Sie sind auf Seite 1von 6

CIRCULAR FOOTING DESIGN

FORCES DETAILS :

Axial Load = P1 =

25 T

COLUMN DETAILS :

G.L 0.47 m

Diameter of column

FOOTING DETAILS :

Diameter of circular footing

2 m 2.0

Cover to Main R/f = Diameter of R/f in Footing =


SOIL DETAILS :

0.05 m 12 mm 0.0

Density of Soil = g = Depth of foundation below G.L = H =

3 1.7 T/m 2.0 m

2.00
X

MATERIAL CONSTANT :

Concrete Grade = R/f Grade = Load Factor = gf =


DESIGN FORCES :

M - 20 N/mm2 Fe - 415 N/mm2 1.5

0.00
Z Z

Axial load = P = Self Weight of Footing =

25.00 T 2.50 T

2.00

Total Vertical Load =

27.50 T

PRESSURE CALCULATION :

SBC =

20 T/m2

P=

P A

\ P=

8.76 +

T/m2

< S.B.C

UNSAFE

R/F CALCULATION FROM BENDING CONSIDERATION :

2000

0 470 765

0.0 T/M2

0.0 T/M2

MOMENT AT CRITICAL SECTION ALONG WIDTH :

M = Pmax x 0 x 0 / 2 M= 0.00 T-m Mu = 0.00 KN-m 2 Ast = 0.00 mm 2 Min Req = 0 mm #DIV/0!

( To be distributed in 2 m Length ) ( Ast = 0.12 x b x D )

PROVIDE 12 # @ 150 C/C ALONG WIDTH \ Ast = 753.98 mm2

MOMENT AT CRITICAL SECTION ALONG LENGTH :

M = Pmax x 0.765 x 0.765 / 2 M= 0.00 T-m Mu = 0.00 KN-m 2 Ast = 0.00 mm ( To be distributed in 0 m Length ) 2 Min Req = 0 mm ( Ast = 0.12 x b x D )

#DIV/0! \ Ast = #DIV/0! mm2

CHECK FOR ONE WAY SHEAR ALONG LENGTH : Critical Section is at diatance of ' d ' from face of column

0 0.00 0.765 0.815

2.00 \ Shear force at critical section = V = \ Actual Shear stress tv =

0.00 x 0.00 Vu bxd 1.5 x 1000 x 0.000 100 x 1000 x

0.815 T

= = Pt = 100 x As b x d 0.28 < =

0.00 -50 N / mm2 #DIV/0! -50

x 10000

#DIV/0!

Pt 0.15 0.2

tc 0.28 0.33

tc

N / mm2

tv
HENCE SAFE

CHECK FOR ONE WAY SHEAR ALONG WIDTH : Critical Section is at diatance of ' d ' from face of column

0 0.00 0.765

0.05 2.00 \ Shear force at critical section = V = \ Actual Shear stress tv = = = Pt = \ 100 x As b x d 0.28 < = N / mm2

0.00 x 0.00 Vu bxd 1.5 x 1000 x 0.000 100 x 1000 x

0.05 T

0.00 -50 N / mm2 753.98 -50

x 10000

-1.51

tc

tv
HENCE SAFE

CHECK FOR TWO WAY SHEAR : Critical Section is at distance of 'd/2' from face of column 2.00

0.42 0.00 -0.05 d/2 d/2

\ Shear force at Critical Section = = = Critical Perimeter = = 2 x 0.74 m

0.00 x 0.00 x 0.00 T 0.42

Area of Shadeded Portion 0.021

2 x

-0.05

\ Actual Shear stress tv = = = Allowable Shear stress = ks.tc where, ks = ( 0.5+b )

Vu bxd 1.5 x 0.00 740.00 x -50 0.000 N / mm2 ( CLAUSE 31.3.3 IS 456 : 2000 ) x 10000

b=

Short Side of Column = Long Side of Column = 0.47 but not greater than 1.0

0.00

ks = 0.50

Where,

tc = 0.25 fck tc = 0.25 M - 20


Allowable Shear stress = ks.tc =

= 0.56

1.12 N/mm2

N/mm2 SAFE

CHECK FOR OVERTURNING : ALONG LENGTH : Rm Restoring Moment = Rm = Applied Moment = 25.00 25.00 0.0 x 1.00 T.m T.m

F.O.S. = P

Restoring Moment Applied Moment 25.00 0 = > #DIV/0! 2.2 #DIV/0!

1.00

Das könnte Ihnen auch gefallen