumbai.Brief Details of Wardha-Parli Tr. Line is given below: y Total line length- 345.879 Km y No. of Angle tower- 168No. y Total forest area:2.714 hector forest in Parbhani division (D-2 package)

Leave a Comment
You must be logged in to leave a comment. Submit Characters: 400

Project report
Download or Print 716 Reads Uploaded by harshraj086 Follow Download

TIP Press Ctrl-F to quickly search anywhere in the document.

44 p. Project report

25 p. NTPC TRANING PRESANTAION BY HARSHENDRA KUMAR

16 p. A PROJECT REPORT ON Upload a Document


back to bac

Search Documents

Follow Us! scribd.com/scribd twitter.com/scribd facebook.com/scribd About Press Blog Partners Scribd 101 Web Stuff Support FAQ Developers / API Jobs Terms Copyright Privacy

Copyright 2012 Scribd Inc. Language: English

Das könnte Ihnen auch gefallen