Submission
Wessex Group
Submission Details
Is this a 'Full Plans Submission'
or a 'Building Notice'?
Postcode
4 Applicant's Details
Please give the FULL name, postal address and daytime telephone/fax numbers.
Name:
Address:
Post Code:
Tel:
email:
Name:
Address:
Post Code:
Fax:
Tel:
Fax:
email:
Please indicate if the building is a 'workplace' that will be subject to provisions of the
Regulatory Reform (Fire Safety) Order 2005
YES
NO
Previous applications
Is this a re-submission for this project?
YES
NO
Reference number:
YES
NO
Reference number:
The Building Act allows fiv weeks to give a decision on a 'full plans' submission. Our aim is to process every submission as soon as possible.
In some cases we may require more information from you. To allow you time to obtain this information, we suggest that you agree to the
extension of the fiv week period to two months. It will not delay our processing of your application.
YES
YES
NO
NO
10 Charges
ENCLOSED
CHARGES
Table A. Dwellings not more than 3 storeys & not more than 300m2 in floor area
Number of dwellings
Extensions & Loft Conversions with floor area over 80m2 use table C
11
Statement
This notice is given in relation to the building work as described, in accordance with Building Regulation 12 (2) (a)
(b) and is accompanied by the appropriate payment. I/We understand that further charges may be payable by the applicant following the first
inspection by the local authority.
Name:
12
Signature:
Date:
Submission options.
You may choose to use either the'Full Plans' or 'Building Notice' option. However, the 'Building Notice' option cannot be used where:
a)
the building is or contains a 'workplace' under the Regulatory Reform (Fire Safety) Order 2005 which includes offices
shops, factories and hotels. With these types of buildings we are required to consult with the fir authority.
b)
The following information should be submitted together with one completed copy of this form.
Full Plan Applications:-
Two copies of detailed plans including full constructional specification and a site plan. A further two copies of layout plans will be
required for work to, or in relation to, buildings subject to the Regulatory Reform (Fire Safety) Order 2005 to enable consultation
with the fir authority.
In the case of an extension a site plan must be provided. Additional written information may also be requested.
Data Protection Act 1998. In order to improve our services to you we may share the information supplied by you in this form with other parts of the council.
We will not disclose your details to anyone outside the Council except in accordance with the Data Protection Act 1998.
If a precise address has not yet been allocated please provide an accurate description for location purpose. You cannot build
over, or close to, a public sewer without the consent of the Public Water Utility Company.
IMPORTANT : PLANS OR NOTICES MUST BE SUBMITTED TO THE COUNCIL UNDER THE BUILDING REGULATIONS AND ANY
NECESSARY PLANNING PERMISSION OBTAINED (If you haven't already done so you are advised
to contact your local Development Control Office), BEFORE ANY WORK ON SITE IS COMMENCED.
For further information or advice on Building Regulation matters please contact your local Building Control Department :
Bath & North East Somerset Council
Trimbridge House Trim Street
BATH BA1 2DP
Tel: 01225 477517
Fax: 01225 477637
email: building_control@bathnes.gov.uk
Web: www.bathnes.gov.uk
Charges)
Regulations
1998
General Notes
1.
2.
Table A
Number of
dwellings
CHARGE
BUILDING NOTICE
CHARGE
FULL PLANS
INSPECTION CHARGE
PLAN CHARGE
VAT
TOTAL
CHARGE
VAT
TOTAL
CHARGE
VAT
TOTAL
173.25
25.99
199.24
435.44
65.32
500.76
608.69
91.30
699.99
236.78
35.52
272.30
602.91
90.44
693.35
839.69
125.95
965.64
311.85
46.78
358.63
765.77
114.87
880.64
1,077.62
161.64
1239.26
386.93
58.04
444.97
884.73
132.71
1017.44
1,271.66
235.75
1507.41
467.78
70.17
537.95
979.44
146.92
1126.36
1,447.22
217.08
1664.30
548.63
82.29
630.92
1,100.72
165.11
1265.83
1,649.34
247.40
1896.74
571.73
1,175.79
176.37
1352.16
1,747.52
262.13
2009.65
594.83
85.76
89.22
657.49
684.05
1,370.99
205.65
1576.64
1,965.81
294.87
2260.68
617.93
92.69
710.62
1,566.18
234.93
1801.11
2,184.11
327.62
2511.73
10
623.70
93.56
717.26
1,779.86
266.98
2046.84
2,403.56
360.53
2764.09
11
629.48
94.42
723.90
1,949.64
292.45
2242.09
2,579.12
386.87
2965.99
12
635.25
95.29
730.54
2,118.27
317.74
2436.01
2,753.52
413.03
3166.55
13
641.03
96.15
737.18
2,289.21
343.38
2632.59
2,930.24
439.54
3369.78
14
646.80
97.02
743.82
2,428.97
364.35
2793.32
3,075.77
461.37
3537.14
15
652.58
97.89
750.47
2,597.60
389.64
2987.24
3,250.17
487.53
3737.70
16
658.35
98.75
757.10
2,766.23
414.93
3181.16
3,424.58
513.69
3938.27
17
664.13
99.62
763.75
2,934.86
440.23
3375.09
3,598.98
539.85
4138.83
18
669.90
100.49
770.39
3,103.49
465.52
3569.01
3,773.39
566.01
4339.40
19
675.68
101.35
777.03
3,234.00
485.10
3719.10
3,909.68
586.45
4496.13
20
681.45
102.22
783.67
3,400.32
510.05
3910.37
4,081.77
612.27
4694.04
21
693.00
103.95
796.95
3,477.71
521.66
3999.37
4,170.71
625.61
4796.32
22
704.55
105.68
810.23
3,595.52
539.33
4134.85
4,300.07
645.01
4945.08
23
716.10
107.42
823.52
3,713.33
557.00
4280.33
4,429.43
664.41
5093.84
24
727.65
109.15
836.80
3,831.14
574.67
4405.81
4,558.79
683.82
5242.61
25
739.20
110.88
850.08
3,950.10
592.52
4542.62
4,689.30
703.40
5392.70
26
750.75
112.61
863.36
4,067.91
610.19
4678.10
4,818.66
722.80
5541.46
27
762.30
114.35
876.65
4,185.72
627.86
4813.58
4,948.02
742.20
5690.22
28
773.85
116.08
889.93
4,303.53
645.53
4949.06
5,077.38
761.61
5838.99
29
785.40
117.81
903.21
4,421.34
663.20
5084.54
5,206.74
781.01
5987.75
30
796.95
119.54
916.49
4,487.18
673.08
516026
5,284.13
792.62
6076.75
31 and over
808.50
4,550.70
5,359.20
Table A Notes
1.
New dwellings over 300m2 in floor area charges to be calculated based on estimated cost
(Table C).
Table B
FULL PLANS
PLAN CHARGE
TYPE OF WORK
CHARGE
BUILDING NOTICE
INSPECTION CHARGE
VAT
TOTAL
CHARGE
CHARGE
VAT
TOTAL
178.72
26.81
205.53
127.66
19.15
146.81
140.43
21.06
127.66
19.15
146.81
185.10
27.77
19.15
146.81
274.47
19.15
146.81
19.15
146.81
CHARGE
VAT
TOTAL
178.72
26.81
205.53
161.49
268.09
40.21
308.30
212.87
312.76
46.91
359.67
41.17
315.64
402.13
60.32
462.45
363.82
54.57
418.39
491.48
73.72
565.20
453.19
67.98
521.17
580.85
87.13
667.98
Table B Notes
1.
References to floor area relate to the total internal floor area of all storey
Where more than one extension is proposed, the floor areas must be added together to determine
2.
the charge.
Some alterations to existing buildings to improve facilities for disabled persons are exempt from
3.
charges. For details and advice please contact us.
For extensions and loft conversions over 80m2 refer to Table C to determine charges. (Subject to
4.
minimum charge of 682.50 inc VAT).
Table C
Total
Estimated
Cost
PLAN CHARGE
VAT
TOTAL
INSPECTION CHARGE
CHARGE
VAT
TOTAL
BUILDING NOTICE
CHARGE
FEE
VAT
TOTAL
0 1,000
100.00
15.00
115.00
100.00
15.00
115.00
1,001 2000
150.00
22.50
172.50
150.00
22.50
172.50
2,001 5,000
200.00
30.00
230.00
200.00
30.00
230.00
5,001 10,000
230.00
34.50
264.50
230.00
34.50
264.50
10,001 15,000
63.75
9.56
73.31
191.25
28.69
219.94
255.00
38.25
293.25
15,001 20,000
75.00
11.25
86.25
225.00
33.75
258.75
300.00
45.00
345.00
20,001 25,000
85.00
12.75
97.75
255.00
38.25
293.25
340.00
51.00
391.00
25,001 30,000
95.00
14.25
109.25
285.00
42.75
327.75
380.00
57.00
437.00
30,001 35,000
105.00
15.75
120.75
315.00
47.25
362.25
420.00
63.00
483.00
35,001 40,000
115.00
17.25
132.25
345.00
51.75
396.75
460.00
69.00
529.00
40,001 45,000
125.00
18.75
143.75
375.00
56.25
431.25
500.00
75.00
575.00
45,001 50,000
135.00
20.25
155.25
405.00
60.75
465.75
540.00
81.00
621.00
50,001 55,000
145.00
21.75
166.75
435.00
65.25
500.25
580.00
87.00
667.00
55,001 60,000
155.00
23.25
178.25
465.00
69.75
534.75
620.00
93.00
713.00
60,001 65,000
165.00
24.75
189.75
495.00
74.25
569.25
660.00
99.00
759.00
65,001 70,000
175.00
26.25
201.25
525.00
78.75
603.75
700.00
105.00
805.00
70,001 75,000
185.00
27.75
212.75
555.00
83.25
638.25
740.00
111.00
851.00
75,001 80,000
195.00
29.25
224.25
585.00
87.75
672.75
780.00
117.00
897.00
80,001 85,000
205.00
30.75
235.75
615.00
92.25
707.25
820.00
123.00
943.00
85,001 90,000
215.00
32.25
247.25
645.00
96.75
741.75
860.00
129.00
90,001 95,000
225.00
33.75
258.75
675.00
101.25
776.25
900.00
135.00
1035.00
95,001 100,000
235.00
35.25
270.25
705.00
105.75
810.75
940.00
141.00
1081.00
85.11
12.77
97.88
989.00
REPLACEMENT WINDOWS
(DWELLINGS ONLY)
85.11
12.77
97.88
Table C Notes
Please enclose a written estimate of the cost of work, otherwise we will not be able to process your application. We may
1.
request a more detailed estimate at a later stage to justify any plan charge submitted.
2.
For replacement windows in non-domestic buildings the charge is based on the 'Total Estimated Cost' scale above.
3.
4.
'Total Estimated Cost' means a reasonable estimate that would be charged by a professional builder but excluding
professional (Architects/Surveyors) fees and VAT. No DIY estimates can be accepted.
Disabled persons some alterations to existing buildings to improve facilities for disabled persons are exempt from charges.
For details and advice please contact us.
OR PROJECTS WITH AN ESTIMATED COST OVER 100,000 PLEASE CONTACT US FOR ADVICE