ImportanceofIncreasingEfficiencyin PowerSector
Lessfuelburntperunit LessCO2 andotherpollutantsperunit Conservesnonrenewablefuel Reducescostofgeneration Reducesrequirementoffreshcapacityaddition
PredominanceofCoal
Coalispredominantsourceofenergyforpower generation 40%inworld 70%inIndia CoallikelytoremainmainstayofIndia'selectricity generationfornexttwentyfiveyears Withexplosivegrowthinenergydemand,the consumptionofcoalisslatedtoincreasemanyfold
StrategiestoImproveEfficiencyin PowerSector
Multiprongedstrategyhastobeadopted:
Improvementsinexistingtechnologiessuchas subcritical powerplantsandhydropowerplants R&Mofagedpowerplants Introductionofsupercriticalandultrasupercritical powerplants Introductionofadvancedtechnologiessuchas IntegratedGasificationCombinedCycle(IGCC) Reducelossesinpowertransmission
ImprovementsinSteamTurbines
Forevery1kcal/kWhreductioninTGcycleheatrate,coal consumptionperyearreducesby 300tonnes for210MWsets 700tonnes for500MWsets Since1977,heatrateofBHELs steamturbineshasreduced 210MWby5.4% 500MWby3.1% Efficiencyofsteamturbinesisbeingimprovedby Moreefficientaerodynamicbladeprofiles Redesigninginletandoutletsections Reductionofprimaryandsecondaryheatlosses Effectiveinterstagesealing Usinghighersteamparametersespeciallyreheatsteam temperature
New500MWSteamTurbine
Newvariantof500MWsteamturbineintroducedby BHEL Reheatsteamtemperatureraisedfrom537Cto565C FlowpathsofHP,IPandLPturbinesredesigned Advancedclassbladeprofiles Reductionofheatrateby10kcal/kWhr Thermalperformance0.6%betterthanconventional cycle NewcycleadoptedforNTPCDadri,Simhadri, Ennore,Aravali,etc.
NewRatingof600MW
Newunitratingof600MWdeveloped UsesexistingHPandIPturbinemodulesof500MW LPturbinechangedfromN302x10.0toN304x6.3(twoLP turbinesof250MW) Twoalternatives 6heatercycleand537Creheattemperature 7heatercycleand565Creheattemperature LowercostperMW Onepercentimprovementinheatrateoverconventional500 MW Savingof24,000tonnes ofcoalperyear First600MWplantbeinginstalledatNorthChennai,witha7 heatercycle
AuxiliaryPowerConsumption
AerofoilbladedPAfans,withinletguidevanecontrolin placeofdampercontrol,hashelpedreducefanlosses Replacementofwormgearbyplanetarygearinpulverisers hasimprovedenergyefficiency. Efficiencyofboilerfeedpumpsbeingenhancedbyone percentthroughthermohydraulicredesign UseofvariablespeeddriveswithIDfansandBFPs can reduceenergylossesatpartloads UseofefficientmotorssuchasHcompactcanincrease driveefficiencyby0.6%
Control&Instrumentation
Moderndistributedcontrolsystemshelptorunall powerplantequipmentatclosetotheiroptimum operatingpoints PADO(PerformanceAnalysis,Diagnosisand Optimisation)softwareprovidesonlineguidanceto runtheplantwithminimumlossesanddowntime Smartwallblowingsystemcanoptimise steam blowingcycleforsootblowers Improvingtheheatabsorptioninboilersurfaces Reducingtheconsumptionofauxiliarysteam
SupercriticalPowerPlants
Powerplantcycleabovecriticalpressure(221.2bar) Offersadvantageofburnlessfuelforthesame output andlowemissions CurrentsteamparametersinIndia:250bar,568C mainsteamand593Chotreheattemperature Steamparametersareexpectedtoberaisedfurther,in linewithglobaltrends Duringthe12thFiveYearPlan,over50%ofthe capacityexpansionwillbethroughsupercritical powerplants
UltraSupercriticalPowerPlants
Worldwide,UltraSupercritical(USC)plantswith steamparametersupto280barand620OChavebeen setup DevelopmentofUSCplantswithsteamparametersof 300barand700OCisinprogress Thefirstsuchplantisexpectedby2015
USCTechnologyinIndia
IndiaalsoplanstoshifttoUSCsteamparametersover thenextfewyears IndiaalsoplanstodevelopUSCtechnologywith300 barand700OC Thekeychallenges
Developmentofsuitablematerials Developmentofanoptimumthermodynamiccycle Developmentofmajorequipmentsuchassteam generators,steamturbinesandtheirauxiliaries
IntegratedGasificationCombinedCycle (IGCC)
Importanttechnologyinthecontextofclimatechange EmissionofCO2 perMWlessthanforconventional plants Potentialefficiency(~45%)higherthanthatofsubcritical (~37%)andsupercritical(~40%) CaptureofCO2 iseasierinthecaseofIGCC LowNOx andSOx emissions Lowwaterconsumption Fuelflexibility:coalaswellasrefineryresidues Syn Gascanbeusedforconversiontooil,chemicals, fertiliser andhydrogen
IGCCvs.ConventionalCoalPlant
ConventionalCoalPlant Plant NOx 350ppm SOx 600ppm SPM 50mg/Nm3 CO2 Emission High CO2 captureready No Fuelconsumption High less Waterconsumption High <25ppm <245ppm <2mg/Nm3 10%Less Yes 7% 40%Less IGCC
BHELs ExperienceinIGCC
BHELhasbeendevelopingIGCCtechnologysincethe earlyeighties BHELhasgainedalotofexperienceinthe developmentandoperationofapilot6.2MWIGCC plantatTrichy BHELnowwellpoisedtosetupa182MWIGCC DemonstrationProjectwithAPGENCOatVijaywada UsesPressurised Fluidised BedGasification(PFBG) technology,mostsuitedforIndiancoals
MilestonesinIGCCDevelopment
Scale up: Geometrical - 1:1.14 Capacity - 1: 1.21 Pressure - 1:0.9
125 MW
IGCC
6.2 MW CCDP Concept Design
18 TPD (PEDU)
Tiruchy
BHELs IGCCDevelopment
6.2 Mwe IGCC with moving bed gasifier Process & Equipment Developme nt (PEDU) pilot plant based on PFBG 6.2 Mwe IGCC retrofitted with PFBG
Start July 1983 Commg Mar 1988 Developmental testing Compln Sep 1992
To gain experience in gasification and IGCC plant operation Design and fabrication of major equipmt and development of PFBG technology Data for scale-up of gasifier and its integration with CC
182MWIGCCProject
Rating182MW Gasifier 2265tpd coalcapacityusingPressurised Fluidised BedGasification(PFBG)technology Gasifier Pressure:28kg/cm2,Temperature:1025C Ashcontent:3642%(Ashupto50%canbeaccepted) Gascleanupsystemincludingbarrierfiltersandwet scrubbers Frame9EGasTurbine:102MW HeatRecoverySteamGenerator(Twopressure) Steamturbine:80MW Grossefficiency:>40% Coal&ashhandlingsystem Switchyard
FutureDirectionsinIGCC
450650MWcapacitycommercialplant Advancedclassgasturbine Oxygenenrichedgasification Lowcostoxygenseparationtechnology Hotgascleanuptechnology Greaterdegreeofintegration CO2 capture Hydrogenfiringingasturbines Integrationwithfuelcells
PowerTransmission
FlexibleACTransmissionSystems(FACTS),havebeen developedandintroduced Canbeusedintransmissionnetworkstoreducesystem losses Thyristor ControlledSeriesCompensation(TCSC)systems enableincreasedpowerflowinexistinglines ControlledShuntReactor(CSR)developedtoreplace fixed shuntreactors Fixedshuntreactorscausecontinuouspowerlosses CSRcomesintothecircuitonlywhenrequired Installed50MVARCSRinPGCILsubstationatItarsi in 2001 Excellentoperationalfeedback MAHAGENCOhasplacedordersfortwosetsofCSRs for differentlocations
HVDC
HighVoltageDirectCurrent(HVDC)isalso employedtoreducetransmissionlossesinlong distancepowerflow. Advantages:lowerlosses,completecontrolofpower flowontheHVDCline,reducedrequirementofright ofway,etc. HVDCcanalsobeusedtointerconnectelectrical gridsoperatingatdifferentfrequencies Surpluspowerfromoneregioncanbetransmittedtoa powerdeficitregion Moreefficientandeffectiveutilizationofresources
Conclusion
Indiaispoisedtoexpanditspowersectorinabigway Newtechnologiesarebeingintroducedtoenhance energyefficiency Internationalcooperationwouldbegreatlywelcome intheseareas