Architecture Area Overall Status

Architecture Sub-Area

1 Platform Decisions 2 2 1 1 1 o 0 0 0 1 1 3PV Platform Decisions 1 1 1 1 1


Transport

MME EMS eNodeB

SGW PDN-GW CPE PCMCIA Device Manager

Policy Manager Regulatory AAA HSS MBMS/Video Core MPLS Backhaul Public/Private Network Support IP-SEC Tunnelling on Backhaul Backhaul Redundancy

0 0 0 1 Licensing (Capacity, Feature, etc.) 1 Operations and Maintenance 1 1 1 1 2 Performance Management 0 Debugging 1 Availability / Reliability 1 Mobility 2 2 0 1 1 Network Architecture 1

Network Management Approach Auto-discovery Procedures, Tools, UI's Interfaces SDL, Statistics Support/Debugging Box and System Analysis

Inter-system Mobility Intra-system packet mobility VCC Roaming

Auto-Discovery/Pooling

Typical Cardinality

1 Mobile Video Architecture 1 MVNO

0 GSM Upgrade/Overlay Strategy 1 Charging Billing 1 Self Optimization 1 Product Cost Analysis 1 Security 2 Reuse Analysis 2 Regulatory 1 Public Safety 1 System Engineering 1 1 0 Differentiation Initiatives 1 0 0 0 0 0 0 Subscriber Provisioning/Mgmt 0 0

System planning/dimensioning Deployment procedures

Video RF Performance Operability and Site Config Migration/Upgrade Site Insertion Time-to-Market

Service dimensioning Customer care support

Issue/Status

SA Engagement

Win Limiting

Modem: Flex4 Pending Program Commit PA Solution/Budget program still not committed Open PA Interface (CPRI) / D4 to integrate external PA's Small considerations (Femto/Pico) translations of architecture Blocked on platform strategy (funding, partner, etc.) Blocked on platform strategy (funding, partner, etc.) No traction on sourcing strategy or WiMAX/Netopia Reuse need plan-must include manager aspect Architectural alignment (WiMAX and LTE), Program Commitment Needed

Brian Craig I. Dennis Dennis Dennis Dennis Arun, Raj Arun, Raj Ted, Troy Ted

Recommendations in place in E2E AD, Need to progress on relationship Recommendations in place in E2E AD, Need to progress on relationship Recommendations in place in E2E AD, Need to progress on relationship Recommendations in place in E2E AD, Need to progress on relationship Recommendations in place in E2E AD, Need to progress on relationship

Bob Kamala TBD TBD Mark, Craig R.

Do we need support to "tunnel" through shared public networks? Ensure that support is in HW for support of this in case required? Is this a requirement and if so what is release timing?

? Craig R.

May be under control - need a review and quick check May be under control - need a review and quick check May be under control - need a review and quick check May be under control - need a review and quick check

Craig I. Craig I. Craig I. Craig I.

No known work started. ?

Lloyd LLoyd LLoyd LLoyd

Design is assuming some significant pooling and network nodes. Need to determine a typical configuration. Mark S. Tech brief in place. Need to constrain the options/scenarios. Craig R.

Focus on Motorola GSM Roadmap with LTE Focus. Other discussion of insertion strategy should be captured under the Diff. Initiative. TBD Bob? ? Must finalize with better numbers, pending BTS RF decisions Need to decide between certificate-based vs. shared keys May have to be revisited based on SGW/PDNGW approach Dennis Steve Platform Leads Kamala Need to assess direction relative to PS needs (check-in)

Brainstorming meeting conducted, plan being synthesized

Mark

Kishore Wireless aspects and subscriber dimensionin (NAT WiSAC)