Beruflich Dokumente
Kultur Dokumente
Revision Date: Name and Title: Supplier Team Lead: Provide a complete member list with contact information on Contact List Worksheet GM SQE: Supplier Duns: Supplier Name and Location: Supplier is Tier 1 to GM Issue Category: PRR PRTS Other , Specify : CDP Issue Number: Phone: RPN Severity Occurance Detection Original Final
Failure Mode: Effects of Failure Mode: Cause of Failure Mode: Point of Manufacture Tier 1
Drill Deep Why did the Manufacturing System not prevent this Failure Mode M2
**************** **************** ** **************** **************** **Manufacturing System Error Proofing & **************** Standardized Work **************** **
Corrective Action
Verification
Owner
Due Date
M1
M3
Prevent
M4
M5
Quality Assurance
Why did the Quality System not Protect GM from this Failure Mode
M-RC
Q1
Q2
**************** **************** ** **************** **************** Quality System ** Error Detection & ****************Containment **************** **
Protect
Q3
Q4
Q5
Quality Control
Why did the Planning System not Predict this Failure Mode
Q-RC
P1
P2
**************** **************** ** **************** **************** Planning System ** informational content **************** documentation in all **************** **
Predict
P3
P4
P5
Quality Planning
What are the key findings based on this quality issue?
P-RC
B
**************** **************** ** **************** **************** ** **************** **************** **
REV: 10 05/15/06
Page 1 of 9
Print Date:5/4/2012
Failure Mode: Effects of Failure Mode: Cause of Failure Mode: Point of Manufacture Tier 2
Drill Deep Why did the Manufacturing System not prevent this Failure Mode M2
**************** **************** ** **************** **************** **Manufacturing System Error Proofing & **************** Standardized Work **************** **
Corrective Action
Verification
Owner
Due Date
M1
M3
Prevent
M4
M5
Quality Assurance
Why did the Quality System not Protect GM from this Failure Mode
M-RC
Q1
Q2
**************** **************** ** **************** **************** Quality System ** Error Detection & ****************Containment **************** **
Protect
Q3
Q4
Q5
Quality Control
Why did the Planning System not Predict this Failure Mode
Q-RC
P1
P2
**************** **************** ** **************** **************** Planning System ** informational content **************** documentation in all **************** **
Predict
P3
P4
P5
Quality Planning
What are the key findings based on this quality issue?
P-RC
B
**************** **************** ** **************** **************** ** **************** **************** **
REV: 10 05/15/06
Page 2 of 9
Print Date:5/4/2012
Failure Mode: Effects of Failure Mode: Cause of Failure Mode: Point of Manufacture Tier 3
Drill Deep Why did the Manufacturing System not prevent this Failure Mode M2
**************** **************** ** **************** **************** **Manufacturing System Error Proofing & **************** Standardized Work **************** **
Corrective Action
Verification
Owner
Due Date
M1
M3
Prevent
M4
M5
Quality Assurance
Why did the Quality System not Protect GM from this Failure Mode
M-RC
Q1
Q2
**************** **************** ** **************** **************** Quality System ** Error Detection & ****************Containment **************** **
Protect
Q3
Q4
Q5
Quality Control
Why did the Planning System not Predict this Failure Mode
Q-RC
P1
P2
**************** **************** ** **************** **************** Planning System ** informational content **************** documentation in all **************** **
Predict
P3
P4
P5
Quality Planning
What are the key findings based on this quality issue?
P-RC
B
**************** **************** ** **************** **************** ** **************** **************** **
REV: 10 05/15/06
Page 3 of 9
Print Date:5/4/2012
Supplier Name:
Name Title Phone E-mail
Supplier Name:
Supplier Name:
Supplier Name:
Original 126 54 6 3 7
Final 6 3 3
Categoria da emisso(assunto):
Nmero da emisso(assunto):
380033
Modo de Falha: Rebarba no vertice do chanfro interno Efeitos do Modo de Falha: Danos e parada da linha de produo da GM Causa do Modo de Falha: Uso da ferramenta de acabamento das faces at seu completo desgaste Ponto de Manufatura Tier 1
Drill Deep(escavao profunda) Por que o Sistema de Manufatura no fez a preveno desta Rebarba no vertice do chanfro interno M2
************************ **********
M1
Uso da ferramenta de acabamento das faces at seu completo desgaste No existencia de instruo que previsse reao para desgaste de ferramentas Plano decontrole no previa verificao da existencia de rebalba atravs de calibrador PNP
Ao Corretiva estudar vida util das arestas, fazendo trocas preventivas das ferramentas Criao de instruo baseada no estudo citado acima Incluso da verificao 100% da existencia de rebarbas/desvios do furo atravz de calibrador PNP
Prazo 08/01/08
Rodrigo Rocha
08/01/08
M3
100%
M. Contiero
08/23/08
Preveno
M4 M5
M-RC
Qualidade Assegurada
Por que o Sistema de Qualidade no protegeu a GM de Rebarba no vertice do chanfro interno Q2
************************ **********
Q1
Planos de controle das operaes subsequentes no previam verificao especifica de rebarba/desvios no furo.
Verificao 100% com calibrador PNP ser feita proxima aos processos finais de produo
100%
Diogo Fontenele
08/04/08
Proteger
Q3
Q4
Q5
Q-RC
Controle de Qualidade
Por que o Sistema de Planejamento no Preveu isto Rebarba no vertice do chanfro interno P2
************************ **********
P1
N/A
Robson Romero
08/04/08
Prever
P3
P4
P5
Planejamento de Qualidade
Quais so as evidncias(encontradas) chaves baseada nessa assunto de qualidade?
P-RC
REV: 10 05/15/06
Page 6 of 9
Print Date:5/4/2012
Nome do Fornecedor:
Nome do Fornecedor: Lder do Time: Membro do Time: Membro do Time: Membro do Time: Membro do Time: Membro do Time: Rafael Abuhab Silvio Martins Robson Romero Diogo Fontenele Diretor Qualidade Gesto Qualidade Processos Ttulo Telefone 45476700 38366233 45476700 38366233 E-mail rafael.abuhab@forjaf rio.com.br silvio.martins@forjafri o.com.br robson.romero@forja frio.com.br diogo.fontenele@forj afrio.com.br
Srie 2 Fornecedor Lder do Time: Membro do Time: Membro do Time: Membro do Time: Membro do Time: Membro do Time:
Nome do Fornecedor:
Srie 3 Fornecedor Lder do Time: Membro do Time: Membro do Time: Membro do Time: Membro do Time: Membro do Time:
Nome do Fornecedor:
Srie 4 Fornecedor Lder do Time: Team Member: Team Member: Team Member: Team Member: Team Member:
Nome do Fornecedor: