ROAD D201 MAMMUTLA TO KGOMOTSO ESTABLISHMENT (a) Site Establishment ACCOMODATION OF TRAFFIC (a) Construction of Detours SETTING OUT

(a) Setting Out CLEARING AND GRUBBING (a) Clearing and Grubbing BORROW MATERIALS (a) Clearing and Grubbing (b) Removal of Overburden SECTION [18+600- 17+400] ROAD BED PREPARATION (a) Cut and Borrow to Fill (a) Road Bed Preparation (mixing,spreading & compacting) LAYER WORKS (a) Selected Layer (b) Sub Base ( c) Base SECTION [17+400- 16+200] ROAD BED PREPARATION (a) Cut and Borrow to Fill (a) Road Bed Preparation (mixing,spreading & compacting) PREFABRICATED CULVERTS (a) Installation of prefabricated culverts LAYER WORKS (a) Selected Layer (b) Sub Base ( c) Base SECTION [16+200- 15+000] ROAD BED PREPARATION (a) Cut and Borrow to Fill (a) Road Bed Preparation (mixing,spreading & compacting) LAYER WORKS (a) Selected Layer (b) Sub Base ( c) Base SECTION [15+000- 13+800] ROAD BED PREPARATION (a) Cut and Borrow to Fill (a) Road Bed Preparation (mixing,spreading & compacting) PREFABRICATED CULVERTS (a) Installation of prefabricated culverts LAYER WORKS (a) Selected Layer (b) Sub Base ( c) Base SECTION [13+800- 12+600] ROAD BED PREPARATION

5328170 2286043 0 95500 713250

310642.8

310283.9 310283.9 310283.9 310642.8

702178.8

310283.9 310283.9 310283.9 310642.8

310283.9 310283.9 310283.9 310642.8

702178.8

310283.9 310283.9 310283.9 310642.8

(a) Cut and Borrow to Fill (a) Road Bed Preparation (mixing,spreading & compacting) LAYER WORKS (a) Selected Layer (b) Sub Base ( c) Base SECTION [ 12+600 - 11+ 400] ROAD BED PREPARATION (a) Cut and Borrow to Fill (a) Road Bed Preparation (mixing,spreading & compacting) LAYER WORKS (a) Selected Layer (b) Sub Base ( c) Base OPEN DRAINS (18+600-11+200) (a) Construction of open drains CONCRETE KERBING, CHANNELLING AND CHUTES (a) Concrete Kerbing (b)Concrete Kerbing - Channelling (c) Concrete Chutes SEALS: MATERIALS AND GENERAL REQUIREMENTS (18+600- 13+000) (a) Prime Coat (b) Double Seals ( c) Fog spray SECTION [11+400- 10+200] ROAD BED PREPARATION (a) Cut and Borrow to Fill (a) Road Bed Preparation (mixing,spreading & compacting) LAYER WORKS (a) Selected Layer (b) Sub Base ( c) Base SECTION [10+200- 9+000] ROAD BED PREPARATION (a) Cut and Borrow to Fill (a) Road Bed Preparation (mixing,spreading & compacting) PREFABRICATED CULVERTS (a) Installation of prefabricated culverts LAYER WORKS (a) Selected Layer (b) Sub Base ( c) Base SECTION [9+000- 7+400] ROAD BED PREPARATION (a) Cut and Borrow to Fill (a) Road Bed Preparation (mixing,spreading & compacting) PREFABRICATED CULVERTS (a) Installation of prefabricated culverts LAYER WORKS (a) Selected Layer

930851.7

310642.8

930851.7

632220

7632281.25

310642.8

930851.7

310642.8

702178.8 930851.7

310642.8

702178.8

(b) Sub Base (c ) Base OPEN DRAINS (13+000-7+400) (a) Construction of open drains CONCRETE KERBING, CHANNELLING AND CHUTES (a) Concrete Kerbing (b) Channelling (c) Concrete Chutes SEALS: MATERIALS AND GENERAL REQUIREMENTS (13+000- 7+400) (a) Prime Coat (b) Double Seals ( c) Fog spray PITCHING, STONEWORK AND PROTECTION WORKS (a) Stone Pitching (b) Concrete Edge beam GUARD RAILS (a) Guard rails ROAD MARKINGS AND ROAD SIGNS (a) Road Markings and road signs FINISHING (a) Finishing helele

257350

443800

147815 702792

303250 200200

FEB MAR APR MAY 2131268 2664085 532817 2286043 0 95500 570600 142650

JUN

JUL

AUG

SEPT

OCT

310642.8

155142

155142 310283.9 310283.9

310642.8

702178.8

310283.9 155142

155142 310283.9

62128.56 279578.5

310283.9 310283.9 310283.9 279578.5 31064.28

631960.92 70217.88 310283.9 310283.9 217198.7 93085.17

NOV

DEC

JAN

FEB

MAR