Sie sind auf Seite 1von 3

RESUME

BADAL R. PATEL Pramukh Kutir, Amba mata street, Bechari, Tal-Umreth,Dist-Anand(388220) Phone No. (R) :- (02692) 287199 Cell No: - 09429253620/09543586926 E-mail:- patel_badal2006@yahoo.com CAREER OBJECTIVE To strive for highland of achievements, to keep acquiring multifunctional knowledge and skills in order to grow on a continual basis in the ever-changing environment and to obtain a challenging position in the job field. PERSONAL Name Date of Birth Gender Marital Status Nationality WORK EXPERIENCE : Badal R. Patel : 14TH JULY, 1985 : Male : Unmarried : Indian

I had completed 15 days industrial traing in JYOTI PVT LTD. During month of July 2007. I am working as a senior electrical engineer construction Dept. in ELECON ENGG. CO. & LTD, since 28th April,2010 to still to date. I have worked at CHP Second stream project in NTPC Dadri as Electrical engg. for ELECON ENGG. CO. LTD.
COMPANY PROFILE

ELECON ENGG. CO & LTD

is a, ISO 9001-2000,

All Material

handling equipments manufacturer .

It manufactures Stacker cum Reclaimer, Waghon Tripler, Ship

loader/unloader,Barrel type Reclaimer,Conveyors,Coal Handling Plant(CHP),Circular type Stacker Reclaimer,Double Boom Stacker etc. JOB PROFILE In ELECON ENGG. CO LTD my job profile includes:

At now I am working with MHE Division (material handling equipment) as a SENIOR ENGINEER- Electrical in construction department. Find out the bill of material (Cost of switchgear), Commissioning the Electric Control Panel like LT-MCC, PCC,HT-SFU,HT-VCB,All type panels. Manage and schedule all project work including design/engineering, programming at Project Site field. Manage and allocate available resources to execute projects on schedule. Assist directly with Design dept. for the generation of project drawings and documentation. Continue to develop and institute changes and improvements to project execution procedures and methodology. Planning of assembely work, wiring work and supervise it. After completion as per planning date testing work is carried out of LTMCC,PLC,VFD,HT,LT panels. Short out the faults and troubleshoot the same as well as the short material too. Plan, support and coordinate the erection/commissioning/testing of electrical control panels e.g., LT MCC, PLC,VFD, CONTROL DESKS etc. as per approval design of the company for respected machines. Working with Siemens S7-400 Redundant PLC Panel,MP277 Hmi,Micromaster Drive 420/430/440 VFD Panel errection, maintenance & operation testing at site,and also ABB AC Drives ACSTD-550, Make AB VFD POWERFLEX 400X. Working with Siemens ,ABB,C&S switch gears & protection. Regarding to the scope of company and contractor arranging the material required and check the programming logic as per the requirement or sequence. And reviewing the completeness of deliveries of all the material as well as drawing so it helps to timely execution of machines. And all necessary documentation at site. Travel to the site where elecons work is running. PERSUING PROJECTS

CHETTINAD INTERNATIONAL COAL TERMINAL LTD.(CICTPL) & SICAL(SICAL IRON ORE TERMINAL LTD.) at Ennore Port, Chennai. Currently Im handling responsibilities of electrical errection, Commissioning,Testing for 2 Stacker Cum Reclaimer in CICTPL & 1Stacker,1Stacker Cum Reclaimer, Waghon Tripler,Ship loader in SICAL.

ACADEMIC RECORD QUALIFICATION BOARD/ UNIVERSITY NORTH MAHARASHTRA UNIVERSITY, JALGAON. YEAR OF PASSING JULY 2009 MAY 2006 MAY-2001 PERCENTAGE & GRADE 73.26% (DISTINCTION) 62.37% FIRST CLASS

B. E (Electrical)

D.E (Electrical)
S.S.C

Technical Education Board Gandhinagar. Gujrat Secondary Education Board

83.86%
DISTINCTION

COMPUTER PROFICIENCY

1. Working Knowledge of MS-Office. 2. Operating system :- Windows 98, XP, 2000

EXTRA ACTIVITY

1. Attended One week training program on Siemens PLC System at


Siemens Kalwa, Mumbai.

DECLARATION

Hereby I declare that the above mentioned data is correct to my knowledge.

BADAL R. PATEL

Das könnte Ihnen auch gefallen