AS 50922009

Australian Standard
AS 50922009

CNG refuelling stations

This Australian Standard was prepared by Committee AG-009, Natural Gas Vehicle Refuelling Stations. It was approved on behalf of the Council of Standards Australia on 13 August 2009. This Standard was published on 1 October 2009.

The following are represented on Committee AG-009: Association of Accredited Certification Bodies Bus Industry Confederation CNG Refuelling System Suppliers Department for Transport, Energy and Infrastructure, SA Department of Consumer and Employment Protection, WA Department of the Premier and Cabinet, SA Energy Networks Association International Association for Natural Gas Vehicles Motor Trades Association of Australia State Public Transport Operations Interests

This Standard was issued in draft form for comment as DR 08098. Standards Australia wishes to acknowledge the participation of the expert individuals that contributed to the development of this Standard through their representation on the Committee and through the public comment period.

Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

Keeping Standards up-to-date


Australian Standards are living documents that reflect progress in science, technology and systems. To maintain their currency, all Standards are periodically reviewed, and new editions are published. Between editions, amendments may be issued. Standards may also be withdrawn. It is important that readers assure themselves they are using a current Standard, which should include any amendments that may have been published since the Standard was published. Detailed information about Australian Standards, drafts, amendments and new projects can be found by visiting www.standards.org.au Standards Australia welcomes suggestions for improvements, and encourages readers to notify us immediately of any apparent inaccuracies or ambiguities. Contact us via email at mail@standards.org.au, or write to Standards Australia, GPO Box 476, Sydney, NSW 2001.

AS 50922009

Australian Standard
CNG refuelling stations

Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

Originated as AG 5041987. Previous edition AG 9011996. Revised and redesignated as AS 50922009.

COPYRIGHT Standards Australia All rights are reserved. No part of this work may be reproduced or copied in any form or by any means, electronic or mechanical, including photocopying, without the written permission of the publisher. Published by Standards Australia GPO Box 476, Sydney, NSW 2001, Australia ISBN 0 7337 9260 X

AS 50922009

PREFACE
This Standard was prepared by the Standards Australia Committee, AG-009, Natural Gas Vehicle Refuelling Stations, to supersede AG 9011996, Code of Practice for NGV Refuelling Stations. It retains the same format and much of the previous text but with technical and editorial amendments reflecting changes to Standards and regulations that have occurred since AG 901 was last comprehensively reviewed. The objective of the Standard is to provide manufacturers, designers, regulatory authorities, testing laboratories, installers and similar organizations with minimum uniform requirements for the safety, installation, performance and operation of CNG refuelling stations. The minimum requirements set out in this Standard are to be read in conjunction withbut do not take precedence overany Statutory Regulations that may apply. In its preparation consideration has been given to (a) (b) (c) (d) (e) continuity of satisfactory operation of components and equipment; the prevention of injury to persons or property; the prevention of fire hazards and explosions; gas rules and regulations now in force; and relevant Australian Standards as identified in Clause 1.2.

The terms normative and informative have been used in this Standard to define the application of the Appendix to which they apply. A normative Appendix is an integral part of a Standard whereas an informative Appendix is only for information and guidance. Statements expressed in mandatory terms in notes to tables and figures are deemed to be requirements of this Standard.
Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

AS 50922009

CONTENTS
Page SECTION 1 SCOPE AND GENERAL 1.1 SCOPE ........................................................................................................................ 5 1.2 REFERENCED DOCUMENTS .................................................................................. 5 1.3 DEFINITIONS ............................................................................................................ 6 1.4 ADDITIONAL REQUIREMENTS FOR PUBLIC REFUELLING STATIONS.......... 9 1.5 APPROVALS.............................................................................................................. 9 1.6 SUPPLY ENQUIRIES................................................................................................. 9 SECTION 2 COMPONENTS 2.1 GENERAL ................................................................................................................ 10 2.2 GAS-FIRED APPLIANCES...................................................................................... 10 2.3 COMPRESSORS....................................................................................................... 10 2.4 PIPING (INCLUDING FLEXIBLE PIPING/HOSES AND TUBING)...................... 11 2.5 VALVES, PIPING AND TUBING COMPONENTS ................................................ 12 2.6 SAFETY DEVICES FOR PRESSURE PROTECTION............................................. 12 2.7 PRESSURE GAUGES............................................................................................... 12 2.8 ELECTRICAL EQUIPMENT AND WIRING........................................................... 12 2.9 REFUELLING HOSE ASSEMBLIES ...................................................................... 13 2.10 REFUELLING CONNECTORS................................................................................ 13 2.11 REFUELLING HOSE ASSEMBLY BREAKAWAY COUPLINGS ......................... 13 SECTION 3 INSTALLATIONS 3.1 PLANNING PERMISSION AND LICENCES.......................................................... 15 3.2 LOCATION, SECURITY AND PHYSICAL PROTECTION OF EQUIPMENT ...... 15 3.3 REFUELLING STATION ELEMENTS.................................................................... 18 3.4 INLET GAS SUPPLY EQUIPMENT........................................................................ 19 3.5 GAS COMPRESSION EQUIPMENT ....................................................................... 19 3.6 COMPRESSED GAS STORAGE SYSTEMS ........................................................... 20 3.7 DISPENSERS/FILL POSTS...................................................................................... 20 3.8 HIGH PRESSURE DISCHARGE SYSTEM ............................................................. 21 3.9 SAFETY AND CONTROL SYSTEMS..................................................................... 23 3.10 POWER AND CONTROL ELECTRICAL SYSTEMS ............................................. 24 SECTION 4 TESTING AND COMMISSIONING 4.1 GENERAL ................................................................................................................ 25 4.2 STATION COMPLIANCE DOCUMENTATION..................................................... 25 4.3 WORKS TEST RESULTS ........................................................................................ 25 4.4 COMMISIONING DOCUMENTATION AND RECORDS...................................... 25 SECTION 5 OPERATION AND MAINTENANCE 5.1 GENERAL ................................................................................................................ 26 5.2 ESTABLISHMENT OF PROCEDURES .................................................................. 26 5.3 SUPERVISION ......................................................................................................... 28 5.4 RECORDS................................................................................................................. 28 5.5 SPECIFIC OPERATING PROCEDURES................................................................. 29 5.6 SPECIFIC MAINTENANCE, INSPECTION AND TESTING ................................. 29

Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

AS 50922009

Page APPENDICES A REGULATORY AGENCY INFORMATION ........................................................... 33 B TYPICAL LAYOUT OF MOBILE STORAGE UNITS ........................................... 36 C REFUELLING INSTRUCTIONS AND PROCEDURES .......................................... 37 D CHECKLIST FOR PUTTING THE STATION INTO SERVICE AND ANNUAL SAFETY INSPECTIONS OF REFUELLING STATIONS ....................................... 38 E HOT WORK PERMIT............................................................................................... 40

Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

AS 50922009

STANDARDS AUSTRALIA Australian Standard CNG refuelling stations

SECT ION
1.1 SCOPE

SCOPE

AND

GENERA L

This Standard specifies requirements for the design, construction, operation and maintenance of compressed natural gas (CNG) refuelling stations, which can be one of the following: (a) (b) (c) fast fill, where vehicles are filled in a period of minutes, analogous to liquid refuelling; time fill, where one or (in most cases) a number of vehicles are filled simultaneously over a period of some hours; or a combination of fast fill and time fill.

It does not cover equipment sizing and refuelling performance (the latter to be agreed between the purchaser and station constructor to suit the particular requirements of each station). This Standard does not cover the requirements for the following: (i) (ii)
1
Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

Liquefied Natural Gas (LNG) refuelling stations; or Vehicle Refuelling Appliances (VRA) installations, which are covered by AG 806.
Appendix D contains a checklist that provides guidance on the aspects of the station that should be checked prior to putting the station into service and during annual safety inspections. To the extent this Standard provides, in addition to minimum requirements, guidance in areas relating to the design and installation of CNG refuelling stations, such guidance should not be regarded as a design specification or an instruction manual. NOTES:

1.2 REFERENCED DOCUMENTS The documents below are referred to in this Standard. AS AG 807 1349 1530 1530.4 1674 1674.1 1725 1851 2030 2030.1 Approval requirements for natural gas flexible hose and hose assemblies for pressures above 2.6 MPa Bourdon tube pressure and vacuum gauges Methods for fire tests on building materials, components and structures Part 4: Fire-resistance test of elements of construction Safety in welding and allied processes Part 1: Fire precautions Chain-link fabric security fencing and gates Maintenance of fire protection systems and equipment Gas cylinders Part 1: General requirements
Standards Australia

www.standards.org.au

AS 50922009

AS 2441 2444 2473 2473.1 2832 2832.1 3814 4041 4332 4343 4564 5601 AS/NZS 1850 3000 3788

Installation of fire hose reels Portable fire extinguishers and fire blanketsSelection and location Valves for compressed gas cylinders Part 1: Specifications, type testing, and manufacturing tests and inspections Cathodic protection of metals Part 1: Pipes and cables Industrial and commercial gas-fired appliances Pressure piping The storage and handling of gases in cylinders Pressure equipmentHazard levels Specification for general purpose natural gas Gas installations Portable fire extinguishersClassification, rating and performance testing Electrical installations (known as the Australian/New Zealand Wiring Rules) Pressure equipmentIn-service inspection

60079 Explosive atmospheres 60079.10.1 Part 10.1: Classification of areasExplosive gas atmospheres (IEC 60079-10-1, Ed. 1.0:2008 MOD) 60079.17 Part 17: Electrical installations inspection and maintenance (IEC 60079-17, Ed. 4.0:2007 MOD) ISO 11439
Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

Gas cylindersHigh pressure cylinders for the on-board storage of natural gas as a fuel for automotive vehicles Road vehiclesCompressed natural gas (CNG) refuelling connector

14469

ANSI ANSI/IAS Basic Requirements for Compressed Natural Gas Vehicle (NGV) Fuel NGV 2 Containers CSA CSA B51 Part 2: Boiler, Pressure Vessel and Pressure Piping Code

1.3 DEFINITIONS For the purposes of this Standard, the definitions below apply. 1.3.1 Approved, approval Acceptable to, and meeting the prescribed standards of, the Technical Regulator (see Clause 1.3.22). 1.3.2 Authority Regulatory authority having jurisdiction or such authority as delegated (see also Technical Regulator).
NOTE: See Appendix A for more information.

Standards Australia

www.standards.org.au

AS 50922009

1.3.3 Compressed natural gas (CNG) A compressed gaseous fuel composed of natural gas of pipeline quality as defined in AS 4564. 1.3.4 Compressed gas storage systems Group of cylinders or pressure vessels connected together, which may or may not be connected into separate banks (i.e. sections), and complying with the requirements of this Standard. 1.3.5 Dispenser/fill post A unit for filling compressed natural gas into CNG cylinders, which may or may not incorporate metering. 1.3.6 Fire Resistance Level (FRL) The rating of the ability of an element of building construction to fulfil its required load bearing function, integrity and thermal insulation in a standard fire resistance test as determined in accordance with AS 1530.4 for (a) (b) (c) structural adequacy; integrity; and insulation.

It is expressed in minutes in the above order (e.g. 60/60/30). 1.3.7 Hazardous area (on account of explosive gas atmospheres) An area in which an explosive gas atmosphere is or may be expected to be present in such quantities as to require special precautions for the construction, installation and use of equipment. 1.3.8 Ignition source
Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

A source of energy sufficient to ignite a flammable atmosphere that may include a naked flame, exposed incandescent material, an electrical welding arc, a mechanical or static spark and electrical or mechanical equipment not suitable for use in a hazardous location.
NOTE: For the purposes of this Standard, a motor vehicle entering a hazardous area associated with any part of a refuelling station is not regarded as an ignition source.

1.3.9 Master shut off valve A quarter turn manual valve capable of being locked off but not locked on, in order to isolate all equipment downstream of the compressed gas storage system (see Clause 1.3.4). 1.3.10 Mobile gas storage Multiple cylinders or pressure vessels permanently mounted on a special carriage and used for the transportation of CNG to other refuelling stations. 1.3.11 Non-return valve A valve which permits flow in one direction only. 1.3.12 Operating pressure The internal pressure to that a pressure containing component is subjected under normal operating conditions. 1.3.13 Pressure Gauge pressure unless noted as absolute pressure.

www.standards.org.au

Standards Australia

AS 50922009

1.3.14 Protected place Any of the following: (a) A dwelling, place of worship, public building, school or college, child care facility, hospital, theatre or any building or open area in which persons are accustomed to assemble, whether within or outside the property boundary of the station. A factory, workshop, office, store, warehouse, shop or building where people are employed that is outside the property boundary of the station. A ship lying at permanent berthing facilities. Any storage facility for dangerous goods that is outside the property boundary of the station.

(b) (c) (d)

1.3.15 Public place Any place, other than private property, open to the public and including a street or road. Parking areas for commercial and public buildings are not considered public places. 1.3.16 Refuelling connector Joined assembly of refuelling nozzle and receptacle. 1.3.17 Refuelling nozzle Device that permits the safe, quick connection and disconnection of the refuelling hose assembly to the refuelling receptacle. 1.3.18 Refuelling receptacle Device connected to a vehicle or storage system that receives the refuelling nozzle and permits safe transfer of CNG. 1.3.19 Refuelling hose assembly
Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

An assembly incorporating a flexible hose, a breakaway coupling, a refuelling hose valve (where used) and a refuelling nozzle. 1.3.20 Refuelling hose valve A valve located in the refuelling hose assembly to stop the flow of gas and to depressurize the section between the refuelling nozzle and the valve. 1.3.21 Screen wall A structurally sound wall that (a) (b) (c) has a fire resistance level (FRL); is impervious to vapour; and is constructed of materials that are substantially resistant to attack by the substances being screened.

1.3.22 Technical Regulator Persons, bodies or other entities appointed by the government under applicable legislation in the respective state or territory to have jurisdiction over the implementation of safety and other standards and regulations applicable to any refuelling station. 1.3.23 Vapour barrier An impervious, non-combustible barrier constructed with the object of preventing the passage of vapour from any one place to another.

Standards Australia

www.standards.org.au

AS 50922009

1.4 ADDITIONAL REQUIREMENTS FOR PUBLIC REFUELLING STATIONS Additional requirements applying to public refuelling stations should be agreed on a case by case basis between the involved parties (station constructor, technical regulator(s), site owner and operator, and the relevant certifying/accrediting bodies). 1.5 APPROVALS 1.5.1 Technical Regulators requirements A refuelling station shall meet the requirements of the Technical Regulators.
NOTE: Refer to Appendix A for a list of regulators, functions and contact details in each jurisdiction.

1.6 SUPPLY ENQUIRIES 1.6.1 Gas supplier At a preliminary stage, an application should be addressed to the gas supplier regarding (a) (b) (c) (d) natural gas availability; supply pressure; gas specification; and gas connection, gas equipment and piping installation.

1.6.2 Electricity supplier At a preliminary stage, an application should be addressed to the electricity supplier regarding electricity supply and installation requirements.

Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

www.standards.org.au

Standards Australia

AS 50922009

10

SECT ION
2.1 GENERAL

COMPONENTS

Enquiries shall be made of the natural gas supplier to determine whether there are any components in the gas to be compressed that may adversely affect refuelling station components or negatively impact on fuelling operations (refer Clause 1.6.1(c)). All components shall be compatible with the natural gas to be compressed and shall be designed or selected for the full range of pressures, temperature and loadings to which they are subjected. Where the natural gas supplied has a water content that, in conjunction with prevailing ambient temperatures, gives rise to hydrate build-up to the extent that refuelling operations are affected, then consideration should be given to the use of a gas drying system. 2.2 GAS-FIRED APPLIANCES Gas-fired appliances used in the CNG refuelling station, e.g. gas engines for driving CNG compressors, shall meet the requirements of AS 3814.
NOTE: State gas supply regulation may require that such gas-fired appliances be certified.

2.3 COMPRESSORS 2.3.1 General These requirements apply to mechanically, electrically or hydraulically powered compressors designed for the compression of natural gas. Compressors intended for outdoor installation shall have all controls and electrical wiring adequately protected from climatic conditions to ensure safe and reliable operation.
Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

Compressors shall be provided with clear and permanent markings that are readily accessible and easy to read when the compressor is in the installed position. Such markings shall include the following: (a) (b) (c) (d) (e) (f) (g) Manufacturer's trade name. Model designation. Serial number and year of manufacture. Rated capacity at a designated inlet pressure. Maximum discharge pressure. Operating speed. Maximum and minimum supply pressure.

2.3.2 Separators Separators shall be fitted after compression stage coolers to remove, as far as is possible, any oil, water or condensate droplets present in the gas. 2.3.3 Separator drainage Provision shall be made for the removal and collection of any liquids accumulating in the separators. Any gas escaping with the drained liquid shall be separated and piped to the compressor inlet.

Standards Australia

www.standards.org.au

11

AS 50922009

The separator drainage system may be either manual or automatic. It shall be operated at frequencies that ensure the re-entrainment of intercepted liquids is avoided. 2.3.4 Compressor unloading/blow down systems Where an unloading/blow down system is incorporated the blown down gas shall be returned to the compressor inlet and be designed to ensure that the rated pressure of the inlet system is not exceeded. 2.3.5 Relief valves Each stage shall be fitted with a spring-loaded relief valve sized for the compressor capacity. The set pressure shall exceed the operational discharge pressure of the associated stages to the extent necessary to avoid discharge in normal service (typically 15% for inter stage and 10% for final stage relief valves) but shall not exceed the respective design rated pressures. Discharge piping of such relief valves shall be in accordance with Clause 3.8.2. 2.3.6 Instruments Gas compressors shall be fitted with indicators to monitor the following: (a) (b) (c) (d) (e) (f)
Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

Gas pressure(s)A pressure gauge that complies with Clause 2.7 shall be fitted after each stage of gas compression. Lubricating oil pressure(s) (if applicable)Equipment utilizing pressure lubrication system(s) shall be fitted with an oil pressure gauge (or gauges). Crankcase pressure (if applicable)Compressors with a crankcase operating under positive pressure should be fitted with a crankcase pressure gauge. Temperature(s)Temperature measurement shall be provided on the outlet of the compressor. Oil level(s)Provision shall be made to indicate all oil level(s). Provision shall be made to indicate hours run.

2.4 PIPING (INCLUDING FLEXIBLE PIPING/HOSES AND TUBING) 2.4.1 Gas inlet train components Gas inlet train components used shall be in accordance with AS 5601 and any additional requirements of the Technical Regulator (see Clause 1.3.22). 2.4.2 Compressor skid piping and hoses Piping and hoses from the flexible hose at the compressor inlet connection, between compression stages, coolers and separators and up to the non-return valve at the end of the compressor outlet flexible piping, shall be in accordance with the compressor manufacturers standard practice. The piping used shall have a rated pressure in excess of the maximum pressures that can occur in the locations where the piping is used. 2.4.3 Discharge piping/tubing Discharge piping/tubing shall be in accordance with AS 4041 or equivalent Standard. 2.4.4 Hose assemblies (other than compressor skid hoses) All flexible hose assemblies used for gas transmission at pressures above 2.4 MPa shall meet the requirements of AG 807. Flexible hose assemblies used for gas transmission at pressures below 2.4 MPa shall be suitable for natural gas service and have rated pressures in excess of the maximum pressures that can occur in the locations where they are used.
www.standards.org.au Standards Australia

AS 50922009

12

Flexible hose assemblies used for pressure sensing shall be suitable for natural gas service and have rated pressures in excess of the maximum pressures that can occur in the locations where they are used. 2.5 VALVES, PIPING AND TUBING COMPONENTS 2.5.1 General All valves, pipes and components such as strainers, compression fittings and no break couplings, separator bodies and similar fittings shall have a rated pressure in excess of the maximum pressures that can occur in the locations where used. In addition, materials, especially elastomers, shall be suitable for use with compressed natural gas. The manufacturer shall stamp, or otherwise permanently mark, valves and components to indicate the manufacturer's name or trademark and part number. Isolating valves shall operate with a quarter turn from open to closed. 2.5.2 Gas inlet train Valves and components up to and including the appliance valve(s) shall be in accordance with AS 5601. 2.5.3 Valves and components for the compressor skid From the compressor inlet to the non-return valve at the end of the compressor outlet flexible piping, valves and components shall comply with the compressor manufacturers standard practice. 2.5.4 Pressure valves Cylinder valves shall comply with AS 2473.1 or an equivalent Standard. 2.6 SAFETY DEVICES FOR PRESSURE PROTECTION Spring controlled pressure relief valves shall
Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

(a) (b) (c) (d)

be clearly marked by their manufacturer or agent with the pressure at which they are set to start to discharge; have a rated discharge capacity greater than the input capacity from the system; and not be fitted with lifting devices to prevent tampering by unauthorized persons; and incorporate a means for adjusting the pressure set point that can be sealed.

2.7 PRESSURE GAUGES Pressure gauges (a) (b) shall comply with AS 1349 or equivalent and shall have a dial graduated to read between 1.2 to 2 times the operating pressure; and
T T

shall comply with AS 1349 or equivalent where used on storage vessels and shall have a dial graduated to read between 1.2 to 2 times the maximum developed pressure.
T

NOTE: For gauges at operating pressures of 2500 kPa or above, special provisions apply in AS 1349.

2.8 ELECTRICAL EQUIPMENT AND WIRING All electrical wiring and equipment shall be suitable for the specific hazardous area in which it is located, in accordance with AS/NZS 3000.

Standards Australia

www.standards.org.au

13

AS 50922009

2.9 REFUELLING HOSE ASSEMBLIES Hose assemblies shall have rated pressures in excess of the maximum that can occur in the refuelling process for which they are to be used. These hose assemblies shall consist of (a) a refuelling hose complying with Clause 2.4.4 with appropriate end connections for attachment to the other hose assembly components. Hose assemblies shall be hydrostatically tested, after assembly and prior to use, to at least twice the maximum operating pressure for a minimum of 1 min. The hose assembly shall not leak, burst or suffer damage from pressurization when hydrostatically tested; a refuelling nozzle (see Clause 2.10) either as a separate refuelling nozzle or combined with a refuelling valve; a refuelling valve, which shall incorporate a means of depressurizing the refuelling connector to enable separation of the refuelling hose from the vehicle being filled; breakaway couplings in accordance with Clause 2.11; and a vent hose to convey the gas released from the operation of depressurizing the refuelling connector to a safe place.

(b) (c) (d) (e)

NOTE: Items (c) and (e) may not be required if the dispenser automatically depressurizes the refuelling nozzle and hose at the end of the fill.

2.10 REFUELLING CONNECTORS Refuelling connectors shall have rated pressures in excess of the maximum that can occur in the refuelling process for which they are to be used. They shall consist of refuelling nozzles and refuelling receptacles specifically designed for compressed natural gas service. The refuelling connector shall enable gas to be transferred to the vehicle gas containers of the vehicle being filled. When separated, the refuelling nozzle and refuelling receptacle shall be self-sealing. The refuelling nozzle shall be fitted to the refuelling hose assembly and the corresponding refuelling receptacle shall be fitted to the vehicle to be filled.
Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

For depot-based refuelling stations located on private property not available for use by the public, the type and size of refuelling connector shall be as chosen by the station owner or operator. For public refuelling stations, the refuelling connector shall meet the requirements of ISO 14469 (all parts). 2.11 REFUELLING HOSE ASSEMBLY BREAKAWAY COUPLINGS 2.11.1 Refuelling hose breakaway coupling The refuelling hose assembly shall incorporate a breakaway hose coupling designed to disconnect in the event of undue force being applied to the hose, such as a vehicle moving off with the hose connected. The coupling shall be designed in accordance with the following requirements: (a) The axial force required to separate the coupling shall be (i) (ii) (b) (c) less than 600 N for hoses of nominal bore below 12.5 mm; or less than 800 N for hoses of nominal bore of 12.5 mm or greater.

The coupling shall retain the gas within both sections of the hose after separation. The coupling shall be located so as to ensure that the breakaway force is applied axially.

www.standards.org.au

Standards Australia

AS 50922009

14

The coupling should be capable of being reassembled after separation, preferably without the use of special tools or the replacement of parts. 2.11.2 Vent hose breakaway coupling The refuelling hose vent line, if fitted, shall also incorporate a breakaway hose coupling. This coupling shall be designed so that the axial force required to separate it shall be less than 100 N. If the vent line is connected to the compressor system, a non-return valve shall be fitted to prevent a backflow toward the refuelling connector. 2.11.3 Refuelling hose assembly attachment The point of attachment of the refuelling hose assembly shall be capable of withstanding twice the combined force necessary to separate the refuelling and vent hoses without it causing damage or deformation.

Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

Standards Australia

www.standards.org.au

15

AS 50922009

SECT ION

I NSTA L L A T I ONS

3.1 PLANNING PERMISSION AND LICENCES Before commencing construction, all necessary permissions, licences and approvals shall be obtained from local planning authorities, the Technical Regulators and other Authorities. Licences to commission and operate shall be obtained, pressure vessels shall be registered and, depending on the quantities of CNG stored, licences for the storage of dangerous goods obtained. It is the responsibility of the owner of the CNG refuelling station to contact the Authorities and Technical Regulators to establish the timing and extent of the drawings and documentation to be submitted for approval for construction, commissioning and operation of the station.
NOTE: Appendix D contains a checklist that provides guidance on the aspects of the CNG refuelling station that should be checked prior to putting the station into service and during annual safety inspections.

3.2 LOCATION, SECURITY AND PHYSICAL PROTECTION OF EQUIPMENT 3.2.1 Non-public access installations on private property sites 3.2.1.1 General When locating refuelling station equipment within any site, the separation distances to public places, the overall site boundary and protected places, etc. shall satisfy local Authority planning requirements relating to potentially hazardous developments, occupational health and safety (OHS) regulations relating to dangerous goods and relevant Australian Standards. The impact of hazards arising from the presence of a CNG refuelling station and the reciprocal hazards to such a refuelling station from any adjacent potentially hazardous plant or equipment shall be taken into account. Where appropriate, e.g. when required by local authorities or OHS regulations, separation distances shall be established using quantitative risk analysis. In all cases, the location of the refuelling station plant elements shall ensure that the associated hazardous areas determined in accordance with AS/NZS 60079.10.1 are located entirely within the overall site boundary. All electrical equipment shall comply with and be installed in accordance with AS/NZS 3000. Any pre-existing electrical equipment shall be either upgraded to comply with these requirements or be relocated. For the purposes of this Standard, where a motor vehicle enters a hazardous zone associated with any part of the refuelling station, such a vehicle shall not be regarded as being an ignition source. Refuelling stations shall be protected against unauthorized entry by either (a) (b) specific equipment enclosures with sufficient lockable access doors/panels to provide satisfactory access for inspection, maintenance and repair; or a chain link security fence complying with AS 1725 for heavy duty service, having as a minimum, a height of 1800 mm and two lockable gates.
NOTE: This requirement may be satisfied by the overall site boundary fence provided it affords the same level of protection.

Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

www.standards.org.au

Standards Australia

AS 50922009

16

Dispensers shall be lockable or have other provisions for inhibiting their use when the site is not manned. All equipment shall be protected from damage from vehicle movements within the site by its location or by suitable walls, bollards, protective railing or other appropriate measures. 3.2.1.2 Compressed gas storage systems Compressed gas storages shall be located outdoors and separated from public places, the site boundary and protected places in accordance with Table 3.1. Screen walls may be used to reduce minimum separation distances as recommended in AS 4332. TABLE 3.1 STORAGE MINIMUM SEPARATION DISTANCES
Items from which separation is required Property boundary/public place or protected place Aggregate gas capacity of storage (m 3 ) (see Note 2) 150 >150 >600 >2 500 >10 000 Stores of other dangerous goods 150 >600 >2 500 >10 000 NOTES:
Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

Minimum separation distances (m) See Note 3 3 6 8 To be determined by risk analysis

600 2 500 10 000

150 600 2 500 10 000

3 3 5 8 To be determined by risk analysis

1 2

All gas volumes expressed in the above table are at 15C, 101.325 kPa absolute pressure. The minimum separation distances for aggregate capacities up to 600 m 3 correspond to those for container volumes (water capacities) up to 2000 L, as specified in AS 4332, with natural gas at a storage pressure of 25 MPa. For aggregate capacities up to 2000 L and storage pressures below 25 MPa, minimum separation distances determined by AS 4332 as a function of container volume shall apply. As determined according to AS/NZS 60079.10.1 or 2 m whichever is the greater.

3.2.1.3 Gas compression equipment, dispensers/fill posts and all vents For compression equipment and dispensers, vapour barriers may be used to reduce minimum separation distances. Any vapour barriers that are used shall be of a sufficient length to maintain the required minimum separation distances. The height of the vapour barriers shall be a minimum of 1 m above the height of the affected refuelling station element. Dispensers/fill posts shall have separation distances to public places, the site boundary and protected places, and other elements of the refuelling station as specified in Table 3.2.
NOTE: AS/NZS 60079.10.1 provides guidance on measurement of separation distances.

Standards Australia

www.standards.org.au

17

AS 50922009

TABLE 3.2 DISPENSER MINIMUM SEPARATION DISTANCES


Minimum distances (m) Items from which separation is required From the exterior surfaces of the dispenser/fill post Hazardous area distance to be used From the associated Zone 2 hazardous areas as per AS/NZS 60079.10.1 0 (see Note 1)

Property boundary/public place On site protected place Buildings Openings in buildings Combustible material storage, above ground flammable liquid or LPG tank Fixed ignition source

Hazardous area distance to be used Hazardous area distance to be used Hazardous area distance to be used Hazardous area distance to be used

0 0 (Note 1) 3 0 (Note 1)

Elements of the refuelling station Compressed gas storages Other refuelling station elements that are hazard area compliant Other refuelling station elements that are not hazard area compliant 3 (see Note 2) 0 Hazardous area distance to be used N/A N/A 0

NOTES: 1 2 Where the hazardous area is defined as starting from the end of the refuelling hose. This separation distance may be reduced to 0 where the vent gas arising from the depressurization of the refuelling connector necessary to release the refuelling nozzle from the refuelling receptacle is contained or safely vented to atmosphere outside of any hazardous area.

Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

3.2.2 Public access sites Additional requirements may apply to a public refuelling station. These shall be agreed to by the involved parties on a case by case basis. 3.2.3 Mobile storage units A parking bay shall be provided at both the compression station where the mobile storage unit is refilled and at the refuelling station where gas is transferred for use. Fencing, signage, illumination and fire protection shall be in accordance with applicable Standards. The parking bay shall have a firm, compacted, well-drained foundation.
NOTE: A typical arrangement of a parking bay for mobile storage is shown in Appendix B.

3.2.4 Roofing Where equipment is protected by a roof or canopy, such a roof shall be designed to facilitate the dispersal of gas. 3.2.5 Fire protection There shall be at least one fire extinguisher of dry powder type having a rating of 6A:80B:E in accordance with AS/NZS 1850, and an available capacity of at least 9 kg. An extinguisher shall be available within 4 m of the gas compression equipment and gas storage and dispenser/fill post.

www.standards.org.au

Standards Australia

AS 50922009

18

NOTES: 1 2 Attention is drawn to dangerous goods and OHS regulations relating to the requirements for fire protection for gas storages. AS 2441 relates to the installation of fire hose reels and AS 2444 to fire extinguisher selection and location.

3.2.6 Illumination Stations at which refuelling will occur at night shall be equipped with fixed lighting capable of providing illumination at a level of not less than 50 lux within the dispensing area. 3.2.7 Signs and notices The following signs and notices shall be installed at CNG refuelling stations as a minimum: (a) (b) (c) (d) (e) (f) (g) No smoking: This sign may be accompanied by permanent floor marking delineating the no smoking area. This machine may start automatically at any time: Where compressors or other equipment are subject to automatic starting. Stop engine no smoking: Adjacent to areas where fuel transfer or dispensing takes place. Hazchem: Signs for compressed natural gas storage systems (referred to as Emergency Information Panel in the Australian Dangerous Goods Code). Refuelling instructions in accordance with Appendix C. Personal protective equipment requirements. Emergency instructions to be followed in case of a major gas leak or fire, including site evacuation plans and contact details for equipment isolation and repair. Emergency stop switches and isolation valves shall be clearly identified with signage.

3.3 REFUELLING STATION ELEMENTS


Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

All components used in the construction of a refuelling station shall meet the requirements of Section 2 of this Standard. For the purposes of this Standard, the equipment comprising CNG refuelling stations consists of the following elements: (a) (b) (c) (d) (e) The inlet gas train connecting from the gas supply to the compression equipment in accordance with Clause 3.4. The gas compression equipment in accordance with Clause 3.5. A compressed gas storage system in accordance with Clause 3.6, usually for fast filling stations. Dispensers/fill posts for fast or time fill in accordance with Clause 3.7. A high pressure discharge system comprising the interconnecting piping/tubing, valves and related components between the compressors, storage and dispensers in accordance with Clause 3.8. Safety and control systems. The electrical system. Other equipment such as fencing, equipment protection against damage from vehicle collisions, fire protection, signs and notices, and lighting, in accordance with Clause 3.2.

(f) (g) (h)

Standards Australia

www.standards.org.au

19

AS 50922009

3.4 INLET GAS SUPPLY EQUIPMENT The inlet gas supply equipment shall meet the requirements of AS 5601 and any additional requirements of the Technical Regulators. The inlet gas supply equipment shall have rated pressures in excess of the inlet gas equipment pressure relief valve setting. The inlet gas supply equipment shall include the following: (a) (b) (c) (d) (e) An isolating valve as specified in AS 5601. A non-return valve as specified in AS 5601. A pressure relief valve fitted downstream of the non-return valve sized in accordance with Clause 3.9.1. A flexible connection between the inlet and the compressor piping in accordance with Clause 3.5. A pulsation damper to moderate compressor induced gas pulsations in accordance with the requirements of the gas supplier. The combined volume of the inlet piping, inlet damper vessel and any ancillary vessels shall be such as to limit the pressure rise to less than the set pressure of the inlet gas equipment pressure relief valve, when the compressor stops. A filter, as specified by the compressor manufacturer, with test connections for pressure drop measurements. Additional isolating valves at each compressor where more than one compressor is installed.

(f) (g)

3.5 GAS COMPRESSION EQUIPMENT Gas pressure equipment shall incorporate the following: (a)
Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

The compressor(s) with interconnecting piping/hoses and associated fittings, gas coolers, separators, separator drainage and blow down equipment, stage relief valves and interconnecting pipework and valves in accordance with Clauses 2.3, 2.4, 2.5 and 2.6. The drive motor or engine. Instrumentation and control/protection devices in accordance with Clauses 2.3, 2.8 and 3.9.

(b) (c)

Gas compression equipment may be located in sound attenuating and/or weather protecting enclosures or on open skids. The enclosures or skids may be mounted on anti-vibration mounts or bolted directly to concrete foundations. Access doors and panels should be lockable if not located within a locked enclosure in accordance with Clause 3.2.1. Foundation design shall take into account both static and dynamic loads, compressor and driver vibrations, and all relevant working and soil conditions. The discharge from relief valves shall be piped to a vent stack in accordance with Clause 3.8.2 either directly or indirectly via a connection to the inlet gas supply equipment. Flexible connections shall be provided at the inlet in accordance with Clause 3.4 and at the outlet from the compression equipment to limit the transmission of vibrations from the compression equipment to the fixed gas piping/tubing. A non-return and isolating valve shall be fitted immediately downstream of the compressor outlet flexible connection.
www.standards.org.au Standards Australia

AS 50922009

20

3.6 COMPRESSED GAS STORAGE SYSTEMS 3.6.1 Static storage systems Static compressed gas storage systems shall consist of the following: (a) (b) (c) (d) (e) One or more banks of compressed gas in gas containers either as a single unit or as multiple units manifolded together with safety devices in accordance with Clause 2.6. Interconnecting pipework and valves in accordance with Clauses 2.4 and 2.5. A pressure gauge for each bank in accordance with Clause 2.7. A master shut off valve for each bank in accordance with Clause 3.8.3. Vent piping from safety devices where required by other Standards.

Cylinder storage units that have cylinders stored in a vertical position shall be limited to a width of 1.1 m and a height of 1.6 m above floor level unless adequate access arrangements are provided not more than 1.6 m below the valves. Cylinder storage units that have cylinders stored in a horizontal position shall be limited to a height of 2 m. To ensure ready access, all cylinder fittings shall be arranged on one end of each unit. Storage systems comprising horizontally disposed gas containers exposed to direct sunlight shall be protected by a roof or canopy in accordance with Clause 3.2.4. 3.6.2 Mobile storage systems Provisions shall be made for the reception and protection of mobile storage systems, in accordance with Clause 3.2.3, where they are used to transfer gas to a refuelling station. 3.7 DISPENSERS/FILL POSTS 3.7.1 Minimum requirements
Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

As a minimum, dispensers/fill posts shall include an assembly of the following components in an enclosure or on open frame(s) or post(s) depending on location and purchaser requirements: (a) Refuelling hose assembly in accordance with Clause 2.9 fitted with a refuelling nozzle in accordance with 2.11 and breakaway coupling in accordance with Clause 2.12. A hose isolating valve, which shall be positioned to be readily accessible to the person refuelling the vehicle. A fill pressure gauge. A pressure control device meeting the requirements of Clause 3.9.3 to be provided to ensure that the vehicle gas containers are not filled to pressures above those for which they are rated. A safety relief valve downstream of the hose isolating valve set to limit the pressure in the fill hose from exceeding 110% of the maximum vehicle cylinder fill pressure. A hose assembly refuelling connector rest position and means of hose assembly support designed to facilitate ease of use, avoid hose kinking and ensure that the hose assembly is not in contact with the ground when at rest and in normal use.

(b) (c) (d)

(e) (f)

Interconnecting pipework and fittings including vent piping for safe disposal of vent gas from the safety relief valves and vent hoses where the latter are incorporated in the refuelling hose assembly, shall be in accordance with Section 2.

Standards Australia

www.standards.org.au

21

AS 50922009

Where the vent hose is connected back to the inlet of the compression equipment, it shall be fitted with a non-return valve to prevent flow towards the refuelling connector. A means shall be provided for locking the refuelling hose assembly in its rest position or otherwise inhibiting unauthorized dispenser operation when the installation site is not attended.
NOTE: Additional requirements for public refuelling stations may be determined according to the Technical Regulators and the site owner and/or operator.

3.7.2 Additional components The following additional components may be incorporated as required by the purchaser: (a) (b) (c) (d) A means of measuring and indicating the amounts of gas dispensed locally and/or remotely. A hose vent valve for connection to a vent gas recovery system where the refuelling hose assembly is not fitted with a vent hose and is to be handled depressurized. A particle filter fitted as close as possible to the vehicle refuelling connector. Sequencing valves for optimizing gas storage utilization and vehicle filling in accordance with Clause 3.9.4.

3.7.3 Slow fill stations Any slow fill stations shall comprise at least the minimum components listed in Clause 3.7.1. Slow fill stations may be presented on a post or contained in a pit with an access lid to connect the fill hose to the vehicle to be filled. 3.8 HIGH PRESSURE DISCHARGE SYSTEM 3.8.1 General The high pressure discharge system comprises piping/tubing, valves and fittings between the compressor outlet(s), the gas storage system and the dispensers/fill posts.
Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

The system rated pressure shall take into account the compressor maximum discharge pressure (see Clause 2.3.5). All components of the high pressure discharge system shall be rated for this pressure. 3.8.2 High pressure piping/tubing 3.8.2.1 Design and layout All piping/tubing shall be run as directly as practicable with adequate provision for expansion, contraction, jarring, vibration and settling. The number of joints shall be kept to a minimum. Where overhead piping crosses the vehicle access way it shall be at least 4.6 m above ground or as determined by the Technical Regulators. All piping/tubing shall be adequately supported at intervals no less than required by AS 4041 and protected against mechanical and corrosive damage. Piping buried underground shall be coated and cathodically protected to AS 2832.1. The minimum depth for buried piping shall be 750 mm subject to increased depth dependent on any specific local soil conditions, vehicle weight and movements. Care must be taken to select back fill materials that will not damage the pipe coating. The as installed location of all buried underground pipeline shall be accurately recorded. Test connections shall be provided where pressure readings are desired for diagnostic purposes.

www.standards.org.au

Standards Australia

AS 50922009

22

Pressure relief discharge piping shall comply with the following requirements when installed: (a) (b) (c) (d) (e) (f) (g) The rated pressure for discharge piping shall be in accordance with AS 4041. The discharge piping size shall be sufficient to ensure the required relief flow rate is achieved. The direction of discharge shall not permit escaping gas to impinge on any piping or structure. Except for measures necessary to prevent ingress of rainwater or blockage into the relief device, venting shall be direct to atmosphere. The discharge terminal shall be in accordance with the requirements for vent terminals outlined in AS 5601. When designing the discharge piping, due consideration shall be given to the forces generated by the discharging gas. The outlet shall not be vulnerable to physical damage and shall be fitted with suitable covers to prevent the ingress of water and dirt.

3.8.2.2 Fabrication Discharge piping and tubing shall be fabricated to comply with the requirements of AS 4041 (see Clause 2.4.3). 3.8.3 High pressure valves, fittings and safety devices 3.8.3.1 Isolating valves As a minimum, isolating valves shall be provided as follows: (a) (b) (c)
Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

At the outlet of each compressor in accordance with Clause 3.5. At the outlet of each storage bank in accordance with Clause 3.6. Master shut off valve(s) for each storage bank located immediately outside the storage enclosure. In the case of multiple valves these shall be located adjacent to each other. At the dispenser/fill post piping immediately before the fill hose, in accordance with Clause 3.7, in a position readily accessible to the person refuelling the vehicle. At the end of the refuelling hose assembly in accordance with Clause 2.9.

(d) (e)

Additional isolating valves shall be provided as required to facilitate access to equipment for maintenance and repair with bleed connections between isolating valves to depressurize before access to components. Under no circumstance shall the highly dangerous practice of undoing screwed or compression fittings be employed for this purpose. 3.8.3.2 Non-return valves As a minimum, non-return valves shall be provided as follows: (a) (b) At the outlet of each compressor in accordance with Clause 3.5. In the vent line where the refuelling hose vent is connected to the compressor suction side in accordance with Clause 3.9.1.

3.8.3.3 Components Fittings for the high pressure discharge system shall comply with Section 2 and may be used as required for the following applications: (a) Filtration of the gas stream to the extent required by the end user.

Standards Australia

www.standards.org.au

23

AS 50922009

(b) (c) (d)

Damping pressure pulsations. Joining piping and tubing i.e. compression and face seal type joints. Connection blocks to facilitate multiple piping/tubing connections.

3.9 SAFETY AND CONTROL SYSTEMS 3.9.1 Safety devices for over pressure protection Safety devices shall be provided for compressors in accordance with Clause 2.3.5. They shall be provided for pressure vessels and gas containers in accordance with Clause 2.6 and for the refuelling hose(s) in accordance with Clause 3.7.1. Vent piping, where appropriate, shall be in accordance with Clause 3.8.2. Where there is a refuelling hose assembly vent line connected back to the inlet gas supply, the inlet system relief valve shall be sized to accommodate a vehicle refuelling connector malfunction (i.e. failure to close on venting) to limit the pressure rise in the inlet gas supply equipment to not more than 110% of its design maximum working pressure when its source pressure is the maximum vehicle refuelling pressure. 3.9.2 Compressor protection switches/devices As a minimum, each compressor shall be fitted with the following switches/devices integrated into the control system in accordance with Clause 3.10.2: (a) (b) A pressure switch for low inlet pressure set as specified in AS 5601. A pressure switch for high outlet pressure set above the normal control system storage full compressor stop pressure and below the compressor discharge relief valve setting. A pressure switch for low oil pressure and/or level set to the manufacturers specifications. An emergency stop switch that, depending on location, may serve more than one compressor. A pressure switch for high inlet pressure where the gas supply pressure can exceed the compressor maximum inlet pressure. A temperature switch for high gas outlet temperature set to the manufacturers specifications.

(c) (d)
Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

(e) (f)

Each compressor with hydraulically operated pistons shall be fitted with the following protection switches/devices integrated into the control system in accordance with Clause 3.10.2: (i) (ii) A temperature switch for high hydraulic oil temperature. A level switch for low hydraulic oil level.

3.9.3 Refuelling pressure control Dispensers and/or fill posts for both public and non-public access stations shall incorporate pressure controls to ensure that the maximum refuelling pressures shall not exceed the limits specified by the CNG fuel cylinder standard of the cylinders fitted to the vehicles to be refuelled. For fast fill systems without a temperature compensated pressure control system, the maximum fill pressure shall be 20 MPa.

www.standards.org.au

Standards Australia

AS 50922009

24

For fast fill systems with a temperature compensated pressure control system the refuelling control system shall limit the vehicle refuelling pressure to that specified by ISO 11439, CSA B51 Part 2 or ANSI/IAS NGV 2, i.e. 20 MPa at 15C, but in no case shall the fill pressure exceed 26 MPa. For non-public and special purpose refuelling stations that service vehicles with CNG fuel cylinders to standards other than ISO 11439, CSA B51 Part 2 or ANSI/IAS NGV 2 where the rated fill pressure for these vehicle fuel cylinders is below that specified by these Standards, the vehicle refuelling receptacles shall be of an approved type that does not allow connection to ISO 14469 refuelling nozzles. This will avoid the possibility of exceeding the maximum fill pressure for these cylinders. 3.9.4 Controls for gas storage and vehicle filling Controls for the optimizing of storage utilization and vehicle filling are not mandatory but may be included as agreed between the owner and station constructor and may be all mechanical or a combination of valves and control devices. The location of such controls may be at the storage and/or the dispenser locations or as decided by the station constructor. 3.10 POWER AND CONTROL ELECTRICAL SYSTEMS 3.10.1 Power electrics Electric motors, starters and distribution boards together with associated cabling shall comply with AS/NZS 3000. They shall also comply with the requirements of the gas supplier, local electrical supplier and Technical Regulator(s). 3.10.2 Control systems Control systems devices shall comply with Standards for the protection of electrical equipment, AS/NZS 3000 and related Australian Standards for equipment located in hazardous areas.
Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

Control systems shall be designed to meet the refuelling station requirements as agreed with the purchaser and operator. They should provide protection to all electrical equipment with the incorporation of protection switches in accordance with Clause 3.9. Control systems may use hard wired relays and/or programmable logic controllers (PLCs) and shall meet the following minimum requirements: (a) (b) The operation of the protection switches (see Clause 3.9.2) shall stop and lock out the affected compressor. The inclusion of an indicator shall show when a shutdown is due to a fault and additional indicators shall show which fault has initiated the shutdown.

Emergency stop switch(es) shall be provided at the dispenser(s) location(s) to work in series with the compressor emergency stop(s).
NOTE: Emergency stop switch(es) may be required by the purchaser at other locations.

Standards Australia

www.standards.org.au

25

AS 50922009

SECT ION
4.1 GENERAL

TEST IN G

AND

COMM I SS ION I N G

Attention is drawn to the testing and commissioning required by relevant Authorities and particularly those of the involved Technical Regulators for the gas and electricity installations.
NOTE: Appendix D contains a checklist that provides guidance on the aspects of the CNG refuelling station that should be checked prior to putting the station into service and during annual safety inspections.

4.2 STATION COMPLIANCE DOCUMENTATION The station contractor shall submit documentation to the extent and in the format required to enable Technical Regulators to assess the compliance of the station with the appropriate acts, regulations and Standards and shall obtain from these Technical Regulators any licences and/or permissions required before testing and commissioning can commence. Copies of compliance documentation shall be kept on site during testing, commissioning and operation. 4.3 WORKS TEST RESULTS Copies of works test and certificates shall be kept on site during testing and commissioning and operation. These shall include (a) (b) (c) (d)
Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

pressure vessel certificates; cylinder production test certificates; dispensing hose test certificates; and safety relief valve certificates and other equipment test results relevant to commissioning.

4.4 COMMISIONING DOCUMENTATION AND RECORDS The station contractor shall prepare and document the testing and commissioning procedures to be used and agree to the program for inspections and/or approvals with the Technical Regulators. The testing and commissioning procedures shall comply with the requirements of the equipment manufacturers. Records of tests and commissioning shall be kept.

www.standards.org.au

Standards Australia

AS 50922009

26

SECT ION 5 OPERAT I O N MA I NT E N A N CE


5.1 GENERAL Refuelling stations shall be operated and maintained (a) (b) (c)

AND

when all necessary inspections, licences and certification are current; within the design parameters established for construction; and when all fitted control and safety devices are functioning correctly.

Attention is drawn to the need to comply with OHS requirements. Gas shall not be vented from the refuelling station to the atmosphere during normal operation. However, this shall not preclude the venting of gas for disconnecting the refuelling connector and any gas so released shall be led to a safe point of discharge.
NOTE: Appendix D contains a checklist that provides guidance on the aspects of the CNG refuelling station that should be checked prior to putting the station into service and during annual safety inspections.

5.2 ESTABLISHMENT OF PROCEDURES 5.2.1 Procedures required Procedures shall be appropriate to the station as follows: (a) (b) (c)
Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

Operating procedures shall cover all aspects of the facility. Maintenance procedures shall cover regular testing, inspection, and monitoring of the equipment. Emergency procedures shall cover any action to be taken in the event of fire, leakage, accident, equipment failure or other abnormalities or emergencies. Training procedures shall cover all aspects of operating, maintenance, and emergency functions.

(d)

5.2.2 Promulgation of procedures The procedures shall be documented in notices, manuals, or other recorded instructions as appropriate to the particular station. They shall be on view or readily available on site. 5.2.3 Review and upkeep of procedures The procedures shall be modified to reflect equipment or organizational changes. 5.2.4 Operating procedures The operating procedures shall take into account the following, as appropriate to the particular station: (a) (b) (c) (d) (e) (f) Normal handling procedures, with refuelling procedures in accordance with Appendix C. The monitoring of essential functions and components. Recognition of fault conditions. Housekeeping and site upkeep. Treatment of leakage. For equipment, any manufacturers operating instructions.
www.standards.org.au

Standards Australia

27

AS 50922009

(g) (h) (i) (j) (k) (l)

The maintenance of clear spaces for access. Personnel safety. Personal protective equipment. Control of ignition sources. Control of access and security. Vehicle movement.

5.2.5 Maintenance procedures Maintenance procedures shall take into account the following, as appropriate to the particular station: (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m)
Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

Regular testing of protective devices, alarms and emergency stop systems. Establishment of safe areas. Gas purging. Isolation and tagging. Control of contractors. Work authorization. Firefighting equipment. Pipelines. Gas containers (pressure vessels). Draining and separators. Electric equipment. Ventilation systems. Fences and security measures, signs, and notices. Illumination. The needs of any other individual items or plant components, taking into account any manufacturers maintenance instructions.

(n) (o)

5.2.6 Emergency procedures Emergency procedures based on emergency planning, such as those detailed in AS 4332, shall take into account the following, as appropriate to the particular station: (a) (b) (c) (d) (e) (f) (g) (h) List of contacts, emergency services and phone numbers. Chain of command. Duty list. Co-operation with relevant authorities. Fire teams (initial response). Debriefing and reporting. Contractors. Site plan.

www.standards.org.au

Standards Australia

AS 50922009

28

5.2.7 Training of personnel 5.2.7.1 Operational staff Operational staff shall be trained in the following, as appropriate to the site: (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) The properties, characteristics and hazards of any materials kept or handled. The correct use of any necessary personal protective equipment provided. Hazards likely to be encountered. The procedures to be followed in the event of an incident (leakage, accident or fire). The layout of the station. The location of firefighting equipment. The basic principles of firefighting, and the use of fire extinguishers. Any regulations relevant to their tasks. Area housekeeping. The safety rules of the station. The conditions and obligations associated with work permits, confined-space entry permits.

NOTE: Particular care should be taken to ensure personnel for whom English is a second language comprehend the training.

5.2.7.2 Visitors Visitors to any refuelling station shall (a) (b)


Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

have their details recorded together with their entry and exit times; wear a visitor badge and all personal protection equipment designated for the areas they are visiting; be instructed in the evacuation procedures that apply in the event of a fire or other incident; and be accompanied at all times to ensure compliance with all safety instructions and notices.

(c) (d)

5.2.7.3 Refresher training Training procedures shall be repeated at sufficient intervals to ensure that capability is maintained. 5.3 SUPERVISION All operational and maintenance work shall be planned and supervised by responsible staff who shall ensure that all necessary precautions are observed. 5.4 RECORDS Records shall be kept of (a) (b) (c) training and retraining; routine inspection and testing of equipment in accordance with Clause 5.6; and abnormal incidents, including near-miss occurrences.

Standards Australia

www.standards.org.au

29

AS 50922009

5.5 SPECIFIC OPERATING PROCEDURES 5.5.1 Commissioning new or modified equipment No station or part thereof shall be put into service until operating and emergency procedures and associated equipment are available, appropriate to the area being put into service, and adequate personnel are available to cope with any possible fault condition. 5.5.2 Outlets not in use Any outlet that is not in use shall be capped or otherwise blanked off to prevent inadvertent release of gas, irrespective of whether a valve is fitted. 5.5.3 Ignition sources No ignition source shall be introduced into a hazardous area except for welding, cutting and similar operations, which shall be conducted only at specifically authorized times and places, in accordance with the provisions of AS 1674.1. 5.5.4 Illumination No work shall be carried out without adequate illumination. Electrical hand lamps shall not be taken into a hazardous area unless approved for the purpose. 5.6 SPECIFIC MAINTENANCE, INSPECTION AND TESTING 5.6.1 General Inspection and safety checks of the station shall be carried out to keep the whole station in safe operating condition at all times. 5.6.2 Scheduled inspections and tests 5.6.2.1 Inspections based on usage Safety inspections shall be conducted at monthly or longer intervals depending on the extent of use as indicated by compressor hours run.
Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

Attention is drawn to the need to comply with regulations should these specify inspections at shorter intervals than indicated above. 5.6.2.2 Fixed time interval inspections In addition to routine inspections as required by Clause 5.6.2.1, annual inspections shall be conducted by a suitably qualified person(s) in relations to the following: (a) (b) A leakage test of pipe work and joints shall be carried out and all leaks rectified. All components shall be visually inspected and any that are substandard shall be replaced. Particular attention shall be given to pressure regulators, safety devices and flexible piping. Refuelling hoses shall be tested annually using the procedure in Clause 2.9, Item (a). The breakaway coupling shall be tested annually by applying an axial force to ensure the coupling safely operates in accordance with the requirements of Clause 2.11.1.

(c) (d)

In addition, inspections shall be conducted by a suitably qualified person(s) in relation to the following: (i) (ii) Emergency stop systems shall be tested at frequencies as established in accordance with Clause 5.2.5(a) but in any event not less than annually. Electrical equipment shall be inspected in accordance with the relevant Australian Standards.

NOTE: Refer to AS/NZS 60079.17 for inspection of electrical equipment in hazardous areas, and AS/NZS 3000 for inspection of electrical equipment in non-hazardous areas.
www.standards.org.au Standards Australia

AS 50922009

30

5.6.2.3 Gas containers Periodic inspection and testing shall be completed as specified in (a) (b) AS 2030.1 for cylinders; or AS/NZS 3788 for pressure vessels.

5.6.2.4 Safety relief devices Safety relief devices other than burst discs shall be inspected and tested at intervals not exceeding five years, as specified by the Technical Regulators. Safety relief devices in service shall be maintained in reliable operating condition by observing the following procedures: (a) (b) (c) Exercising care in handling and storage to avoid damage to a cylinder and connected components. Exercising care in handling and storage to prevent plugging of openings by the accumulation of extraneous matter such as paint and dirt. Replacing damaged or malfunctioning assemblies with serviceable safety relief devices.

Fusible plugs shall be externally examined for evidence of extrusion during scheduled inspections in accordance with Clauses 5.6.2.1 and 5.6.2.2. Action shall be taken to replace fusible plugs found with evidence of extrusion. All replacements of safety relief devices or parts thereof shall be executed by suitably qualified personnel using parts or assemblies that meet the requirements of this Standard. If at any time it is necessary to break a seal on a safety relief device, the device shall be removed from service, reset and sealed to the satisfaction of the Technical Regulators. 5.6.2.5 Fire protection equipment
Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

Fire protection equipment shall be inspected and maintained at intervals as required by AS 1851. 5.6.2.6 Records A record of the inspection shall be maintained. 5.6.3 Authorization of work No work shall be carried out within any hazardous area without authorization by a person designated by the owner/operator of the station via one of the following: (a) (b) (c) A verbal instruction, which shall be limited to authorization of non-hazardous actions. A written procedure, to deal with a standardized and repetitive normal activity. A work permit, to deal with potentially hazardous activities requiring close attention.

5.6.4 Work permit A work permit shall be issued only by a person designated by the owner/operator of the station. The permit shall include statements of the following: (a) (b) (c) (d) (e) The period for which it is valid. The nature and extent of the work. Any conditions and precautions to be observed. Any protective equipment or clothing to be used. Any preparatory work necessary to ensure that it is safe to start work.
www.standards.org.au

Standards Australia

31

AS 50922009

(f) (g) (h)

Any regular checking necessary to ensure that the safety requirements and conditions remain in force. Any procedures and precautions necessary to return the plant to normal service. Any firefighting equipment required.

NOTE: A sample work permit is illustrated in Appendix E.

5.6.5 Safe procedures Work on or near any gas-containing components shall be undertaken only after all necessary steps have been taken to ensure safety. Particular attention shall be paid to the following: (a) (b) (c) (d) Any written safety procedures shall be followed. Protective devices shall not be removed unless substitute protection has been provided. Inadvertent operation during maintenance shall be prevented. Contamination of equipment by water, dirt, foreign matter, or other materials shall be prevented.

5.6.6 Preparation of work site Any person who issues a work permit shall be responsible for ensuring that the site area and plant are properly prepared to prevent the danger of fire or explosion, subject to the work permit. Precautionary measures shall include the following, as appropriate: (a) (b) (c) (d)
Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

Identification of both the equipment to be worked on and all other equipment affected, including underground piping or equipment. Depressurization and disconnection. Isolation from other equipment. Blanking or capping opened connections. Removal of combustible materials. Provision of additional protection, fire guards and firefighting equipment. Testing for flammable gas and oxygen levels.

(e) (f) (g)

5.6.7 Completion of work When work covered by a work permit has been completed, the person who issued the work permit shall, before allowing the plant to be returned to service, ensure that (a) (b) (c) (d) the work has been completed; any temporary arrangements have been discontinued, e.g. bypass lines or blank flanges have been removed, fuses replaced; all personnel and equipment are accounted for; and the work permit is cancelled.

5.6.8 Hot work Any work within a hazardous area involving cutting or welding by gas or electric arc or any non-welding work of equivalent risk, e.g. grinding, drilling or the use of percussion tools, shall not be undertaken unless a work permit has first been obtained.
NOTE: For an example, see Appendix E.

www.standards.org.au

Standards Australia

AS 50922009

32

5.6.9 Routine work Any work for which a work permit is not required shall be sufficiently supervised by a competent person(s) to ensure the safe conduct of the work. 5.6.10 Equipment alterations Any gas-containing equipment having approval as a pressure component shall not be modified until approval for the modification has been obtained from the Technical Regulators. 5.6.11 Work within hazardous areas Any work that is likely to create an ignition source within a hazardous area shall be undertaken in accordance with AS 1674.1 and the area shall be monitored to ensure that it remains gas-free. 5.6.12 Site upkeep The area around any storage and compressor station shall be maintained in a safe condition. In particular (a) (b) (c) (d) (e) (f) the area shall be kept clear of all extraneous material; specified clearance distances shall be maintained; vegetation that might become a fire hazard shall be kept clear; the surface coating of tanks shall be maintained in good condition; signs and notices shall be kept in a legible condition; and lighting shall be kept operational and effective.

Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

Standards Australia

www.standards.org.au

33

AS 50922009

APPENDIX A

REGULATORY AGENCY INFORMATION


(Informative) The following information is for guidance only and may be subject to change:
Federal, State or Territory Federal Function Authority Contact Address Phone Fax

Dispenser meter approval

National Measurement Institute ACT WorkCover

Bradfield Road Lindfield NSW 2070

(02) 8467 3600

(02) 8467 3610

Australian Capital Territory

Dangerous goods transport and storage, CNG storage cylinders Gas technical regulation

Chief Inspector of Dangerous (02) 6207 6355 Goods PO Box 224 Civic Square ACT 2608 PO Box 1908 Canberra ACT 2601 (02) 6207 1923 (callers outside ACT/NSW) or 13 22 81 (calls within ACT/NSW) (02) 6207 0400

(02) 6207 7249

ACT Planning and Land Authority

CNG dispenser metering

Trade Measurement 255 Canberra Avenue Unit, ACT Office of Fyshwick ACT 2609 Fair Trading WorkCover NSW Dangerous Goods Inspector (Professional) PO Box 1476 Parramatta NSW 2124

New South Dangerous goods Wales storage


Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

(02) 9841 8449 Gosford general enquiries: (02) 4321 5000 (02) 9995 5555 or 131 555 Environment Line (within NSW) (02) 8281 7777

(02) 9687 6712

Dangerous goods transport and all other matters

NSW Department of Manager Environment and Dangerous Goods Conservation PO Box A290 Sydney South NSW 1232

(02) 9995 5918

Gas technical regulation CNG dispenser metering Northern Territory Dangerous goods transport, storage and gas technical regulator CNG dispenser metering

Department of Water and Energy Office of Fair Trading Office of Work Health and Electrical Safety Trade Measurement, Department of Justice

GPO Box 3889 Sydney NSW 2001 1 Fitzwilliam St Parramatta NSW 2150 Chief Dangerous Goods Inspector GPO Box 4821 Darwin NT 0801

(02) 8281 7799

13 32 20

(08) 8999 5140

(08) 8999 5141

(08) 8922 0866

www.standards.org.au

Standards Australia

AS 50922009

34

Federal, State or Territory

Function

Authority

Contact Address

Phone

Fax

Queensland Dangerous goods transport

Queensland Transport

Principal Engineer (Dangerous Goods) PO Box 673 Fortitude Valley QLD 4006 PO BOX 69 Brisbane QLD 4001

(07) 3253 4606

(07) 3253 4453

Dangerous goods storage

Workplace Health and Safety Queensland Department of Industrial Relations

(07) 3225 2000

(07)3225 1540

Gas technical regulation

Department of Natural Resources, Mines and Energy Trades and Measurements Section - Office of Fair Trading, Department of Tourism and Fair Trading

Petroleum and Gas Operations Branch GPO Box 2454 Brisbane QLD 4000

(07) 3237 1415

(07) 3235 4395

CNG dispenser metering

(07) 3115 1770

South Australia

Dangerous goods transport and storage Gas technical regulation

Safework SA Manager Department of the Dangerous Substances Premier and Cabinet GPO Box 465 Adelaide SA 5001 The Office of the Technical Regulator Department of Transport , Energy and Infrastructure Trade Measurements Branch, Office of Consumer and Business Affairs Principal Gas Advisor/Engineer Level 8 ANZ Building (City Central Tower 1) 11 Waymouth Street Adelaide SA 5001

(08) 8303 0400

(08) 8226 4999

(08) 8226 5500

(08) 8226 5866

Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

CNG dispenser metering

(08) 8234 2036

Tasmania

Dangerous goods Workplace General Manager transport , storage Standards Tasmania PO Box 56 and gas technical Rosny Park TAS 7018 regulator Dangerous goods transport and storage Gas technical regulation Victorian Workcover Authority Manager Dangerous Goods GPO Box 4306 Melbourne VIC 3001

(03) 6233 8366

(03) 6233 8338

Victoria

(03) 9641 1551

(03) 9641 1552

Energy Safe Victoria PO Box 262 Collins St West VIC 8007

(03) 9203 9700

(03) 9686 2197

CNG dispenser metering

Trade Measurement, Office of Fair Trading

(03) 8684 6280

Standards Australia

www.standards.org.au

35

AS 50922009

Federal, State or Territory Western Australia

Function

Authority

Contact Address

Phone

Fax

Dangerous goods transport and storage

Resources Safety Division Department of Mines and Petroleum

Director Resources Safety Division 303 Sevenoaks Street Cannington WA 6107 or Locked Bag 14 Cloisters Square WA 6850 Chief Gas Inspector Energy Safety Division 303 Sevenoaks Street Cannington WA 6107 or PO Box 135 Cannington WA 6987

(08) 9358 8002

(08) 9358 8188

Gas technical regulator

Energy Safety Division Department of Commerce

(08) 9422 5200

(08) 9422 5244

CNG dispenser metering

Trade Standards Manager Branch, Department Trading Standards Branch of Commerce 321 Selby Street Osborne Park WA 6017 or Locked Bag 14 Cloisters Square WA 6850

(08) 9282 4300

(08) 9282 4301

Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

www.standards.org.au

Standards Australia

AS 50922009

36

APPENDIX B

TYPICAL LAYOUT OF MOBILE STORAGE UNITS


(Informative)

Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

Standards Australia

www.standards.org.au

37

AS 50922009

APPENDIX C

REFUELLING INSTRUCTIONS AND PROCEDURES


(Normative) C1 BEFORE REFUELLING It is the responsibility of the refueller to ensure the following: (a) (b) (c) (d) (e) The CNG vehicle identification labels are approved and on the vehicle registration plates. There is no smoking of cigarettes or any naked flame within 3 m of the vehicle. The vehicle handbrake is firmly applied and the vehicle parked in gear or P (with automatic transmission). The engine is switched off. The vehicle gas cylinder(s) is/are not overdue for periodic re-certification.
NOTE: This is to be done by checking that the retest date displayed on the refuelling information plate has not passed, either manually or automatically via a tag reader, the latter interlocked to prevent refuelling if the cylinder certification is not current.

(f)

There are no leaks.

C2 REFUELLING PROCEDURE The refuelling procedure shall be as follows: (a) (b) (c)
Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

Remove dust cap from refuelling receptacle. Ensure that the refuelling receptacle is in good condition. Remove the refuelling hose from its rest position and connect the refuelling nozzle to the vehicle refuelling receptacle. Initiate the filling process according to the site specific instructions displayed and ensure that refuelling connector is not leaking.

(d)

NOTE: Once the refuelling flow has commenced, the person refuelling the vehicle should keep a distance from the refuelling connector and refuelling hose at least equal to the length of the refuelling hose.

On completion of refuelling, whether occurring automatically or manually (i) (ii) follow the site specific instructions displayed, remove refuelling nozzle from the vehicle refuelling receptacle and return the refuelling hose to its rest position; check that there are no leaks; and

(iii) replace dust cap on the vehicle refuelling receptacle.

www.standards.org.au

Standards Australia

AS 50922009

38

APPENDIX D

CHECKLIST FOR PUTTING THE STATION INTO SERVICE AND ANNUAL SAFETY INSPECTIONS OF REFUELLING STATIONS
(Informative) D1 GENERAL It is recommended that the owner/operator obtain from the station contractor a statement of compliance with this Standard. The following list provides guidance on the aspects that should be checked prior to putting equipment into service and during annual safety inspections. The involvement of the Technical Regulators may vary from that assumed in this list depending on individual state and territory regulations and practices and the size and complexity of the station. D2 CHECKLIST FOR PUTTING STATION INTO SERVICE AND SAFETY INSPECTION FOR REFUELLING STATIONS
Item Approvals and compliance documentation Have all approvals been obtained? Has the station contractor provided a statement of compliance with this Standard and provided a list of minor deviations? Location, security and protection Have the hazardous areas created by the presence of the refuelling station been established?
Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

Tick

Clause reference/ details/comments

3.1 4.2

3.1 and 3.2 3.2 3.2

Are the separation distances observed as required by Standards? Is the site on which the refuelling facility is located fully fenced and secured? If not, is the equipment secured in enclosures or behind security fencing? Is the station adequately protected from damage by vehicle collisions? If refuelling is to take place after dark, is the dispenser area adequately illuminated? Is there provision to secure dispensers/fill posts from unauthorized use when the site is not manned? Are dispenser operation and filling instructions displayed? Is firefighting equipment to this Standard in place? Are required safety signs in place? Inlet Gas supply (see also Section 5) Has the Technical Regulator been made aware of the intended station of a gas pressure raising device? High pressure gas storage systems Is the certificate of all cylinders current and certificates provided? Have all pressure vessels been assessed for Hazard Level as specified in AS 4343 and certificates provided for those classified as D and above?

3.2 3.2.6 3.2 and 3.7.1 3.2.7 3.2.5 3.2.7

3.4 (see also AS 5601)

4.3 4.3

Standards Australia

www.standards.org.au

39

AS 50922009

Item Has the presence of all pressure vessels been registered? Has the maximum quantity of stored gas been established and a license obtained for the storage of dangerous goods if required according to state and territory regulations? Electrical supply Has the Technical Regulator been made aware of the station?

Tick 3.1 4.2

Clause reference/ details/comments

State and territory requirements regarding notification of Electrical work 5.6.2.2 (see also AS/NZS 2381.1) As required by state and territory authorities

Has a hazardous area dossier been provided establishing compliance with electrical standards for hazardous area service? Has the station been inspected and permission to energize given? Testing and commissioning Has the station been inspected and permission to commission given? Has the commissioning been witnessed and permission to operate given? Has commissioning been completed in accordance with this Standard and the test and commissioning records provided? Operation and maintenance Have procedures been established for operation, maintenance emergency responses, training, visitors, supervision, work permits and records? Has the operational staff been trained with arrangements for refresher training at intervals? Have the site emergency procedures been amended to reflect the presence of the refuelling station and the Fire Brigade informed?
Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

3.1, 4.4 3.1, 4.4 4.4

5.2

5.2.7 5.2.6 5.6

Have arrangements been made for periodic safety and annual inspections?

www.standards.org.au

Standards Australia

AS 50922009

40

APPENDIX E

HOT WORK PERMIT


(Informative)

Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

Standards Australia

www.standards.org.au

Standards Australia
Standards Australia develops Australian Standards and other documents of public benefit and national interest. These Standards are developed through an open process of consultation and consensus, in which all interested parties are invited to participate. Through a Memorandum of Understanding with the Commonwealth Government, Standards Australia is recognized as Australias peak non-government national standards body. Standards Australia also supports excellence in design and innovation through the Australian Design Awards. For further information visit www.standards.org.au

Australian Standards
Committees of experts from industry, governments, consumers and other relevant sectors prepare Australian Standards. The requirements or recommendations contained in published Standards are a consensus of the views of representative interests and also take account of comments received from other sources. They reflect the latest scientific and industry experience. Australian Standards are kept under continuous review after publication and are updated regularly to take account of changing technology.

International Involvement
Standards Australia is responsible for ensuring the Australian viewpoint is considered in the formulation of International Standards and that the latest international experience is incorporated in national Standards. This role is vital in assisting local industry to compete in international markets. Standards Australia represents Australia at both the International Organization for Standardization (ISO) and the International Electrotechnical Commission (IEC).
Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

Sales and Distribution


Australian Standards, Handbooks and other documents developed by Standards Australia are printed and distributed under license by SAI Global Limited.

Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

For information regarding the development of Standards contact: Standards Australia Limited GPO Box 476 Sydney NSW 2001 Phone: 02 9237 6000 Fax: 02 9237 6010 Email: mail@standards.org.au Internet: www.standards.org.au For information regarding the sale and distribution of Standards contact: SAI Global Limited Phone: 13 12 42 Fax: 1300 65 49 49 Email: sales@sai-global.com

ISBN 0 7337 9260 X

This document has expired. To access the current document, please go to your on-line service.Please note that material accessed via our on-line subscription services is not intended for off-line storage, and such storage is contrary to the licence under which the service is supplied.

This page has been left intentionally blank.

Accessed by APA GASNET AUSTRALIA (OPERATIONS) PTY LTD on 16 Feb 2010

Das könnte Ihnen auch gefallen