CELESTIAL SYSTEMS ID 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 Task Name Duration Start Finish

Installation of A\c Ducts Gypsum ceiling works Framework installation & levelling Fixing of boards Taping and jointing All necessary cuttings for Light fittings and A\c grills Finishing Grid ceiling works Vertical suppports Framework Fixing of 2x2 fittings Painting Putty finish Scrubbing 3 coats paint Finishing Installation of carpets Installation of workstations Framing assembly Pulling of electrical and data cables. Installation of tiles Fixing of data and electrical face plates Removing of all plastics Carpentry Works Board room table Reception table Partition Laminate works Doors Boxing for FA panel Cabling through Raceways(electrical,data and voice) Plumbing works in pantry Flooring- Reception and Pantry Plastering of blockwork walls Vinyl flooring in electrical room False flooring in server room Electrical works completion Fixing and connection of all DB panels(including ups panel) Installation of inverters and Ups Commissioning HVAC works completion Connection of ducts to AHU and machines. Copper drainage and chill water piping works . Checking for leakages Filling of refrigant Installation of Hi-wall units in elec and server room Commisioning Networking works completion Installation of network racks Installation of server racks Installation of ISP racks Installation of servers and EPABX

7 days

Tue 1/17/12

Tue 1/24/12 Mon 1/30/12 Thu 1/26/12 Sat 1/28/12 Mon 1/30/12 Mon 1/30/12 Mon 1/30/12 Wed 2/1/12 Wed 1/25/12 Tue 1/31/12 Wed 2/1/12 Thu 2/2/12 Fri 1/27/12 Mon 1/30/12 Wed 2/1/12 Thu 2/2/12 Fri 2/3/12 Fri 2/3/12 Fri 2/3/12 Fri 2/3/12 Fri 2/3/12 Fri 2/3/12 Fri 2/3/12 Tue 1/24/12 Sat 1/21/12 Sat 1/21/12 Tue 1/24/12 Tue 1/24/12 Tue 1/17/12 Wed 1/25/12 Mon 1/23/12 Thu 1/26/12 Wed 1/25/12 Thu 1/26/12 Fri 1/27/12 Mon 1/30/12 Fri 1/27/12 Sat 1/28/12 Mon 1/30/12 Sat 2/4/12 Wed 1/25/12 Wed 1/25/12 Thu 1/26/12 Thu 1/26/12 Fri 2/3/12 Sat 2/4/12 Fri 2/3/12 Sat 1/28/12 Sat 1/28/12 Sat 1/28/12 Mon 1/30/12 Fri 2/3/12 Fri 2/3/12 Fri 2/3/12 Thu 2/2/12 Fri 2/3/12 Fri 2/3/12 Mon 2/6/12

5 days Tue 1/24/12 2 days Tue 1/24/12 2 days Thu 1/26/12 1 day Sat 1/28/12 1 day Sat 1/28/12 1 day Sat 1/28/12 7 days Tue 1/24/12 1 day Tue 1/24/12 1 day Mon 1/30/12 1 day Tue 1/31/12 8 days Tue 1/24/12 3 days Tue 1/24/12 2 days Fri 1/27/12 2 days Mon 1/30/12 1 day Wed 2/1/12 1 day 1 day 1 day 1 day 1 day 1 day 1 day Thu 2/2/12 Fri 2/3/12 Fri 2/3/12 Fri 2/3/12 Fri 2/3/12 Fri 2/3/12 Fri 2/3/12

7 days Tue 1/17/12 5 days Tue 1/17/12 5 days Tue 1/17/12 7 days Tue 1/17/12 7 days Tue 1/17/12 1 day Tue 1/17/12 1 day Tue 1/24/12 1.88 days Sat 1/21/12 4 days Mon 1/23/12 1 day Tue 1/24/12 1 day Wed 1/25/12 2 days Wed 1/25/12 3 days Thu 1/26/12 1 day Thu 1/26/12 1 day Fri 1/27/12 1 day Sat 1/28/12 10.5 days Tue 1/24/12 1 day Tue 1/24/12 1 day Tue 1/24/12 1 day Wed 1/25/12 0.5 days Thu 1/26/12 2 days Thu 2/2/12 0.5 days Sat 2/4/12 6 days 1 day 1 day 1 day 1 day Fri 1/27/12 Fri 1/27/12 Fri 1/27/12 Fri 1/27/12 Sat 1/28/12

INSTALLATION OF GRID CEILING TILES LIGHT FITTTINGS AND A\C GRILLS 2/2/12 1 day Thu FA works completion Installation of all accessories Installation of all panels Commissioning Access control works completion FINAL CLEANING SNAG FIXING AND HANDOVER 1 day 1 day 0.5 days 0.5 days 2 days 4 days Thu 2/2/12 Thu 2/2/12 Thu 2/2/12 Thu 2/2/12 Thu 2/2/12 Thu 2/2/12