Sie sind auf Seite 1von 3

1. shutdown for normal standard turbine washing 2.

cooling down with manual opened IGV and opened air intake shut-off door for faster cooling down 3. opening of CC manholes after approx. 10 hours for docu of deposit behavior 4. Turbine washing on washing speed 5. picture docu of washing effect 6. closing of manholes, re-washing of turbine prior re-start 7. re-start to FSNL for spallation of deposits (max. 10min FSNL) 8. shutdown of GT, cooling down with manual opened IGV and opened air intake shut-off door for faster c 9. opening of CC manholes for docu of deposit behavior after standard washing, 10. take of deposit samples from remaining deposits

11. intensive turbine washing by high-pressure cleaner with 70C water (Krcher) after opening of CCs 12. start-up for drying of turbine Additional Inspection GT13 (after intensive turbine washing): 13. opening of CCs for additional inspection 14. visual inspection on pressure and suction side, picture docu 15. NDT in area of detected indications 16. docu of crack length on TLe1 17. boroscope inspection of some TLa1, TLe2 18. opening of manhole behind compressor for check of cooling air nozzles of TLe2 19. boroscope inspection of some TLe1 cooling air inserts 20. boroscope inspection of FO burner nozzles 21. docu of radial gaps on TLa1 and TLa4 Standard Washing GT14: 22. shutdown for normal standard turbine washing 23. cooling down with manual opened IGV and opened air intake shut-off door for faster cooling down 24. opening of CC manholes after approx. 10 hours for docu of deposit behavior 25. Turbine washing on washing speed 26. picture docu of washing effect 27. closing of manholes, re-washing of turbine prior re-start 28. re-start to FSNL for spallation of deposits (max. 10min FSNL)

1. shutdown for normal standard turbine washing 2. cooling down with manual opened IGV and opened air intake shut-off door for faster cooling down 3. opening of CC manholes after approx. 10 hours for docu of deposit behavior 4. Turbine washing on washing speed 5. picture docu of washing effect 6. closing of manholes, re-washing of turbine prior re-start 7. re-start to FSNL for spallation of deposits (max. 10min FSNL) 8. shutdown of GT, cooling down with manual opened IGV and opened air intake shut-off door for faster cooling down 9. opening of CC manholes for docu of deposit behavior after standard washing, 10. take of deposit samples from remaining deposits

11. intensive turbine washing by high-pressure cleaner with 70C water (Krcher) after opening of CCs 12. start-up for drying of turbine Additional Inspection GT13 (after intensive turbine washing): 13. opening of CCs for additional inspection 14. visual inspection on pressure and suction side, picture docu 15. NDT in area of detected indications 16. docu of crack length on TLe1 17. boroscope inspection of some TLa1, TLe2 18. opening of manhole behind compressor for check of cooling air nozzles of TLe2 19. boroscope inspection of some TLe1 cooling air inserts 20. boroscope inspection of FO burner nozzles 21. docu of radial gaps on TLa1 and TLa4 Standard Washing GT14: 22. shutdown for normal standard turbine washing 23. cooling down with manual opened IGV and opened air intake shut-off door for faster cooling down 24. opening of CC manholes after approx. 10 hours for docu of deposit behavior 25. Turbine washing on washing speed 26. picture docu of washing effect 27. closing of manholes, re-washing of turbine prior re-start 28. re-start to FSNL for spallation of deposits (max. 10min FSNL)

r faster cooling down