Beruflich Dokumente
Kultur Dokumente
UNIT TESTING SCENARIO SCENARIO NUMBER DESCRIPTION : BPML QM03-16 : GAUGE CALIBRATION
PREPARED & TESTED BY NAME SIGNATURE DATE TEAM Approved By : JL Hatekar : : : : Kabir R (PwC)
Page 1 of 29
Testing: Unit Testing / User Manual
1. Transaction Code/ Path Enter the menu path of the transaction code, which is going to be tested by the user. Menu Path T.Code Logistics - Create IP11
2. Input Data Enter the Input parameters, which need to be given by the user during the testing of this scenario. 2. Input the value for the fields and then if required, copy the screen shot of the input screen after the table. 3. If the scenario has multiple screen inputs, which needs to be processed, repeat the step 2 for every screen.
1.
2.1
Input Screen Name Create Sales Order: Initial Screen Description of the Field Order Type Nature of the Field Mandatory
Page 2 of 29
Testing: Unit Testing / User Manual
Select Packages
Click New Entry And make the entries as per requirement in respective columns as shown below
Page 3 of 29
Testing: Unit Testing / User Manual
END
Page 4 of 29
Testing: Unit Testing / User Manual
TO CREATE CALIBRATION TASK LIST Menu Path T.Code Logistics - Create IA05 / 06
ENTER
Page 5 of 29
Testing: Unit Testing / User Manual
Tick the required calibration frequency and Go to Insp. Charat bottom menu and click
Page 6 of 29
Testing: Unit Testing / User Manual
Select the MIC by drill down or Select Quant. / Qual. Characteristics, type Short text of Insp Char. And go to Control Indicator and tick required data as shown in below screen and tick
Page 7 of 29
Testing: Unit Testing / User Manual Module: Quality Management Click on tick , following screen will display. Drill down on selected set as it is Qualitative Inspection char.
Page 8 of 29
Testing: Unit Testing / User Manual Select the selected set and click on tick following screen will display.
Also select the defect catalog and code group and ENTER
Select the sampling scheme from drill down. Enter, following screen will display.
Page 9 of 29
Testing: Unit Testing / User Manual
Similarly for Quantitative char. Tick on Quant. And type desc, select the line and go to control indicator. And select the required function as shown in following screen.
Click on tick,
Page 10 of 29
Testing: Unit Testing / User Manual
Page 11 of 29
Testing: Unit Testing / User Manual
Logistics - Create
IP42 / 02/ 03
Page 12 of 29
Testing: Unit Testing / User Manual
Select Maint. Plan. Cat. As PM Maintenance Order and select the strategy from drill down.
Enter
Page 13 of 29
Testing: Unit Testing / User Manual
Page 14 of 29
Testing: Unit Testing / User Manual
Go to Maint. Plan scheduling parameters tab enter, enter Call horizon, Scheduling period, tick completion requirement, Start of cycle.
Page 15 of 29
Testing: Unit Testing / User Manual
Page 16 of 29
Testing: Unit Testing / User Manual Click on next screen will display
Tick of Equipment task list if the task list is created for an equipment or tick on Gen. task if the task list is created for general ( All items same) & execute. Following screen will display.
Page 17 of 29
Testing: Unit Testing / User Manual
Save and following screen will display, and Created maintenance plan No. will display at bottom of Screen ( Here it is 151)
Page 18 of 29
Testing: Unit Testing / User Manual
Page 19 of 29
Testing: Unit Testing / User Manual
Click of Start date of start of cycle will display or give date of start of cycle
Page 20 of 29
Testing: Unit Testing / User Manual
Save to start the Cycle, the Inspection lot / Order will get created. To check inspection lot T code QA32, The schedule call can be seen from IP24, to see the Order T code IW33 To see Inspection lot T codeQA32
Page 21 of 29
Testing: Unit Testing / User Manual
Execute,
List of inspection lot will get display. To see the Schedule calls T code IP24 ( Use Variant /PM)
Page 22 of 29
Testing: Unit Testing / User Manual
Page 23 of 29
Testing: Unit Testing / User Manual Execute , -- Work order 4000502 is created.
Order can be seen from T Code -- IW33 Give order No. 4000502
Enter
Page 24 of 29
Testing: Unit Testing / User Manual
Go to Operation Tab
END
Page 25 of 29
Testing: Unit Testing / User Manual
Page 26 of 29
Testing: Unit Testing / User Manual
Page 27 of 29
Testing: Unit Testing / User Manual
Page 28 of 29
Testing: Unit Testing / User Manual
Page 29 of 29