ANNEXURE - 1

ELEX India
PROJECT DETAILS CLIENT END CLIENT SUPPLIER REPORT DETAILS REPORT DATE Supply of Metallic Strutues For Electrostatic Precipitator - 4 Nos. Centroprojeckt Brazil / Qutotec M/s SAMARCO EASTERN ENGINEERS & ASSOCIATES ESP 2 - % Completion & Manufacturing Status at M/s Eastern 29-03-2012

ESP 2 - COMPLETION SUMMARY


Data Sum of sum of Sum of Runng WT Fab CompPnt Comp 195671.81 9493.62 205165.43 Sum of Tot WT % Running WT % Fab Comp % Pnt Comp

% Completion Criteria 5% RM issue 10% Marking 15% 20% 50% 5% Cutting Fit-up Welding Cleaning; Grinding

TYPE PLT STR Grand Total

DESCRIPTION Precipitator ceiling Side wall side wall 2doors Side wall 1 doors Upper side wall Lower side wall Hopper Cone External Frame bracing Internal Frame bracing External top girder Medium top girder External under girder Medium under girder@fix foot External frame strut medium frame strut

DRG 553161 553227 553228 553229 553230 553226 553307a 553345a 553255 553256 553234 553272 553277 553482 553231 553233

Qty 3 39 1 2 6 6 3 2 2 2 2 2 2 1 2 2

TOT WT 16183.56 30499.56 774.79 1556.84 2177.52 4315.02 72220.83 30811.2 4383 5110.62 6727.54 6768.54 5841.84 2703.89 7579.58 7511.1 205165.43

TYPE PLT PLT PLT PLT PLT PLT PLT PLT STR STR PLT PLT PLT PLT PLT PLT

COMP 95% 95% 90% 95% 95% 95% 60% 10% 95% 95% 95% 95% 95% 95% 95% 95%

Runng WT 16183.56 30499.56 774.79 1556.84 2177.52 4315.02 72220.83 30811.2 4383 5110.62 6727.54 6768.54 5841.84 2703.89 7579.58 7511.1

FAB DATE

PNT DATE

Status Painting due Painting due Painting due Painting due Painting due Painting due Painting due Under Fabrication Painting due Painting due Painting due Painting due Painting due Painting due Painting due Painting due

ANNEXURE - 1

ELEX India
PROJECT DETAILS CLIENT END CLIENT SUPPLIER REPORT DETAILS REPORT DATE Supply of Metallic Strutues For Electrostatic Precipitator - 4 Nos. Centroprojeckt Brazil / Qutotec M/s SAMARCO EASTERN ENGINEERS & ASSOCIATES ESP 2 - % Completion & Manufacturing Status at M/s Eastern 29-03-2012

ESP 2 - COMPLETION SUMMARY


Data Sum of sum of Sum of Runng WT Fab CompPnt Comp 195671.81 9493.62 205165.43 Sum of Tot WT % Running WT % Fab Comp % Pnt Comp

% Completion Criteria 5% RM issue 10% Marking 15% 20% 50% 5% Cutting Fit-up Welding Cleaning; Grinding

TYPE PLT STR Grand Total

DESCRIPTION

DRG

Qty

TOT WT

TYPE

COMP

Runng WT

FAB DATE

PNT DATE

Status

Baffle plate in precipitator hopper


Front baffle plate in precipitator hopper

552908b 552948a

3 1

205165.43 4656.99 PLT 577.54 PLT

15% 15%

4656.99 577.54

Under fabrication Under fabrication

210399.96