Sie sind auf Seite 1von 3

1.

Calculate center of loads


1500 x = 1619 (3.7-x)
x= 1.92m
2. Calculate required area:
A req = [(1500+1619)+ Wf]/(qall)
Roughly
A req = [(1500+1619)* 1.1]/(200)
= 17.15 m2
Let B = 3.0 m
L = 5.8 m

Now q ultimate = Pu/A actual


For ACI assume average load combinations factor = 1.25
q ultimate = (1500+1619)*1.25/(3.0x5.8) = 224.066
now draw shear force diagram
starting from left
224.066*3.0*.98 = 658.754
658.754-1500*1.25 = -1216.25
-1216.25+224.066*3.0*3.7 = 1270.886
1270.886 1619*1.25 = -752.863
-752.863 + 224.066*3.0*1.12 = 0.0012 = 0

Das könnte Ihnen auch gefallen