Scope of Work

NO. 1 ITEMS Supply N/A ZTE ZTE SUBCONTRACTOR N/A SUBCONTRACTOR SUBCONTRACTOR SUBCONTRACTOR ZTE SUBCONTRACTOR SUBCONTRACTOR N/A SUBCONTRACTOR SUBCONTRACTOR ZTE ZTE Service N/A SUBCONTRACTOR SUBCONTRACTOR SUBCONTRACTOR N/A SUBCONTRACTOR SUBCONTRACTOR SUBCONTRACTOR SUBCONTRACTOR SUBCONTRACTOR SUBCONTRACTOR N/A SUBCONTRACTOR SUBCONTRACTOR

General Services Unpack and check according to packing list and keep all the at site during the construction 1.1 period 1.2 off-load all the goods provided by ZTE After works completed,put the excess materials and packing cases to appointed position , remove all waste from site and clean site. 2 Civil Works 2.1 Site Clearing and levelling 1.3 2.2 To build a Manhole(500X500X600) ,includinig cover 2.3 2.4 2.5 2.6 3 To construct retaining wall of the iron grid fence(11.7mX13.8m) including PVC pipe for draining To install the iron grille fence and razor wire(11.7mX13.8m) To build site floor 80mm gavel layer above compacted soil Put denoting board at site(600X400) Tower construction To Construct reinforced concrete foundations for a 45m height self-supporting triangular tower and supply materials required according to drawing Erect the tower Install platform if the relative materials have been given

3.1 Soil test (the test roport must be submitted) 3.2

Install a vertical cable-ladder for feeder cables,including ZTE ladder bracket,stringers,cable bracket and safety hoops etc 3.3 Construct a 45m height selfsupporting triangular tower Install and connect obstruction warning NAV. light on the tower.Laying cables from weather-proof junction box with ZTE photo-detector . Install a lightning spike (including install flat-steel for connecting earthing). ZTE SUBCONTRACTOR

Paint the tower with the paint provided by Subcontractor Subcontractor 3.4 Install all hot-dip galvanised antenna poles with tower mounting clamps on the tower. 4 5 6 7 Supply and construct a reinforced concrete foundations for shelter(4100mm3400mm300mm) to construct the foundation of 1 oil tank.The size is :1600mm3000mm300mm. NEPA Meter Plinth500x1000x300 Tower grounding system according to the drawing Fence grounding Shelter grounding(connect site grounding cable to the joint of the shelter ) Generator grounding(connect site grounding cable to the joint of the generators) NEPA meter grounding Tank grounding(connect site grounding cable to the joint of the generators) ZTE SUBCONTRACTOR SUBCONTRACTOR SUBCONTRACTOR ZTE SUBCONTRACTOR SUBCONTRACTOR SUBCONTRACTOR SUBCONTRACTOR SUBCONTRACTOR

Site grounding system (excluding tower grounding system)

SUBCONTRACTOR

SUBCONTRACTOR

Site gounding ring(exclude tower grounding net part) Pave all PVC pipes as drawing (exluding the pipe for retaining wall)

SUBCONTRACTOR

SUBCONTRACTOR