Role of Cladding and Vapour Barriers: Contain Isolation Material To keep insulation dry. Mechanical Protection
Aluminised steel Aluminium Stainless steel Polyester etc. GRE wrap Tapes
CONFIDENTIAL
10/14/2011
DAMAGED CLADDING
CONFIDENTIAL
10/14/2011
INSULATION MATERIAL
Water leachable salt content. chlorides, sulphate, acidic materials in fire retardants Water retention, permeability, wettability. Insulation foams that react with water to form acids
Rockwool PU Foam
FoamFoam-glass
CONFIDENTIAL
10/14/2011
CONFIDENTIAL
10/14/2011
WATER SOURCES
1. 2. 3.
CONFIDENTIAL
10/14/2011
WATER SOURCES
CONFIDENTIAL
10/14/2011
TEMPERATURE
Higher temperature: Increased corrosion rate High salt concentration Reduced life coatings
Lower temperature:
Condensation
Cyclic temperatures, Temperature gradients increase risk for Corrosion Under Insulation.
CONFIDENTIAL
10/14/2011
10
TEMPERATURE
Carbon Steel -5 to 60C Moderate 50-120C Severe 120-150C Moderate 150-250C Cold spots >250C No risk
Stainless steel:
Stress Corrosion Cracking <50C 50-120C 120-150C >150C no SCC High Moderate no SCC
CONFIDENTIAL
10/14/2011
11
Application
10/14/2011
12
COATING STATUS
CONFIDENTIAL
10/14/2011
13
Difficult to seal Cold spots (Hot spots) Maintenance e.g. valves Water traps
CONFIDENTIAL
10/14/2011
14
EQUIPMENT SHAPE
CONFIDENTIAL
10/14/2011
15
CONFIDENTIAL
10/14/2011
16
CONFIDENTIAL
10/14/2011
17
CONFIDENTIAL
10/14/2011
18
THE CUI INSPECTION GUIDELINE CONSISTS OF TWO STEPS: Step 1: Step 2: A criticality ranking requiring limited input data. A detailed assessment and inspection plan for the high ranking items.
CONFIDENTIAL
10/14/2011
19
The Susceptibility to CUI is determined with the dedicated questions in the Criticality Matrix for CUI. This provides a worst case assessment. The Consequence of Failure is copied from the internal corrosion failure. The Criticality Matrix gives the Criticality Ranking for CUI.
CONFIDENTIAL
10/14/2011
20
10
1. Determine the Probability based on the cumulative score from the Susceptibility table. 2. Re-address the Criticality based on this Probability rating. 3. Determine the Confidence Rating for CUI using the dedicated Confidence Rating questionnaire. 4. Establish the Inspection/Maintenance Strategy for CUI based on the Criticality and Confidence Rating.
CONFIDENTIAL
10/14/2011
21
Susceptibility Susceptibility C C riticality riticality R Rating ating Consequence onsequence C Confidence onfidence C Factor Factor
IS 0 IS1 IS1 IS2 IS2 Inspection Inspection IS3 IS3 Strategies Strategies IS4 IS4 IS5 IS5
CONFIDENTIAL
10/14/2011
22
11
CONFIDENTIAL
10/14/2011
23
CUI PREVENTION
Only insulate where necessary Use screens for personnel protection Use insulating coatings Use waterproof cladding (plastics, laminates) Use immersion coating or TSA Use non-contacting insulation
CONFIDENTIAL
10/14/2011
24
12
50 - 120 C
* In cyclic service (or temporarily temperature changes), the range of the most critical temperature reached shall be taken.
Copyright of Shell Global Solutions (Malaysia) Sdn Bhd
CONFIDENTIAL
10/14/2011
25
rarely wetted High Integrity (<10% of the time) Design Medium Integrity Design frequently wetted (~40% of the time) permanently wetted (e.g. cooling tower, dripping water, condensation)
4 7.1 mm or Surface at Location of Penetrations through Insulation 4 or Surface at Location of Reinforcement Rings & Other Water Traps
* The most susceptible area of the equipment determines the rating. **Can be taken from RBI study for internal corrosion.
Copyright of Shell Global Solutions (Malaysia) Sdn Bhd
CONFIDENTIAL
10/14/2011
26
13
CONFIDENTIAL
10/14/2011
27
Insulation type
Low chloride insulation material (<10ppm Cl-)
External environment
Points
Not present
Inside building Rarely wetted (<10% of the time) Permanently wetted (e.g. cooling tower, dripping water, condensation) frequently wetted (~40% of the time)
120 - 150 C
50 - 120 C
Unpainted or unknown
* In cyclic service (or temporarily temperature changes), the range of the most critical temperature reached shall be taken.
CONFIDENTIAL
10/14/2011 28
14
H M L N
L L N N
MH M
H
MH M
E H
MH M
E E H
MH
L N
CONSEQUENCE CATEGORY
NO/SLIGHT MINOR DAMAGELOCAL DAMAGE MAJOR DAMAGE EXT. DAMAGE DAMAGE (<10K) (10-100K) (0.1-1M) (1-10M) ( >10M) NO/SLIGHT INJURY NO/SLIGHT EFFECT NEGLIGIBLE MINOR INJURY MAJOR INJURY SINGLE FATALITY MINOR EFFECT LOW LOCALISED EFFECT MEDIUM MAJOR EFFECT HIGH MULTIPLE FATALITIES MASSIVE EFFECT EXTREME
CONSEQUENCE CLASS
CONFIDENTIAL
10/14/2011
29
Yes +0.1
Intermediate No 0 -0.1
+0.1
-0.1
+0.1
-0.1
For Confidence Rating add scores; minimum: -0.2, maximum: +0.2 Confidence Rating: -0.2 = very low, - 0.1 = low, 0 = medium, +0.1 = high, +0.2 = very high *In case of new equipment or piping, a 0 (zero) score shall be given for this aspect
Copyright of Shell Global Solutions (Malaysia) Sdn Bhd
CONFIDENTIAL
10/14/2011
30
15
Years of protection
100% coverage (including field welds); according to the appropriate engineering standards 100% coverage (including field welds); not completely in accordance with the appropriate engineering standards No 100% coverage or unknown; poor or unknown quality
CONFIDENTIAL
10/14/2011
31
CONFIDENCE RATING CRITICALITY VERY LOW LOW MEDIUM HIGH VERY HIGH
EXTREME HIGH MEDIUM HIGH MEDIUM LOW NEGLIGIBLE (review only) STRATEGY STRATEGY 0 0 1
STRATEGY 1
STRATEGY 1 STRATEGY
STRATEGY 2 STRATEGY 3 STRATEGY 2 STRATEGY
10/14/2011
32
16
Initial Action*
* Recommended maximum timing; an analysis should be performed to determine if the work should be completed within a shorter time frame.
CONFIDENTIAL
10/14/2011
33
Equipment shell & nozzles/piping 8": Significan 100% NDE combined with t Delag 100%: 100% delagging of ALL CUI within 6 months possible wet and found susceptible areas: within 1 year* Piping & equipment nozzles 8": 100% delagging: within 1 year* (proceed according to column "Further Results") No significan t CUI found
* 50% of coating/paint protection credit can be applied, Inspection interval starting at the moment the coating/paint protection has ended ** Significant CUI means corrosion damage that requires remedial action.
Copyright of Shell Global Solutions (Malaysia) Sdn Bhd
CONFIDENTIAL
10/14/2011
34
17
Equipment shell & nozzles/piping 8": Significan 100% NDE combined with t Delag 100%: selective delagging of CUI within 1 year possible wet and found susceptible areas: every 6 years* Piping & equipment nozzles 8": 100% delagging of ALL possible wet and susceptible areas : every 6 years* No significan t CUI found
* Inspection interval starting at the moment the coating/paint protection has ended ** Significant CUI means corrosion damage that requires remedial action.
Copyright of Shell Global Solutions (Malaysia) Sdn Bhd
CONFIDENTIAL
10/14/2011
35
VERY LOW
LOW
MEDIUM
HIGH
VERY HIGH
CONFIDENTIAL
10/14/2011
36
18
Initial Action*
CONFIDENTIAL
10/14/2011
37
Cracking found 100% delagging of ALL possible wet and susceptible areas; check coating and perform Eddy Current testing: within 3 months*
No cracking found
100% delagging of ALL wet and susceptible areas; check coating and perform DPI: within 2 years
100% delagging within 3 months; repair & paint; repeat Initial Action: every 5 years* Adjust confidence rating with +0.1; repeat Initial Action: within 3 years
* 50% of coating/paint protection credit can be applied, Inspection interval starting at the moment the coating/paint protection has ended . CONFIDENTIAL 10/14/2011 Copyright of Shell Global Solutions (Malaysia) Sdn Bhd
38
19
CUI PREVENTION
Only insulate where necessary Use screens for personnel protection Use insulating coatings Use waterproof cladding (plastics, laminates) Use immersion coating or TSA Use non-contacting insulation
CONFIDENTIAL
10/14/2011
39
10/14/2011
40
20