Designer Training Record

Trainer: Tranee: Classification: D1 Models Date Completed Tanks BD BDS CF PCW FT PF CODE and Procedure HLW U H Weld Procedures Weld Symbols Hydro Pressure Comments Date:

Electrical Symbols

Solidworks Part Assembly Drawing Weldment Properties

Mapics Bom Warehouse

Productivity You must complete 5 of the following units in a row in the allotted time given with no defects. If a mistake is found you start back from the beginning. Unit/Size Tanks BD BDS CF PCW FT PF Qty. Time (days) 3 2 1 3 1 1 2 Comments

Designer Training Record


Trainer: Tranee: Classification: D2 Models Date Completed Tanks BD BDS CF PCW FT PF Surge HW ST HWS ISH FPW FPS USG CODE and Procedure HLW U H S Weld Procedures Weld Symbols Hydro Pressure Pressure and Temperature Comments Date:

Electrical Symbols Electric Component Comprehension Sizing Electric Components

Solidworks Part Assembly Drawing Weldment Properties Configurations Sheet Metal Routing Edit/Create Blocks Mapics Bom Warehouse Change MO Create Part#

Productivity You must complete 5 of the following units in a row in the allotted time given with no defects. If a mistake is found you start back from the beginning. Unit/Size Surge HW ST HWS ISH FPW FPS USG Qty. Time (days) 5 5 5 3 5 3 3 3 Comments

Designer Training Record


Trainer: Tranee: Classification: D3 Models Date Completed Tanks BD BDS CF PCW FT PF Surge HW ST HWS ISH FPW FPS USG HVJ Autoclave Flextube DA Skid package Megatherm CODE and Procedure HLW U H S Weld Procedures Weld Symbols Hydro Pressure Pressure and Temperature Comments Date:

Electrical Symbols Electric Component Comprehension Sizing Electric Components

Solidworks Part Assembly Drawing Weldment Properties Configurations Sheet Metal Routing Edit/Create Blocks Design Table Config. Publisher Mapics Bom Warehouse Change MO Create Part#

Productivity You must complete 5 of the following units in a row in the allotted time given with no defects. With the exception of the HVJ. One (1) HVJ must be completed. If a mistake is found you start back from the beginning. Unit/Size HVJ Autoclave Flextube DA Skid package Megatherm Qty. Time (days) 15 5 7 5 7 10 Comments

Main Functions
Skills Model Tanks BD BDS CF PCW FT PF Surge HW ST HWS ISH FPW FPS USG HVJ Autoclave Flextube DA Skid package Megatherm CODE and Procedure HLW U H S Weld Procedures Weld Symbols Hydro Pressure Pressure and Temperature Designation (Fittings) Electrical Symbols Sizing Electric Components Solidworks Part Assembly Drawing Weldment Properties Configurations Sheet Metal Routing Edit/Create Blocks Design Table Config. Publisher Mapics Bom Warehouse Change MO Create Part# D1 D2 D3 Pass Note needs attention

X X X X X X X

X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X

X X X X X X

X X X X X X X X

X X X X X X X X

Electric Component Comprehension

X X X

X X X

X X X X X

X X X X X X X X X

X X X X X X X X X X X

X X

X X X X

X X X X

Date Plumbing ENRTY P1 ENRTY P2 Comments


Needs P1 Productivity

Garrison Reynolds $12.00 Rob Sullivan (Temp) $11.00 Average $11.50