TWSC - UNSIGNALIZED INTERSECTIONS WORKSHEET Worksheet 1 General Information Analyst Agency or Company Date Performed Analysis Time Period

JME CEI 5/7/99 AM Peak Site Information Intersection Jurisdiction Analysis Year Walnut/Elm Latah County 1999

Geometrics and Movements

Worksheet 2 Vehicle Volumes and Adjustments Vehicle Volumes and Adjustments Movement Volume (veh/h) Peak-hour factor, PHF Hourly flow rate (veh/h) Proportion of heavy vehicles, PHV Pedestrian Volumes and Adjustments Movement 13 14 15 1 2 261 1.000 261 0.10 3 51 1.000 51 0.10 4 161 1.000 161 0.10 5 311 1.000 311 0.10 6 7 51 1.000 51 0.10 8

Flow, Vx (ped/h) Lane width, w (ft) Walking speed,1 Sp (ft/s) Percent blockage, fp (Equation 17-11) 1. Default walking speed = 1.2 ft/s

0 7

0 7

8 6

HEET

Walnut/Elm Latah County 1999

9 131 1.000 131 0.10 15

10

11

12

16

8 6

3 6

TWSC - UNSIGNALIZED INTERSECTIONS WORKSHEET Worksheet 3 General Information Project Description Lane Designation Movements 1, 2, 3 4, 5, 6 7, 8, 9 10, 11, 12 Flared Minor-Street Approach Lane 1 2, 3 4 7, 9 Lane 2 2 5 Lane 3 2, 3 5, 6 Example Problem 2

Median Storage*

Upstream Signals Movements protected LT S2 protected LT S5 TH TH Distance to Signal, D (ft) Prog Speed, Sprog (mi/h) Cycle Length, C (s) Green Time, geff (s)

Computing Delay to Major-Street Vehicles Data for Computing Effect of Delay to Major-Street Vehicles Shared-lane volume, major-street through vehicles, vi1, blocked by LT Shared-lane volume, major-street right-turn vehicles, vi2, blocked by LT Saturation flow rate, major-street through vehicles, si1 S2 Approach

Saturation flow rate, major-street right-turn vehicles, si2 Number of major-street through lanes Length of study period, T (h)

S WORKSHEET

Grade, G 0 0 0 0

Right Turn Channelized? N N N N

Arrival Type 3

Saturation Flow Rate, s (veh/h)

Progressed Flow, Vprog (veh/h)

S2 Approach

S5 Approach

TWSC - UNSIGNALIZED INTERSECTIONS WORKSHEET Worksheet 4 General Information Project Description Example Problem 2

Critical Gap and Follow-Up Time tc = tc,base + tc,HV PHV + tc,G G - tc,T - t3,LT Major LT Movement tc,base (Exhibit 17-5) tc,HV PHV (from Worksheet 2) tc,G G (from Worksheet 3) t3,LT tc,T tc (Equation 17-1) single stage two stage single stage two stage 1 4 4.1 1.0 0.1 0 0.0 0.0 4.200 Minor RT 9 6.2 1.0 0.1 0.1 0 0.0 0.0 6.300 1 Minor TH 8 11 Minor LT 7 7.1 1.0 0.1 0.2 0 0.7 0.0 6.500 10

0.1

0.2

0.2

0.2

tf = tf,base + tf,HV PHV Major LT Movement tf,base (Exhibit 17-5) tf,HV PHV (from Worksheet 2) tf (Equation 17-2) Worksheet 5a Time to Clear Standing Queue (Computation 1) vT,prog Effective green, geff (s) Cycle length, C (s) Saturation flow rate, s (veh/h) Arrival type vprog (veh/h) Rp (from Chapter 16) Proportion of vehicles arriving on green, P (Equation 17-17) gq1 (Equation 17-18) gq2 (Equation 17-19) gq (Equation 17-20) Movement vL,prot Movement 5 vT,prog vL,prot 1 4 2.2 0.9 0.1 2.3 Minor RT 9 3.3 0.9 0.1 3.4 1 Minor TH 8 11 Minor LT 7 3.5 0.9 0.1 3.6 10

3 1.00

3 1.00

TWSC - UNSIGNALIZED INTERSECTIONS WORKSHEET Worksheet 6 General Information Project Description Example Problem 2 v9 vc,9 = cp,9 = pp,9 = cm,9 = cp,9 pp,9 = p0,9 = v4 vc,4 = cp,4 = pp,4 = cm,4 = cp,4 pp,4 = p0,4 = p*0,4 = v8 vc,8 = cp,8 = 312 689.80 1 689.80215 1.000 0.826 281 722.17 1 722.17 0.834

Impedance and Capacity Calculation Step 1: RT from Minor Street Conflicting flows (Exhibit 17-4) Potential capacity (Equation 17-3 or 17-29) Ped impedance factor (Equation 17-12) Movement capacity (Equation 17-4) Prob of queue-free state (Equation 17-5) Step 2: LT from Major Street Conflicting flows (Exhibit 17-4) Potential capacity (Equation 17-3 or 17-29) Ped impedance factor (Equation 17-12) Movement capacity (Equation (17-4) Prob of queue-free state (Equation 17-5) Major left shared lane prob of queue-free state (Equation 17-16) Step 3: TH from Minor Street (4-leg intersections only) Conflicting flows (Exhibit 17-4) Potential capacity (Equation 17-3 or 17-29) Ped impedance factor (Equation 17-12)

pp,8 = Capacity adjustment factor due to impeding movement (shared lane f8 = p0,4 p0,1 pp,8 = 0.917 use p*) (Equation 17-13) Movement capacity (Equation 17-7) Prob of queue-free state Step 4: LT from Minor Street (4-leg intersections only) Conflicting flows (Exhibit 17-4) Potential capacity (Equation 17-3 or 17-29) Ped impedance factor (Equation 17-12) Major left, minor through impedance factor Major left, minor through adjusted impedance factor (Equation 17-8) Capacity adjustment factor due to impeding movements (Equation 17-14) Movement capacity (Equation 17-10) Step 5: LT from Minor Street (T-intersections only) Conflicting flows (Exhibit 17-4) Potential capacity (Equation 17-3 or 17-29) Ped impedance factor (Equation 17-12) Capacity adjustment factor due to impeding movement (shared lane use p*) (Equation 17-13) Movement capacity (Equation 17-7) Notes 1. For 4-leg intersections use Steps 1, 2, 3, and 4. 2. For T-intersections use Steps 1, 2, and 5. vc,7 = cp,7 = pp,7 = f7 = p0,4 p0,1 pp,7 = cm,7 = cp,7 f7 = vc,7 = cp,7 = pp,7 = p"7 = p0,11 f11 = p'7 = f7 = p'7 p0,12 pp7 = 0.611 cm,7 = f7 cp,7 = v7 286.5 716.31845 1 716.31845 0.8325 cm,8 = cp,8 f8 = p0,8 = v7

KSHEET

v12 vc,12 cp,12 pp,12 cm,12 = p0,12 = = = = cp,12 pp,12 = v1 vc,1 = cp,1 = pp,1 = cm,1 = cp,1 pp,1 = p0,1 = p*0,1 = v11 vc,11 = cp,11 = pp,11 = f11 = p0,4 p0,1 pp,11 = cm,11 = cp,11 f11 = p0,11 = v10 vc,10 = cp,10 = pp,10 = p"10 = p0,8 f8 = p'10 = f10 = p'10 p0,9 pp,10 = cm,10 = f10 cp,10 = v10 vc,10 = cp,10 = pp,10 = f10 = p0,4 p0,1 pp,10 = cm,10 = cp,10 f10 =

TWSC - UNSIGNALIZED INTERSECTIONS WORKSHEET Worksheet 8 General Information Project deskription Shared - Lane Capasity
C SH

Example problem 2

vy
y

vy cm, y y

(Equation 17-15)

Movement 7 8 9 10 11 12

v (veh/h) 51 131

cm 286.5 722.17

Worksheet 9 Effec of Flared Minor- Street Approaches Movement 7 cSep (from Worksheet 6 or 7) Volume (from Worksheet 2) Delay (Equation 17-38) Qsep (Equation 17-34) Qsep +1 Round (Qsep +1) nmax(Equation 17-35) cSH cSep n cact (Equation 17-36)

Movement 8

Movement 9

Movement 10

NS WORKSHEET

cSH (veh/h) 506.4

506.3865 0.359409

Movement 11

Movement 12

TWSC - UNSIGNALIZED INTERSECTIONS WORKSHEET Worksheet 10 General Information Project deskription Example problem 2 Queue Control Length Delay cm (veh/h) v/c (Equation (Equation 17506.4 0.3593997 <2 12.358

Control Delay, Queue Length, Level of Service Lane 1 2 3 1 2 3 v (veh/h) 182

Movement 1 4

v (veh/h) 161

cm (veh/h) 689.8

v/c

Queue Control Length Delay (Equation (Equation 1710.318

0.2334 <1

Worksheet 11 Delay to Rank 1 Vehicles poj (Equation 17-5) vi1, volume for Stream 2 or 5 vi1, volume for Stream 3 or 6 si1, saturation flow rate for Stream 2 or 5 si1, saturation flow rate for Stream 3 or 6 poj (Equation 17-6) d major left, delay for Stream 1 or 4 N, number of major- street through lanes dRank, delay for Stream 2 or 5 (Equation 17-39) S2 Approach P 0,1 =

P 0,1 =

ORKSHEET

LOS (Exhibit 17-2) B

Delay and LOS 12.358 B

LOS (Exhibit 17-2)

Delay and LOS B

S5 Approach p 0,4 =

p 0,4 =