MILL - A
SR.NO. 1 2 3 4 5 6 7 8 PROBLEMS PV 1 connection bolts are not installed (8 bolts) PV 1 to pyrate hopper connection bolt are not installed (8 bolts) PV 3 connection bolt are not installed (4 bolts) PV 4 connection bolt are not installed (5 bolts) limit switches are not installed in plate valves. instrument air line is not connected. level transmiiter is not installed. air line from compressor and to silo is not connected.
MILL - B
1 2 3 4 5 6 7 8 PV 1 connection bolts are not installed (8 bolts) PV 1 to pyrate hopper connection bolt are not installed (8 bolts) PV 3 connection bolt are not installed (4 bolts) PV 4 connection bolt are not installed (5 bolts) limit switches are not installed in plate valves. instrument air line is not connected. HIGH level transmiiter is not installed. air line from compressor and to silo is not connected.
MILL - C
1 2 3 4 5 6 7 8 PV 1 connection bolts are not installed (8 bolts) PV 1 to pyrate hopper connection bolt are not installed (8 bolts) PV 3 connection bolt are not installed (4 bolts) PV 4 connection bolt are not installed (5 bolts) limit switches are not installed in plate valves. instrument air line is not connected. HIGH level transmiiter is not installed. air line from compressor and to silo is not connected.
MILL - D
1 2 3 4 5 6 7 8 PV 1 connection bolts are not installed (8 bolts) PV 1 to pyrate hopper connection bolt are not installed (8 bolts) PV 3 connection bolt are not installed (4 bolts) PV 4 connection bolt are not installed (5 bolts) limit switches are not installed in plate valves. instrument air line is not connected. level transmiiter is not installed. air line from compressor and to silo is not connected.
MILL - E
1 2 3 4 5 6 7 PV 1 connection bolts are not installed (8 bolts) PV 1 to pyrate hopper connection bolt are not installed (8 bolts) PV 3 connection bolt are not installed (4 bolts) PV 4 connection bolt are not installed (5 bolts) limit switches are not installed in plate valves. instrument air line is not connected. LOW level transmiiter is not installed.
MILL - G
1 2 3 4 5 6 7 PV 1 connection bolts are not installed (8 bolts) PV 1 to pyrate hopper connection bolt are not installed (8 bolts) PV 3 connection bolt are not installed (4 bolts) PV 4 connection bolt are not installed (5 bolts) limit switches are not installed in plate valves. instrument air line is not connected. air line from compressor and to silo is not connected.
MILL - H
1 2 3 4 5 6 7 PV 1 connection bolts are not installed (8 bolts) PV 1 to pyrate hopper connection bolt are not installed (8 bolts) PV 3 connection bolt are not installed (4 bolts) PV 4 connection bolt are not installed (5 bolts) limit switches are not installed in plate valves. instrument air line is not connected. air line from compressor and to silo is not connected.
MILL - J
1 2 3 4 5 6 7 PV 1 connection bolts are not installed (8 bolts) PV 1 to pyrate hopper connection bolt are not installed (8 bolts) PV 3 connection bolt are not installed (4 bolts) PV 4 connection bolt are not installed (5 bolts) limit switches are not installed in plate valves. instrument air line is not connected. air line from compressor and to silo is not connected.
MILL - K
1 2 3 4 5 6 7 8 9 PV 1 connection bolts are not installed (8 bolts) PV 1 to pyrate hopper connection bolt are not installed (8 bolts) PV 3 connection bolt are not installed (4 bolts) PV 4 connection bolt are not installed (5 bolts) limit switches are not installed in plate valves. instrument air line is not connected. HIGH level transmiiter is not installed. air line from compressor and to silo is not connected. vessel pressure gaugae is damaged in panel.
compressor B
1 2 3 4 5 H.P. suction gauge is not installed. pressure switch is not installed. Load Unload pressure switch is not erected. copper tubing missing. Load unload solenoid is not connected.