Sie sind auf Seite 1von 61

ANALISA HARGA SATUAN S.N.

I
NO.
A
I
ANALISA 001

URAIAN
B
PEKERJAAN PERSIAPAN
1 m' Pagar Sementara dari Kayu tinggi 2 m
Bahan
Dolken Kayu 8 - 10/400 cm
Semen Portland
Pasir Beton
Koral Beton
Kaso 5 / 7 ( albasiah )
Paku Biasa 2" - 5"
Residu
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor

ANALISA 002

1 m' Pagar Sementara dari Seng Gelombang tinggi 2 m


Bahan
Dolken Kayu 8 - 10/400 cm
Semen Portland
Pasir Beton
Koral Beton
Kaso 5 / 7 ( albasiah )
Paku Biasa 2" - 5"
Meni Besi
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor

ANALISA 003

1 m' Pagar Sementara dari Kawat Duri tinggi 1.8 m


Bahan
Dolken Kayu 8 - 10/400 cm
Semen Portland
Kawat Duri
Pasir Beton
Koral Beton
Paku Biasa 2" - 5"
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor

ANALISA 004

SAT HARGA SAT matrial


D

HARGA SAT upah

JUMLAH matrial

JUMLAH upah

TOTAL harga

G=(CXE)

H = (C X F )

I=(G+H)

0.00
1.250
2.500
0.005
0.009
0.072
0.060
0.400

btg
Kg
m3
m3
m3
Kg
Lt

0.200
0.400
0.020
0.020

Oh
Oh
Oh
Oh

Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Kayu Balok Borneo


Paku
Besi Strip
Semen Portland
Pasir Pasang
Pasir Beton
Koral Beton
Bata merah kelas I
Seng Plat
Jendela Nako
Kaca Polos
Kunci Tanam
Plywood 4 mm
Tenaga
Tukang Kayu
Tukang Batu
Perkerja

Rp
Rp
Rp
Rp
0.00

1.250
2.500
1.200
0.009
0.072
0.060
0.450

btg
Kg
m3
m3
m3
Kg
Lt

0.200
0.400
0.020
0.020

Oh
Oh
Oh
Oh

Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

65,734.00
55,798.00
75,671.00
85,607.00

btg
Kg
Kg
m3
m3
Kg

0.200
0.300
0.020
0.020

Oh
Oh
Oh
Oh

Rp
Rp
Rp
Rp
Rp
Rp

m3
Kg
m3

Rp
Rp
Rp
Rp

0.100
0.100
0.010
0.005

Oh
Oh
Oh
Oh

1.250
0.180
0.850
1.100
35.000
0.150
0.100
0.150
30.000
0.250
2.000
0.080
0.150
0.060

btg
m3
Kg
Kg
Kg
m3
m3
m3
bh
lbr
bh
m2
bh
lbr

2.000
1.000
2.000

Oh
Oh
Oh

Rp
Rp
Rp

65,734.00
55,798.00
75,671.00
85,607.00

13,146.80
22,319.20
1,513.42
1,712.14
33,111.76

33,111.76

13,147
16,739
1,513
1,712
13,337.95

13,337.95

0.00
0.00
0.00
Rp
Rp
Rp
Rp

65,734.00
55,798.00
75,671.00
85,607.00

6,573
5,580
757
428
0.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

38,691.56

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.012
0.020
0.007

13,146.80
22,319.20
1,513.42
1,712.14
38,691.56

Rp
Rp
Rp
Rp
0.00

1.000
2.000
25.000
0.005
0.009
0.060

38,691.56

0.00
0.00
0.00
0.00
0.00
0.00
0.00

1 m Pek. Kantor Direksi Keet , dengan lantai plesteran


Bahan
Dolken Kayu 8 - 10/400 cm

38,691.56

65,734.00
55,798.00
75,671.00
85,607.00

1 m' Pek. Pengukuran kembali (site) & Pemasangan Bowplank


Bahan
Kayu Kaso 5 / 7 (borneo)
Paku Biasa 2" - 5"
Kayu Papan 3 / 20 borneo
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor

ANALISA 005

KOEF

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rp
Rp
Rp

0.00

Kepala Tukang
Mandor
ANALISA 006

Kayu Balok Borneo


Paku
Semen Portland
Pasir Beton
Koral Beton
Seng Gelombang BJLS 32
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor

Kayu Balok Borneo


Paku
Seng Gelombang BJLS 32
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor

ANALISA 009

Membersihkan Lapangan dan Perataan


Tenaga
Perkerja
Mandor

Kayu Balok Borneo


Paku
Semen Portland
Pasir Beton
Koral Beton
Seng Gelombang BJLS 32
Plywood 4 mm
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor

Tali Ijuk
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor
ANALISA 012

btg
m3
Kg
Kg
m3
m3
lbr

2.000
1.000
0.200
0.050

Oh
Oh
Oh
Oh

Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

btg
m3
Kg
lbr

1.500
1.000
0.150
0.050

Oh
Oh
Oh
Oh

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

Oh
Oh

btg
m3
Kg
Kg
m3
m3
lbr
lbr

2.000
1.000
0.200
0.050

Oh
Oh
Oh
Oh

27,500.00
55,000.00

8,800.00
1,815,000.00
34,100.00
1,100.00
215,000.00
275,000.00
60,500.00
42,900.00

m3
Kg
btg

2.000
0.050

Oh
Oh

btg
Kg

2.000
1.000
0.200
0.050

Oh
Oh
Oh
Oh

38,500.00
27,500.00
44,000.00
55,000.00

m3
m3
m3

1.000
0.050

Oh
Oh

1,540,000.00
34,100.00
2,035,000.00
38,500.00
55,000.00

Oh
Oh

79,750.00

2,411,420.00

77,000
2,750

13,200.00
17,600.00

116,050.00

133,650.00

13,200.00
4,400.00
38,500.00
27,500.00
44,000.00
55,000.00

77,000
27,500
8,800
2,750

209,000.00
242,000.00
215,000.00

30,250.00

85,530.00

31,350.00
21,780.00
2,150.00
27,500.00
55,000.00

27,500
2,750
0.00

6.667
0.333

663,535.00

286,440.00
10,230.00
2,035,000.00

1 m Bongkaran Beton Bertulang


Tenaga
Perkerja
Mandor

116,050.00

77,000
27,500
8,800
2,750

55,280.00
0.150
0.090
0.010

5,500.00

11,000.00
337,590.00
10,230.00
19,800.00
6,450.00
13,750.00
90,750.00
57,915.00

17,600.00
1.000
0.250

5,500.00
2,750
2,750

2,331,670.00
0.186
0.300
1.000

0.00

547,485.00
1.250
0.186
0.300
18.000
0.030
0.050
1.500
1.350

0.00

0.00
0.00
0.00
0.00

0.00
0.100
0.050

0.00

0.00

3.000
0.276
0.700
1.500

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

1 m Pembuatan Jalan Sementara


Bahan
Batu Belah 5 / 20
Batu Belah 5 / 7
Pasir Pasang
Tenaga
Perkerja
Mandor

ANALISA 013

1.700
0.210
0.300
10.500
0.030
0.050
1.500

1 m Pembuatan Stegger dari Bambu, ( 40 x 50 x 20 ) cm


Bahan
Bambu 6 - 8 / 600 cm

0.00

1 m Pembuatan Bak Adukan ( 40 x 50 x 20 ) cm


Bahan
Kayu Terentang
Paku
Kayu Kaso 5 / 7 (borneo)
Tenaga
Tukang Kayu
Mandor

ANALISA 011

1 m Pembuatan Bedeng Buruh


Bahan
Dolken Kayu 8 - 10/400 cm

ANALISA 010

Rp
Rp

1 m Pembuatan Rumah Jaga / Konstruksi Kayu


Bahan
Dolken Kayu 8 - 10/400 cm

ANALISA 008

Oh
Oh

1 m Pembuatan Gudang Semen dan Alat - alat


Bahan
Dolken Kayu 8 - 10/400 cm

ANALISA 007

0.300
0.050

27,500.00
55,000.00

201,657.50
183,343
18,315

201,657.50

ANALISA 014

1 m Bongkaran Dinding Tembok Bata Merah


Tenaga
Perkerja
Mandor

II
ANALISA 015

ANALISA 016

ANALISA 017

ANALISA 018

ANALISA 019

ANALISA 020

ANALISA 021

PEKERJAAN TANAH
1 m3 Pek. Galian Tanah Biasa Max Kedalaman 1 m'
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
1 m3 Pek. Galian Tanah Biasa Max Kedalaman 2 m'
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
1 m3 Pek. Galian Tanah Biasa Max Kedalaman 3 m'
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
1 m3 Pek. Galian Tanah Keras Max Kedalaman 1 m'
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor

ANALISA 024

ANALISA 025

Oh
Oh

27,500.00
55,000.00

0.400

0.040

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00

0.052

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00

1 m3 Pek. Galian Tanah Lumpur Max Kedalaman 1 m'


Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor

0.823
0.083

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00

27,500.00
33,000.00
44,000.00
55,000.00

1 m Pembuangan Tanah sejauh 150 m

1 m3 Urugan Tanah Kembali


Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
1 m3 Pemadatan tanah
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
1 m3 Pek. Urugan Pasir
Bahan
Pasir Urug
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00

m3

0.300
0.010

Oh
Oh
Oh
Oh

88,000.00

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

105,600.00
27,500.00
33,000.00
44,000.00
55,000.00

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

13,750
#VALUE!
#VALUE!
2,750
105,600.00

1.200

#VALUE!

5,280
#VALUE!
#VALUE!
1,045
0.00

0.500
0.050

#VALUE!

5,280
#VALUE!
#VALUE!
2,750
0.00

0.192
0.019

#VALUE!

1,375
#VALUE!
#VALUE!
275
0.00

0.192
0.050

#VALUE!

22,633
#VALUE!
#VALUE!
4,565
0.00

Oh
Oh
Oh
Oh

17,297.50

34,375
#VALUE!
#VALUE!
6,875
0.00

0.050
0.005

17,297.50

17,188
#VALUE!
#VALUE!
3,410
0.00

1 m Pek. Stripping 1 m

13,200.00

20,213
#VALUE!
#VALUE!
4,015
0.00

0.625
0.062

13,200.00

14,438
2,860
0.00

0.735
0.073

185,157.50

11,000
2,200
0.00

0.525

185,157.50
183,343
1,815

0.00

1.250
0.125

Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
ANALISA 023

6.667
0.033

1 m3 Pek. Galian Tanah Cadas Max Kedalaman 1 m'


Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor

Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
ANALISA 022

0.00

8,250
#VALUE!
#VALUE!
550

#VALUE!

ANALISA 026

III
ANALISA 027

1 m3 Pemasangan Lapisan ijuk


Bahan
Ijuk
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor

ANALISA 029

IV
ANALISA 030

ANALISA 031

ANALISA 032

1.200

m3

0.150
0.015

Oh
Oh
Oh
Oh

16,500.00
27,500.00
33,000.00
44,000.00
55,000.00

1 m3 Pasangan Batu kali 1 Pc : 3Ps


Bahan
Batu Belah 15 / 20
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m3 Pasangan Batu kali 1 Pc : 5Ps
Bahan
Batu Belah 15 / 20
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
PEKERJAAN DINDING
1 m2 Pasangan Bata Merah 1Pc : 3Ps 1 Bata
Bahan
Bata merah kelas I
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Pasangan Bata Merah 1Pc : 5Ps 1 Bata
Bahan
Bata merah kelas I
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Pasangan Bata Merah 1Pc : 3Ps 1/2 Bata
Bahan
Bata merah kelas I
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

m3
m3
m3
Kg
Kg
Kg
m3
Kg
lt
Kg

0.800
0.500
0.050
0.040

Oh
Oh
Oh
Oh

35,750.00
215,000.00
275,000.00
1,100.00
16,000.00
21,450.00
2,035,000.00
34,100.00
4,950.00
19,800.00

m3
Kg
m3

1.500
0.600
0.060
0.075

Oh
Oh
Oh
Oh

1.100
136.000
0.544

m3
Kg
m3

1.500
0.600
0.060
0.075

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

192,500.00
1,100.00
215,000.00

0.650
0.200
0.020
0.030

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

bh
Kg
m3

0.650
0.200
0.020
0.030

Oh
Oh
Oh
Oh

192,500.00
1,100.00
215,000.00

bh
Kg
m3

0.320
0.100
0.010
0.015

Oh
Oh
Oh
Oh

69,465.00

547,775.00

211,750.00
149,600.00
116,960.00
27,500.00
35,750.00
44,000.00
55,000.00

41,250
21,450
2,640
4,125

605.00
1,100.00
215,000.00

27,555.00

168,065.00

84,700.00
36,245.00
19,565.00
27,500.00
35,750.00
44,000.00
55,000.00

17,875
7,150
880
1,650

605.00
1,100.00
215,000.00

27,555.00

158,605.00

84,700.00
24,420.00
21,930.00
27,500.00
35,750.00
44,000.00
55,000.00

17,875
7,150
880
1,650
66,757.00

70.000
14.370
0.040

779,925.00

41,250
21,450
2,640
4,125

131,050.00
140.000
22.200
0.102

69,465.00

211,750.00
431,200.00
67,510.00

140,510.00
bh
Kg
m3

1,275,284.50

22,000
17,875
2,200
2,200

478,310.00

140.000
32.950
0.091

44,275.00

572.00
17,200.00
34,375.00
53,900.00
552,000.00
15,015.00
549,450.00
4,092.00
445.50
3,960.00

710,460.00
1.100
392.000
0.314

#VALUE!

4,125
#VALUE!
#VALUE!
825

1,231,009.50
0.016
0.080
0.125
49.000
34.500
0.700
0.270
0.120
0.090
0.200

#VALUE!

19,800.00

PEKERJAAN PONDASI
1 m' Pembuatan Tiang Pancang ( 35 x 35 ) cm, Beton Bertulang
Bahan
Pasir Urug Darat
Pasir Beton
Koral Beton
Semen Portland
Besi Beton
Kawat Beton
Kayu Kaso 5 / 7 (borneo)
Paku
Minyak Bekisting
Plamuur Tembok
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 028

19,800.00

605.00
1,100.00
215,000.00

13,640.00

42,350.00
15,807.00
8,600.00
27,500.00
35,750.00
44,000.00
55,000.00

8,800
3,575
440
825

80,397.00

ANALISA 033

V
ANALISA 032

ANALISA 033

ANALISA 034

ANALISA 035

ANALISA 036

ANALISA 037

ANALISA 038

1 m2 Pasangan Bata Merah 1Pc : 5Ps 1/2 Bata


Bahan
Bata merah kelas I
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
PEKERJAAN PELESTERAN
1 m2 Plesteran Dinding 1Pc : 3Ps
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Plesteran Dinding 1Pc : 5Ps
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Plesteran Dinding 1Pc : 0. 5Kp : 3 Ps, tebal 15 mm
Bahan
Semen Portland
Kapur Padam
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Plesteran Dinding 1Pc : 3Kp : 10Ps, tebal 15 mm
Bahan
Semen Portland
Kapur Padam
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Plesteran 0.5Pc : 1Kp : 4Ps, tebal 15 mm
Bahan
Semen Portland
Kapur Padam
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Plesteran 1Kp : 1 Sm : 1Ps, tebal 15 mm
Bahan
Semen Merah
Kapur Padam
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Plesteran 1Kp : 1 Sm : 2Ps, tebal 15 mm
Bahan
Semen Merah
Kapur Padam
Pasir Pasang
Tenaga
Perkerja

62,673.00
70.000
9.680
0.045

bh
Kg
m3

0.320
0.100
0.010
0.015

Oh
Oh
Oh
Oh

6.480
0.019

Kg
m3

0.200
0.150
0.015
0.010

Oh
Oh
Oh
Oh

4.320
0.022

Kg
m3

0.200
0.150
0.015
0.010

Oh
Oh
Oh
Oh

605.00
1,100.00
215,000.00
27,500.00
35,750.00
44,000.00
55,000.00

8,800
3,575
440
825

1,100.00
215,000.00
27,500.00
35,750.00
44,000.00
55,000.00

Oh
Oh
Oh
Oh

1,100.00
215,000.00

Kg
m3
m3

0.200
0.150
0.015
0.010

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

Kg
m3
m3

0.200
0.150
0.015
0.010

Oh
Oh
Oh
Oh

1,100.00
176,000.00
215,000.00

Kg
m3
m3

0.200
0.150
0.015
0.010

Oh
Oh
Oh
Oh

0.007
0.007
0.015

Kg
m3
m3

0.200

Oh

12,072.50

20,147.50

4,752.00
528.00
2,795.00
27,500.00
35,750.00
44,000.00
55,000.00

5,500
5,363
660
550

1,100.00
176,000.00
215,000.00

12,072.50

18,162.50

2,024.00
1,056.00
3,010.00
27,500.00
35,750.00
44,000.00
55,000.00

5,500
5,363
660
550

1,100.00
176,000.00
215,000.00

12,072.50

20,337.50

3,300.00
880.00
4,085.00
27,500.00
35,750.00
44,000.00
55,000.00

5,500
5,363
660
550
3,529.89

0.009
0.009
0.009

21,554.50

5,500
5,363
660
550

8,265.00
3.000
0.005
0.019

12,072.50

4,752.00
4,730.00

6,090.00
1.840
0.006
0.014

23,285.50

5,500
5,363
660
550

8,075.00

0.200
0.150
0.015
0.010

12,072.50

7,128.00
4,085.00

9,482.00

Kg
m3
m3

76,313.00

42,350.00
10,648.00
9,675.00

11,213.00

4.320
0.003
0.013

13,640.00

1,210.00
176,000.00
215,000.00

12,072.50

15,602.39

10.89
1,584.00
1,935.00
27,500.00
35,750.00
44,000.00
55,000.00

5,500
5,363
660
550
4,465.47

1,210.00
176,000.00
215,000.00

12,072.50

8.47
1,232.00
3,225.00
27,500.00

5,500

16,537.97

Tukang Batu
Kepala Tukang
Mandor
ANALISA 039

ANALISA 040

ANALISA 041

ANALISA 042
7.29

ANALISA 043

ANALISA 044

ANALISA 045

ANALISA 046

1 m2 Plesteran 1Pc : 2 Ps, tebal 20 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Plesteran 1Pc : 3 Ps, tebal 20 mm
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Plesteran 1Pc : 4Ps, tebal 20 mm
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Plesteran 1Pc : 5Ps, tebal 20 mm
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Plesteran 1Pc : 6Ps, tebal 20 mm
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Plesteran 1Kp : 1 Sm : 2Ps, tebal 15 mm
Bahan
Semen Merah
Kapur Padam
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Plesteran 1Pc : 2Ps, tebal 25 mm
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Plesteran 1Pc : 3Ps, tebal 25 mm
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.150
0.015
0.010

Oh
Oh
Oh

14.280
0.023

Kg
m3

0.250
0.200
0.020
0.0125

Oh
Oh
Oh
Oh

10.800
0.026

Kg
m3

0.250
0.200
0.020
0.0125

Oh
Oh
Oh
Oh

35,750.00
44,000.00
55,000.00

5,363
660
550
20,653.00

1,100.00
215,000.00
27,500.00
35,750.00
44,000.00
55,000.00

1,100.00
215,000.00

0.250
0.200
0.020
0.0125

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

Kg
m3

0.250
0.200
0.020
0.0125

Oh
Oh
Oh
Oh

1,100.00
215,000.00

Kg
m3

0.250
0.200
0.020
0.0125

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

Kg
m3
m3

0.250
0.200
0.020
0.0125

Oh
Oh
Oh
Oh

1,100.00
215,000.00

Kg
m3

0.300
0.200
0.020
0.013

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

Kg
m3

0.300
0.200
0.020
0.013

Oh
Oh
Oh
Oh

29,631.50

6,875
7,150
880
688

1,100.00
215,000.00

15,592.50

28,906.50

6,864.00
6,450.00
27,500.00
35,750.00
44,000.00
55,000.00

6,875
7,150
880
688

1,210.00
176,000.00
215,000.00

15,592.50

21,057.39

10.89
1,584.00
3,870.00
27,500.00
35,750.00
44,000.00
55,000.00

6,875
7,150
880
688

1,100.00
215,000.00

16,995.00

36,840.00

17,050.00
2,795.00
27,500.00
35,750.00
44,000.00
55,000.00

8,250
7,150
880
715
20,450.00

11.750
0.035

15,592.50

8,019.00
6,020.00

19,845.00
15.500
0.013

31,160.50

6,875
7,150
880
688

5,464.89
0.009
0.009
0.018

15,592.50

9,548.00
6,020.00

13,314.00
6.240
0.030

33,062.50

6,875
7,150
880
688

14,039.00
7.290
0.028

15,592.50

11,880.00
5,590.00

15,568.00
Kg
m3

36,245.50

6,875
7,150
880
688
17,470.00

8.680
0.028

15,592.50

15,708.00
4,945.00

1,100.00
215,000.00

16,995.00

12,925.00
7,525.00
27,500.00
35,750.00
44,000.00
55,000.00

8,250
7,150
880
715

37,445.00

ANALISA 047

ANALISA 048

ANALISA 049

ANALISA 050

ANALISA 051

ANALISA 052

ANALISA 053

ANALISA 054

ANALISA 055

1 m2 Plesteran 1Pc : 4Ps, tebal 25 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Plesteran 1Pc : 5Ps, tebal 25 mm
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Plesteran 1Pc : 2Ps, tebal 30 mm
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Plesteran 1Pc : 3Ps, tebal 30 mm
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Plesteran 1Pc : 4Ps, tebal 30 mm
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Plesteran 1Pc : 5Ps, tebal 30 mm
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Berapen 1Pc : 3Ps, tebal 30 mm
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Berapen 1Pc : 5Ps, tebal 15 mm
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Pelesteran Beton 1Pc : 2Ps, tebal 15 mm
Bahan
Semen Portland

18,598.00
9.480
0.038

Kg
m3

0.300
0.200
0.020
0.013

Oh
Oh
Oh
Oh

1,100.00
215,000.00

Kg
m3

0.300
0.200
0.020
0.013

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

8,250
7,150
880
715

1,100.00
215,000.00

Kg
m3

0.320
0.250
0.025
0.015

Oh
Oh
Oh
Oh

14.150
0.039

Kg
m3

0.320
0.250
0.025
0.015

Oh
Oh
Oh
Oh

11.380
0.042

Kg
m3

0.320
0.250
0.025
0.015

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

1,100.00
215,000.00
27,500.00
35,750.00
44,000.00
55,000.00

Oh
Oh
Oh
Oh

1,100.00
215,000.00

Kg
m3

0.150
0.070
0.007
0.008

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

Kg
m3

0.150
0.070
0.007
0.008

Oh
Oh
Oh
Oh

1,100.00
215,000.00

Kg

27,500.00
35,750.00
44,000.00
55,000.00

1,100.00
215,000.00

41,210.50

8,800
8,938
1,100
825
19,662.50

38,346.50

9,009.00
9,675.00
27,500.00
35,750.00
44,000.00
55,000.00

1,100.00
215,000.00

8,800
8,938
1,100
825
7,375.50

19,667.50

7,777.00
4,515.00
27,500.00
35,750.00
44,000.00
55,000.00

1,100.00
215,000.00

4,125
2,503
308
440
7,375.50

18,557.50

6,237.00
4,945.00
27,500.00
35,750.00
44,000.00
55,000.00

1,100.00

19,662.50

12,518.00
9,030.00

4,125
2,503
308
440
14,100.00

9.300

43,612.50

8,800
8,938
1,100
825

11,182.00
5.670
0.023

19,662.50

15,565.00
8,385.00

12,292.00
7.070
0.021

47,702.50

8,800
8,938
1,100
825

18,684.00

0.320
0.250
0.025
0.015

19,662.50

20,515.00
7,525.00

21,548.00

Kg
m3

34,114.00

8,250
7,150
880
715

23,950.00

8.190
0.045

16,995.00

8,734.00
8,385.00

28,040.00
18.650
0.035

35,593.00

10,428.00
8,170.00

17,119.00
7.940
0.039

16,995.00

10,230.00

15,895.00

29,995.00

Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
ANALISA 056

ANALISA 057

ANALISA 058

ANALISA 059

ANALISA 060

ANALISA 061

ANALISA 062

ANALISA 063

1 m2 Pelesteran Beton 1Pc : 3Ps, tebal 15 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Pelesteran Skoring 1Pc : 2Ps
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Pelesteran Granito 1Pc Warna : 2 Granito, tebal 10 mm
Bahan
PC Warna
Batu Granito
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Pelesteran Teraso 1Pc Warna : 2 Batu Teraso, tebal 10 mm
Bahan
PC Warna
Batu Teraso
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Pelesteran Ciprat 1 Pc : 2 Ps
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Pelesteran Siar Adukan 1 Pc : 2 Ps
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Pelesteran Waterfroof Batacote 3 lapis
Bahan
Semen Portland
Batacote
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Plesteran Dinding 1 : 3 + ACIAN
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja

0.018

m3

0.260
0.200
0.020
0.013

Oh
Oh
Oh
Oh

215,000.00

3,870.00
27,500.00
35,750.00
44,000.00
55,000.00

7,150
7,150
880
715
12,292.00

7.070
0.021

Kg
m3

0.260
0.200
0.020
0.013

Oh
Oh
Oh
Oh

1,100.00
215,000.00

Kg
m3

0.057
0.038
0.038
0.002

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

7,150
7,150
880
715

1,100.00
215,000.00

Kg
Kg

0.050
0.020
0.002
0.005

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

Kg
Kg

0.450
0.200
0.020
0.025

Oh
Oh
Oh
Oh

1,320.00
22,000.00

Kg
m3

0.250
0.100
0.010
0.015

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

Kg
m3

0.150
0.070
0.007
0.008

Oh
Oh
Oh
Oh

0.500
2.900
0.006

Kg
Kg
m3

0.300
0.200
0.020
0.015

Oh
Oh
Oh
Oh

1,320.00
17,600.00
27,500.00
35,750.00
44,000.00
55,000.00

0.2250

org

224,760.80

12,375
7,150
880
1,375

1,100.00
215,000.00

11,715.00

19,907.00

4,752.00
3,440.00
27,500.00
35,750.00
44,000.00
55,000.00

6,875
3,575
440
825

1,100.00
215,000.00

7,375.50

15,567.50

4,752.00
3,440.00
27,500.00
35,750.00
44,000.00
55,000.00

4,125
2,503
308
440

1,100.00
19,800.00
215,000.00

17,105.00

76,365.00

550.00
57,420.00
1,290.00
27,500.00
35,750.00
44,000.00
55,000.00

8,250
7,150
880
825
14,390.00

kg
m3

21,780.00

580.80
202,400.00

59,260.00

8.0000
0.0260

332,643.08

1,375
715
88
275

8,192.00
4.320
0.016

2,453.00

190.08
330,000.00

8,192.00
4.320
0.016

5,688.00

1,568
1,359
1,672
110

202,980.80
0.440
11.500

4,708.00

550.00
430.00

330,190.08
0.144
15.000

28,187.00

7,777.00
4,515.00

980.00
0.500
0.002

15,895.00

1,100.00
215,000.00

12,519.38

26,909.38

6,188

0.00

8,800.00
5,590.00
27,500.00

Tukang Batu
Kepala Tukang
Mandor
1 m2 Plesteran Dinding 1 : 5 + ACIAN
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
III

0.1525
0.0100
0.0080

org
org
org

5.4000
0.0280

kg
m3

0.2250
0.1525
0.0100
0.0080

org
org
org
org

35,750.00
44,000.00
55,000.00
11,960.00
1,100.00
215,000.00
27,500.00
35,750.00
44,000.00
55,000.00

30,250,000.00
1.100

m3

6.000
20.000
2.000
0.300

Oh
Oh
Oh
Oh

27,500,000.00
27,500.00
38,500.00
44,000.00
55,000.00

m3

6.000
18.000
2.000
0.300

Oh
Oh
Oh
Oh

1,815,000.00
27,500.00
38,500.00
44,000.00
55,000.00

m3

6.000
18.000
2.000
0.300

Oh
Oh
Oh
Oh

2,035,000.00
27,500.00
38,500.00
44,000.00
55,000.00

m3
Kg

0.350
1.050
0.105
0.018

Oh
Oh
Oh
Oh

2,035,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

m3
Kg

0.350
1.050
0.105
0.018

Oh
Oh
Oh
Oh

2,035,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

m3

1.000
2.500
0.250
0.050

Oh
Oh
Oh
Oh

27,500,000.00
27,500.00
38,500.00
44,000.00
55,000.00

m3

1.000
2.500
0.250
0.050

Oh
Oh
Oh
Oh

2,035,000.00

Bahan
Papan Kayu Jati
Tenaga

m3

27,500,000.00

130,625.00

137,500.00

1,512,500.00

137,500.00

218,900.00

27,500
96,250
11,000
2,750
962,500.00

0.035

55,660.00

81,400.00
27,500.00
38,500.00
44,000.00
55,000.00

1m Pasang Pintu dan Jendela Kaca Kayu Jati

130,625.00

27,500
96,250
11,000
2,750
81,400.00

0.040

55,660.00

1,375,000.00

1m Pasang Pintu Panel Kayu Kamper


Bahan
Papan Kayu Kamper
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

3,404,500.00

9,625
40,425
4,620
990
1,375,000.00

0.050

962,500.00

73,260.00
1,705.00

1m Pasang Pintu Panel Kayu Jati


Bahan
Papan Kayu Jati
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

3,140,500.00

9,625
40,425
4,620
990
74,965.00

0.036
0.050

962,500.00

73,260.00
1,705.00

1m Pasang Pintu Klamp Kayu Borneo


Bahan
Papan Kayu Borneo
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

31,289,500.00

165,000
693,000
88,000
16,500
74,965.00

0.036
0.050

1,039,500.00

2,442,000.00

1m Pasang Pintu Klamp Kayu Kamper


Bahan
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

0.00
0.00
0.00
0.00

165,000
693,000
88,000
16,500
2,442,000.00

1.200

6,188
5,452
440
440

2,178,000.00

1m Pasang Kusen Pintu dan Jendela Kayu Damar Laut


Bahan
Kayu Balok Damar Laut
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

24,479.38

165,000
770,000
88,000
16,500
2,178,000.00

1.200

12,519.38

30,250,000.00

1m Pasang Kusen Pintu dan Jendela Kayu Borneo


Bahan
Kayu Balok Borneo
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

0.00
0.00
0.00

5,940.00
6,020.00

PEKERJAAN KAYU
1m Pasang Kusen Pintu dan Jendela Kayu Jati
Bahan
Kayu Balok Jati
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

5,452
440
440

962,500.00

110,000.00

1,072,500.00

Perkerja
Tukang Kayu
Kepala Tukang
Mandor

0.800
2.000
0.200
0.040

Oh
Oh
Oh
Oh

0.035

m3

0.800
2.000
0.200
0.040

Oh
Oh
Oh
Oh

0.035

m3

0.800
2.000
0.200
0.040

Oh
Oh
Oh
Oh

0.064

m3

1.000
3.000
0.300
0.300

Oh
Oh
Oh
Oh

0.064

m3

1.000
3.000
0.300
0.500

Oh
Oh
Oh
Oh

0.0196
0.030
0.300
1.000

m3
Kg
Lt
Lbr

0.600
2.000
0.200
0.030

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

1m Pasang Pintu dan Jendela Kaca Kayu Kamper


Bahan
Papan Kayu Kamper
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

71,225.00
2,035,000.00
27,500.00
38,500.00
44,000.00
55,000.00

27,500.00
38,500.00
44,000.00
55,000.00

Lem Kayu
Plywood 4 mm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

27,500.00
38,500.00
44,000.00
55,000.00

2,035,000.00

Lem Kayu
Plywood 4 mm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

27,500.00
38,500.00
44,000.00
55,000.00

Oh
Oh
Oh
Oh

27,500,000.00
34,100.00
9,900.00
42,900.00
27,500.00
38,500.00
44,000.00
55,000.00

0.0600
0.150

m3
Kg

0.500
2.000
0.200
0.025

Oh
Oh
Oh
Oh

27,500,000.00
34,100.00
9,900.00
42,900.00
27,500.00
38,500.00
44,000.00
55,000.00

0.0600
0.150

m3
Kg

0.500
2.000
0.200
0.025

Oh
Oh
Oh
Oh

689,843.00

16,500
77,000
8,800
1,650

27,500,000.00
34,100.00

100,925.00

1,756,040.00

1,650,000.00
5,115.00
27,500.00
38,500.00
44,000.00
55,000.00

13,750
77,000
8,800
1,375
1,655,115.00

Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

103,950.00

539,000.00
1,023.00
2,970.00
42,900.00

1m Pasang Jalusi Mati Kusen Kayu Kamper


Bahan
Papan Kayu Jati
Paku Biasa " - 1"

689,843.00

16,500
77,000
8,800
1,650

1,655,115.00

Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

103,950.00

539,000.00
1,023.00
2,970.00
42,900.00

1m Pasang Jalusi Mati Kusen Kayu Jati


Bahan
Papan Kayu Jati
Paku Biasa " - 1"

313,940.00

27,500
115,500
13,200
27,500

585,893.00

0.600
2.000
0.200
0.030

183,700.00

130,240.00

585,893.00

m3
Kg
Lt
Lbr

302,940.00

27,500
115,500
13,200
16,500
130,240.00

0.0196
0.030
0.300
1.000

172,700.00

130,240.00

1m Pasang Pintu Plywood rangkap, rangka kayu Kamper


Bahan
Papan Kayu Jati
Paku Biasa " - 1"

181,225.00

22,000
77,000
8,800
2,200
130,240.00

2,035,000.00

1m Pasang Pintu Plywood rangkap, rangka kayu Jati


Bahan
Papan Kayu Jati
Paku Biasa " - 1"

110,000.00

71,225.00

1m Pasang Pintu dan Jendela Jalusi Kayu Kamper


Bahan
Papan Kayu Borneo
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

181,225.00

22,000
77,000
8,800
2,200
71,225.00

2,035,000.00

1m Pasang Pintu dan Jendela Jalusi Kayu Borneo


Bahan
Papan Kayu Borneo
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

110,000.00

71,225.00

1m Pasang Pintu dan Jendela Kaca Kayu Borneo


Bahan
Papan Kayu Borneo
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

22,000
77,000
8,800
2,200

27,500,000.00
34,100.00

100,925.00

1,650,000.00
5,115.00
27,500.00
38,500.00
44,000.00
55,000.00

13,750
77,000
8,800
1,375

1,756,040.00

1m Pasang Pintu Plywood Rangkap, rangka Kayu Borneo


Bahan
Papan Kayu Borneo
Paku Biasa " - 1"
Lem Kayu
Plywood 4 mm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

86,779.00
0.0196
0.030
0.300
1.000

m3
Kg
Lt
lbr

0.600
2.000
0.200
0.030

Oh
Oh
Oh
Oh

0.0196
0.300
0.300
1.000

m3
Kg
Lt
lbr

0.600
2.000
0.200
0.030

Oh
Oh
Oh
Oh

2,035,000.00
34,100.00
9,900.00
42,900.00

Lem Kayu
Plywood 4 mm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

27,500.00
38,500.00
44,000.00
55,000.00

Lem Kayu
Plywood 4 mm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

27,500.00
38,500.00
44,000.00
55,000.00

m3
Kg
Lt
lbr

0.600
2.000
0.200
0.030

Oh
Oh
Oh
Oh

27,500,000.00
34,100.00
9,900.00
42,900.00

Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

m3
Kg
Lt
lbr
lbr

0.800
2.500
0.250
0.040

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

0.0196
0.300
0.800
1.000
0.500

m3
Kg
Lt
lbr
lbr

0.800
2.500
0.250
0.040

Oh
Oh
Oh
Oh

27,500,000.00
34,100.00
9,900.00
42,900.00
66,000.00

Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

m3
Kg
Lt
lbr
lbr

0.800
2.500
0.250
0.040

Oh
Oh
Oh
Oh

Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga

0.0196
0.300
0.800
0.500
0.500

27,500.00
38,500.00
44,000.00
55,000.00

27,500,000.00
34,100.00
9,900.00
42,900.00
66,000.00

265,386.00

131,450.00

764,500.00

539,000.00
10,230.00
7,920.00
42,900.00
33,000.00
27,500.00
38,500.00
44,000.00
55,000.00

27,500,000.00
34,100.00
9,900.00
42,900.00
66,000.00

131,450.00

22,000
96,250
11,000
2,200

22,000
96,250
11,000
2,200
611,600.00

m3
Kg
Lt
lbr
lbr

764,500.00

39,886.00
10,230.00
7,920.00
42,900.00
33,000.00

633,050.00
0.0196
0.300
0.800
1.000
0.500

131,450.00

22,000
96,250
11,000
2,200
133,936.00

2,035,000.00
34,100.00
9,900.00
42,900.00
66,000.00

1m Pasang Pintu Teakwood & Formika, rangka Kayu Kamper ( divernis )


Bahan
Papan Kayu Jati
Paku Biasa " - 1"

16,500
77,000
8,800
1,650

27,500.00
38,500.00
44,000.00
55,000.00

1m Pasang Pintu Teakwood & Formika, rangka Kayu Jati


Bahan
Papan Kayu Jati
Paku Biasa " - 1"

699,050.00

539,000.00
10,230.00
7,920.00
42,900.00
33,000.00

1m Pasang Pintu Plywood & Formika, rangka Kayu Kamper


Bahan
Papan Kayu Kamper
Paku Biasa " - 1"

103,950.00

539,000.00
10,230.00
2,970.00
42,900.00

633,050.00
0.0196
0.300
0.800
1.000
0.500

699,050.00

16,500
77,000
8,800
1,650
595,100.00

0.0196
0.300
0.300
1.000

103,950.00

539,000.00
10,230.00
2,970.00
42,900.00

1m Pasang Pintu Plywood & Formika, rangka Kayu Jati


Bahan
Papan Kayu Jati
Paku Biasa " - 1"

16,500
77,000
8,800
1,650
595,100.00

27,500,000.00
34,100.00
9,900.00
42,900.00

1m Pasang Pintu Teakwood Rangkap, rangka Kayu Kamper


Bahan
Papan Kayu Jati
Paku Biasa " - 1"

190,729.00

39,886.00
1,023.00
2,970.00
42,900.00

1m Pasang Pintu Teakwood Rangkap, rangka Kayu Jati


Bahan
Papan Kayu Jati
Paku Biasa " - 1"

103,950.00

539,000.00
10,230.00
7,920.00
21,450.00
33,000.00

131,450.00

743,050.00

Perkerja
Tukang Kayu
Kepala Tukang
Mandor

0.800
2.500
0.250
0.040

Oh
Oh
Oh
Oh

0.0196
0.300
1.200
1.000
1.000

m3
Kg
Lt
lbr
lbr

1.000
2.600
0.260
0.050

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

1m Pasang Pintu Formika Double, rangka Kayu Jati


Bahan
Papan Kayu Jati
Paku Biasa " - 1"
Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

670,010.00
27,500,000.00
34,100.00
9,900.00
42,900.00
66,000.00
27,500.00
38,500.00
44,000.00
55,000.00

Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

m3
Kg
Lt
lbr
lbr

1.000
2.600
0.260
0.050

Oh
Oh
Oh
Oh

1.100
15.000
0.800

m3

4.000
12.000
1.200
0.200

Oh
Oh
Oh
Oh

2,035,000.00
34,100.00
9,900.00
42,900.00
66,000.00
27,500.00
38,500.00
44,000.00
55,000.00

27,500,000.00
11,550.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

m3
Kg
Kg

4.000
12.000
1.200
0.200

Oh
Oh
Oh
Oh

1,650,000.00
11,550.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

m3
Kg
Kg

4.000
12.000
1.200
0.200

Oh
Oh
Oh
Oh

1,600,000.00
11,550.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

m3
Kg
Kg

4.000
12.000
1.200
0.200

Oh
Oh
Oh
Oh

1,485,000.00
11,550.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

m3
Kg

0.100
0.100
0.010
0.005

Oh
Oh
Oh
Oh

2,469,830.00

110,000
462,000
52,800
11,000
24,915.00

0.012
0.150

635,800.00

1,633,500.00
173,250.00
27,280.00

1m Pasang Kaso + Reng Genteng Kodok Kayu Kamper


Bahan
Balok Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

2,596,330.00

110,000
462,000
52,800
11,000
1,834,030.00

1.100
15.000
0.800

635,800.00

1,760,000.00
173,250.00
27,280.00

1m3 Pasang Konstruksi Kuda - kuda Kayu Kruing


Bahan
Balok Kayu Kruing
Besi Strip
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

2,651,330.00

110,000
462,000
52,800
11,000
1,960,530.00

1.100
15.000
0.800

635,800.00

1,815,000.00
173,250.00
27,280.00

1m3 Pasang Konstruksi Kuda - kuda Kayu Borneo


Bahan
Balok Kayu Borneo
Besi Strip
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

31,086,330.00

110,000
462,000
52,800
11,000
2,015,530.00

1.100
15.000
0.800

635,800.00

30,250,000.00
173,250.00
27,280.00

1m3 Pasang Konstruksi Kuda - kuda Kayu Kamper


Bahan
Balok Kayu Kamper
Besi Strip
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

312,686.00

27,500
100,100
11,440
2,750
30,450,530.00

Kg

141,790.00

39,886.00
10,230.00
11,880.00
42,900.00
66,000.00

1m3 Pasang Konstruksi Kuda - kuda Kayu Jati


Bahan
Balok Kayu Jati
Besi Strip
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

811,800.00

27,500
100,100
11,440
2,750
170,896.00

0.0196
0.300
1.200
1.000
1.000

141,790.00

539,000.00
10,230.00
11,880.00
42,900.00
66,000.00

1m Pasang Pintu Formika Double, rangka Kayu Kamper


Bahan
Papan Kayu Kamper
Paku Biasa " - 1"

22,000
96,250
11,000
2,200

1,650,000.00
34,100.00

7,315.00

19,800.00
5,115.00
27,500.00
38,500.00
44,000.00
55,000.00

2,750
3,850
440
275

32,230.00

1m Pasang Kaso + Reng Genteng Kodok Kayu Borneo


Bahan
Balok Kayu Borneo
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

24,315.00
0.012
0.150

m3
Kg

0.100
0.100
0.010
0.005

Oh
Oh
Oh
Oh

1,600,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

m3
Kg

0.100
0.100
0.010
0.005

Oh
Oh
Oh
Oh

27,500,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

m3
Kg

0.100
0.100
0.010
0.005

Oh
Oh
Oh
Oh

0.014
0.150

m3
Kg

0.100
0.100
0.010
0.005

Oh
Oh
Oh
Oh

0.165
0.200

m3
Kg

0.120
0.120
0.012
0.006

Oh
Oh
Oh
Oh

1,650,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

27,500.00
38,500.00
44,000.00
55,000.00

1,650,000.00
34,100.00

0.120
0.120
0.012
0.006

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

1,650,000.00
34,100.00

1m' Pasang papan ruiter ( 3 x 20 )cm Kayu Borneo


Bahan
Kayu Papan 3 / 20 borneo
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

27,500.00
38,500.00
44,000.00
55,000.00

m3
Kg

0.150
0.250
0.025
0.075

Oh
Oh
Oh
Oh

27,500,000.00
34,100.00

m3
Kg

0.100
0.200
0.025
0.005

Oh
Oh
Oh
Oh

m3

2,035,000.00
34,100.00

352,385.00

11,825.00

28,182.00

14,652.00
1,705.00
27,500.00
38,500.00
44,000.00
55,000.00

1,650,000.00

18,975.00

4,125
9,625
1,100
4,125

2,750
7,700
1,100
275
23,210.00

0.012

287,848.00

330,000.00
3,410.00

16,357.00
0.0072
0.050

8,778.00

3,300
4,620
528
330

27,500.00
38,500.00
44,000.00
55,000.00

1m Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Kamper


Bahan
Balok Kayu Kamper

3,300
4,620
528
330

333,410.00
0.012
0.100

287,848.00

272,250.00
6,820.00

1m Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Jati


Bahan
Balok Kayu Jati
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

8,778.00

272,250.00
6,820.00

279,070.00
m3
Kg

34,830.00

2,750
3,850
440
275
279,070.00

0.165
0.200

7,315.00

22,400.00
5,115.00

1m Pasang Kaso + Reng Atap Sirap Kayu Borneo


Bahan
Balok Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

35,530.00

2,750
3,850
440
275
27,515.00

1,600,000.00
34,100.00

1m Pasang Kaso + Reng Atap Sirap Kayu Kamper


Bahan
Balok Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

7,315.00

23,100.00
5,115.00

1m Pasang Kaso + Reng Genteng Beton Kayu Borneo


Bahan
Balok Kayu Borneo
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

397,430.00

2,750
3,850
440
275
28,215.00

0.014
0.150

7,315.00

385,000.00
5,115.00

1m Pasang Kaso + Reng Genteng Monier Kayu Kamper


Bahan
Balok Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

2,750
3,850
440
275
390,115.00

0.014
0.150

31,630.00

19,200.00
5,115.00

1m Pasang Kaso + Reng Genteng Monier Kayu Jati


Bahan
Balok Kayu Jati
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

7,315.00

19,800.00

18,975.00

42,185.00

Paku Biasa 2" - 5"


Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

0.100

Kg

0.150
0.250
0.025
0.075

Oh
Oh
Oh
Oh

34,100.00

3,410.00
27,500.00
38,500.00
44,000.00
55,000.00

1m Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Borneo


Bahan
Balok Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

23,210.00
0.012
0.100

m3
Kg

0.150
0.250
0.025
0.075

Oh
Oh
Oh
Oh

1,650,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

m3
Kg

0.200
0.300
0.030
0.010

Oh
Oh
Oh
Oh

27,500,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

m3
Kg

0.200
0.300
0.030
0.010

Oh
Oh
Oh
Oh

1,650,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

m3
Kg

0.200
0.300
0.030
0.010

Oh
Oh
Oh
Oh

1,600,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

m3
Kg

0.250
0.350
0.035
0.0125

Oh
Oh
Oh
Oh

27,500,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

m3
Kg

0.250
0.350
0.035
0.0125

Oh
Oh
Oh
Oh

0.027
0.200

m3
Kg

0.250
0.350
0.035
0.0125

Oh
Oh
Oh
Oh

0.0072
0.050

m3
Kg

0.100
0.200

Oh
Oh

1,650,000.00
34,100.00

1m' Pasang Lisplank ( 3 x 20 )cm Kayu Jati


Bahan
Papan Kayu Jati
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu

22,577.50

73,947.50

44,550.00
6,820.00
27,500.00
38,500.00
44,000.00
55,000.00

1m Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Borneo


Bahan
Balok Kayu Borneo
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

771,897.50

6,875
13,475
1,540
688
51,370.00

0.027
0.200

22,577.50

742,500.00
6,820.00

1m Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Kamper


Bahan
Balok Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

60,835.00

5,500
11,550
1,320
550
749,320.00

0.027
0.200

18,920.00

36,800.00
5,115.00

1m Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Jati


Bahan
Balok Kayu Jati
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

61,985.00

5,500
11,550
1,320
550
41,915.00

0.023
0.150

18,920.00

37,950.00
5,115.00

1m Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Borneo


Bahan
Balok Kayu Borneo
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

656,535.00

5,500
11,550
1,320
550
43,065.00

0.023
0.150

18,920.00

632,500.00
5,115.00

1m Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Kamper


Bahan
Balok Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

42,185.00

4,125
9,625
1,100
4,125
637,615.00

0.023
0.150

18,975.00

19,800.00
3,410.00

1m Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Jati


Bahan
Balok Kayu Jati
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

4,125
9,625
1,100
4,125

6,875
13,475
1,540
688
50,020.00

1,600,000.00
34,100.00

22,577.50

72,597.50

43,200.00
6,820.00
27,500.00
38,500.00
44,000.00
55,000.00

6,875
13,475
1,540
688
199,705.00

27,500,000.00
34,100.00

11,825.00

198,000.00
1,705.00
27,500.00
38,500.00

2,750
7,700

211,530.00

Kepala Tukang
Mandor
1m' Pasang Lisplank ( 3 x 20 )cm Kayu Kamper
Bahan
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Lisplank ( 3 x 30 )cm Kayu Jati
Bahan
Papan Kayu Jati
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Lisplank ( 3 x 30 )cm Kayu Kamper
Bahan
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Lisplank 2 x( 3 x 20 )cm Kayu Kamper
Bahan
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Lisplank 2 x( 2 x 20 )cm Kayu Kamper
Bahan
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Lisplank 2 x( 2 x 20 )cm Kayu Borneo
Bahan
Papan Kayu Borneo
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

0.025
0.005

Oh
Oh

44,000.00
55,000.00
16,357.00

0.0072
0.050

m3
Kg

0.100
0.200
0.025
0.005

Oh
Oh
Oh
Oh

0.0110
0.050

m3
Kg

0.110
0.220
0.022
0.005

Oh
Oh
Oh
Oh

0.0110
0.050

m3
Kg

0.110
0.220
0.022
0.005

Oh
Oh
Oh
Oh

2,035,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

27,500,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

Oh
Oh
Oh
Oh

2,035,000.00
34,100.00

m3
Kg

0.100
0.100
0.010
0.050

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

m3
Kg

0.100
0.100
0.010
0.050

Oh
Oh
Oh
Oh

2,035,000.00
34,100.00

m3
m3
Kg

0.150
0.450
0.045
0.075

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

2,035,000.00
34,100.00

4,125
9,625
1,100
4,125

27,500.00
38,500.00
44,000.00
55,000.00

m3
m3
Kg

0.150
0.450
0.045
0.075

Oh
Oh
Oh
Oh

9,790.00

29,337.00

2,750
3,850
440
2,750

2,035,000.00
34,100.00

9,790.00

29,744.00

17,908.00
2,046.00
27,500.00
38,500.00
44,000.00
55,000.00

2,750
3,850
440
2,750

1,650,000.00
2,035,000.00
34,100.00

27,555.00

77,385.00

32,175.00
14,245.00
3,410.00
27,500.00
38,500.00
44,000.00
55,000.00

4,125
17,325
1,980
4,125
48,855.00

0.0195
0.007
0.100

50,528.50

17,501.00
2,046.00

1m Pasang Rangka Dinding Pemisah Kayu Borneo


Bahan
Balok Kayu Borneo
Papan Kayu Borneo
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

18,975.00

29,507.50
2,046.00

49,830.00
0.0195
0.007
0.100

36,828.00

3,025
8,470
968
275

19,954.00
0.0088
0.060

12,738.00

22,385.00
1,705.00

19,547.00
0.0086
0.060

316,943.00

3,025
8,470
968
275

31,553.50

0.150
0.250
0.025
0.075

12,738.00

302,500.00
1,705.00

24,090.00

m3
Kg

28,182.00

2,750
7,700
1,100
275
304,205.00

0.0145
0.060

11,825.00

14,652.00
1,705.00

1m Pasang Rangka Dinding Pemisah Kayu Kamper


Bahan
Balok Kayu Kamper
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1,100
275

1,600,000.00
2,035,000.00
34,100.00

27,555.00

31,200.00
14,245.00
3,410.00
27,500.00
38,500.00
44,000.00
55,000.00

4,125
17,325
1,980
4,125

76,410.00

1m Pasang Dinding Pemisah Teakwood Rangkap, RangkaKayu Kamper


Bahan
Balok Kayu Kamper
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

49,830.00

0.0195
0.007
0.100

m3
m3
Kg

0.150
0.450
0.045
0.075

Oh
Oh
Oh
Oh

1,650,000.00
2,035,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

m3
m3
Kg

0.150
0.450
0.045
0.075

Oh
Oh
Oh
Oh

1,650,000.00
2,035,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

m3
m3
Kg
lt
lbr

0.200
0.600
0.060
0.010

Oh
Oh
Oh
Oh

1,650,000.00
2,035,000.00
34,100.00
9,900.00
42,900.00
27,500.00
38,500.00
44,000.00
55,000.00

m3
Kg
Kg

0.600
1.800
0.180
0.030

Oh
Oh
Oh
Oh

27,500,000.00
34,100.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

0.400
0.050

lbr
Kg

0.025
0.075
0.0075
0.0013

Oh
Oh
Oh
Oh

42,900.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

m'

0.021
0.021
0.0020
0.0010

Oh
Oh
Oh
Oh

10.000
0.026
0.044

Kg
m3
m3

1.150
0.020
0.002
0.006

Oh
Oh
Oh
Oh

218.000
0.520
0.870

Kg
m3
m3

17,600.00

Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga

32,758.00

61,448.00

11,000.00
5,590.00
12,100.00
27,500.00
35,750.00
44,000.00
55,000.00

31,625
715
88
330
590,850.00

1,100.00
215,000.00
275,000.00

20,009.00

578
809
88
55

28,690.00
1,100.00
215,000.00
275,000.00

1 m Membuat Beton Tumbuk 1 Pc : 3 Ps : 5 Kr

1,529.00

18,480.00
27,500.00
38,500.00
44,000.00
55,000.00

PEKERJAAN BETON
1 m2 Membuat Lantai Kerja Beton Tumbuk 1 Pc : 3 Ps : 5 Kr
Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

22,841.50

688
2,888
330
72
18,480.00

1.050

3,976.50

17,160.00
1,705.00

1m Pasang List Plafond Kayu Profil


Bahan
Kayu Profil
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

296,395.00

16,500
69,300
7,920
1,650
18,865.00

Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

95,370.00

192,500.00
3,410.00
5,115.00

1m Pasang Plywood tebal 4mm, untuk dinding


Bahan
Plywood 4 mm
Paku Biasa " - 1"

130,064.00

5,500
23,100
2,640
550
201,025.00

0.007
0.100
0.150

31,790.00

32,175.00
14,245.00
3,410.00
5,544.00
42,900.00

1m Pasang Dinding Lambriziring dari papan Kayu jati


Bahan
Papan Kayu Jati
Paku Biasa 2" - 5"
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

77,385.00

4,125
17,325
1,980
4,125
98,274.00

0.0195
0.007
0.100
0.560
1.000

27,555.00

32,175.00
14,245.00
3,410.00

1m Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper


Bahan
Balok Kayu Kamper
Papan Kayu Kamper
Paku Biasa 2" - 5"
Lem Kayu
Plywood 4 mm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

4,125
17,325
1,980
4,125
49,830.00

0.0195
0.007
0.100

77,385.00

32,175.00
14,245.00
3,410.00

1m Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper


Bahan
Balok Kayu Kamper
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

27,555.00

239,800.00
111,800.00
239,250.00

59,812.50

650,662.50

Perkerja
Tukang Batu
Kepala Tukang
Mandor

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

197.000
0.470
0.940

Kg
m3
m3

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

1 m Membuat Beton Tumbuk 1 Pc : 3 Ps : 6 Kr


Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

576,250.00
1,100.00
215,000.00
275,000.00
27,500.00
35,750.00
44,000.00
55,000.00

Kg
m3
m3

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

1,100.00
215,000.00
275,000.00
27,500.00
35,750.00
44,000.00
55,000.00

Kg
m3
m3

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

1,100.00
215,000.00
275,000.00
27,500.00
35,750.00
44,000.00
55,000.00

Kg
m3
m3

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

352.000
0.560
0.700

Kg
m3
m3

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

1,100.00
215,000.00
275,000.00
27,500.00
35,750.00
44,000.00
55,000.00

Kg
m3
m3

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

1,100.00
215,000.00
275,000.00

1 m Membuat Beton Bertulang 1 Pc : 1 Ps : 2Kr

45,375
8,938
1,100
4,400

27,500.00
35,750.00
44,000.00
55,000.00

Kg
m3
m3

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

59,812.50

691,312.50

45,375
8,938
1,100
4,400
740,150.00

386.000
0.470
0.780

759,912.50

392,700.00
90,300.00
148,500.00

1 m Membuat Beton Bertulang 1 Pc : 1.5 Ps : 2.5Kr


Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

59,812.50

387,200.00
120,400.00
192,500.00

631,500.00
357.000
0.420
0.540

712,062.50

45,375
8,938
1,100
4,400
700,100.00

1,100.00
215,000.00
275,000.00

1 m Membuat Beton Bertulang 1 Pc : 1.5 Ps : 3Kr


Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

59,812.50

308,000.00
96,750.00
247,500.00

1 m Membuat Beton Bertulang 1 Pc : 2 Ps : 2.5 Kr


Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

641,312.50

45,375
8,938
1,100
4,400
652,250.00

280.000
0.450
0.900

59,812.50

255,200.00
111,800.00
214,500.00

1 m Membuat Beton Bertulang 1 Pc : 2 Ps : 4 Kr


Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

611,912.50

45,375
8,938
1,100
4,400

581,500.00
232.000
0.520
0.780

59,812.50

190,300.00
122,550.00
239,250.00

1 m Membuat Beton 1 Pc : 2 Ps : 3 Kr
Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

636,062.50

45,375
8,938
1,100
4,400
552,100.00

173.000
0.570
0.870

59,812.50

216,700.00
101,050.00
258,500.00

1 m Membuat Beton Tumbuk 1 Pc : 4 Ps : 6 Kr


Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

45,375
8,938
1,100
4,400

1,100.00
215,000.00
275,000.00

59,812.50

799,962.50

424,600.00
101,050.00
214,500.00
27,500.00
35,750.00
44,000.00
55,000.00

45,375
8,938
1,100
4,400
809,950.00

59,812.50

869,762.50

Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

479.000
0.370
0.740

Kg
m3
m3

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

1,100.00
215,000.00
275,000.00

526,900.00
79,550.00
203,500.00
27,500.00
35,750.00
44,000.00
55,000.00

1 m Membuat Tiang Pancang Prestressed Beton


Bahan
Semen Portland
Pasir Beton
Koral Beton
Rapidrant
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

828,892.00
479.000
0.370
0.740
2.460

Kg
m3
m3
gln

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

336.000
0.540
0.810

Kg
m3
m3

2.000
0.350
0.035
1.000

Oh
Oh
Oh
Oh

1,100.00
215,000.00
275,000.00
7,700.00
27,500.00
35,750.00
44,000.00
55,000.00

Kg
m3
m3

2.000
0.350
0.035
1.000

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

1,100.00
215,000.00
275,000.00
27,500.00
35,750.00
44,000.00
55,000.00

Kg
m3
m3

2.000
0.350
0.035
1.000

Oh
Oh
Oh
Oh

1,100.00
215,000.00
275,000.00

Kg
m3
m3

2.000
0.350
0.035
1.000

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

1,100.00
215,000.00
275,000.00

Kg
m3
m3

2.000
0.350
0.035
1.000

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

400.000
0.480
0.800
1.200

Kg
m3
m3
Kg

1,100.00
215,000.00
275,000.00

Bahan
Semen Portland
Pasir Beton
Koral Beton
Strorox - 100
Tenaga

887,252.50

124,052.50

1,055,352.50

676,500.00
111,800.00
143,000.00
55,000
12,513
1,540
55,000
769,140.00

1,100.00
215,000.00
275,000.00
4,950.00

124,052.50

55,000
12,513
1,540
55,000

27,500.00
35,750.00
44,000.00
55,000.00

1 m Membuat Beton Kedap Air dengan Strorox - 100

864,352.50

55,000
12,513
1,540
55,000

931,300.00
615.000
0.520
0.520

124,052.50

440,000.00
103,200.00
220,000.00

1 m Membuat Beton Bertulang 1 Pc : 1Ps : 1Splt


Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

800,952.50

55,000
12,513
1,540
55,000

763,200.00
400.000
0.480
0.800

124,052.50

403,700.00
94,600.00
242,000.00

1 m Membuat Beton Bertulang 1 Pc : 1.5Ps : 2.5 Splt


Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

55,000
12,513
1,540
55,000

740,300.00
367.000
0.440
0.880

832,502.50

320,100.00
101,050.00
255,750.00

1 m Membuat Beton Bertulang 1 Pc : 1.5Ps : 3 Splt


Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

124,052.50

369,600.00
116,100.00
222,750.00

676,900.00
291.000
0.470
0.930

888,704.50

45,375
8,938
1,100
4,400
708,450.00

1,100.00
215,000.00
275,000.00

1 m Membuat Beton Bertulang 1 Pc : 2Ps : 4 Splt


Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

59,812.50

526,900.00
79,550.00
203,500.00
18,942.00

1 m Membuat Beton Bertulang 1 Pc : 2Ps : 3 Splt


Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

45,375
8,938
1,100
4,400

440,000.00
103,200.00
220,000.00
5,940.00

124,052.50

893,192.50

Perkerja
Tukang Batu
Kepala Tukang
Mandor

2.000
0.350
0.035
1.000

Oh
Oh
Oh
Oh

1.050

m'

0.050
0.030
0.003
0.002

Oh
Oh
Oh
Oh

1.050

m'

0.050
0.030
0.0035
0.002

Oh
Oh
Oh
Oh

1.050

m'

0.550
0.350
0.003

Oh
Oh
Oh

1.050

m'

0.550
0.350
0.003

Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

1 m' Memasang PVC Waterstop lebar 150 mm


Bahan
Waterstop lebar 150 mm
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

36,960.00
35,200.00
27,500.00
35,750.00
44,000.00
55,000.00

27,500.00
35,750.00
44,000.00
55,000.00

27,500.00
35,750.00
55,000.00

m'
Oh
Oh
Oh

45,100.00
27,500.00
35,750.00
55,000.00

1 Kg Pembesian dengan Besi Polos atau Besi Ulir


Bahan
Besi Beton ( Polos / Ulir )
Kawat Beton
Tenaga
Perkerja
Tukang Besi
Kepala Tukang
Mandor
1 Kg Kabel Presstressed Polos / Strands
Bahan
Besi Beton ( Polos / Ulir )
Kawat Beton
Tenaga
Perkerja
Tukang Besi
Kepala Tukang
Mandor
1 Kg Jaring Kawat Baja
Bahan
Besi Jaring Kawat Baja
Kawat Beton
Tenaga
Perkerja
Tukang Besi
Kepala Tukang
Mandor

m'

0.550
0.350
0.003

Oh
Oh
Oh

50,600.00

Kg
Kg

0.007
0.007
0.0007
0.0003

Oh
Oh
Oh
Oh

Kg
Kg

0.005
0.005
0.0005
0.0003

Oh
Oh
Oh
Oh

71,500.00

Kg
Kg

0.025
0.025
0.0025
0.0015

Oh
Oh
Oh
Oh

27,802.50

102,877.50

75,075.00
27,500.00
35,750.00
55,000.00

15,125
12,513
165

16,500.00
21,450.00

490.05

18,136.80

17,325.00
321.75
27,500.00
35,750.00
44,000.00
55,000.00

193
250
31
17

16,500.00
21,450.00

354.75

17,894.25

17,325.00
214.50
27,500.00
35,750.00
44,000.00
55,000.00

138
179
22
17
39,707.25

1.020
0.805

80,932.50

15,125
12,513
165

17,539.50
1.050
0.010

27,802.50

53,130.00
27,500.00
35,750.00
55,000.00

17,646.75
1.050
0.015

75,157.50

15,125
12,513
165

75,075.00
1.050

27,802.50

47,355.00

1 m' Memasang PVC Waterstop lebar 320 mm


Bahan
Waterstop lebar 320 mm
Tenaga
Perkerja
Tukang Batu
Mandor

70,537.50

15,125
12,513
165

53,130.00

0.550
0.350
0.003

27,802.50

42,735.00

47,355.00

1.050

43,136.50

1,375
1,073
154
110
42,735.00

40,700.00

1 m' Memasang PVC Waterstop lebar 300 mm


Bahan
Waterstop lebar 300 mm
Tenaga
Perkerja
Tukang Batu
Mandor

2,711.50

40,425.00

1 m' Memasang PVC Waterstop lebar 250 mm


Bahan
Waterstop lebar 250 mm
Tenaga
Perkerja
Tukang Batu
Mandor

39,649.50

1,375
1,073
132
110
40,425.00

38,500.00

1 m' Memasang PVC Waterstop lebar 230 mm


Bahan
Waterstop lebar 230 mm
Tenaga
Perkerja
Tukang Batu
Mandor

2,689.50

36,960.00

1 m' Memasang PVC Waterstop lebar 200 mm


Bahan
Waterstop lebar 200 mm
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

55,000
12,513
1,540
55,000

22,000.00
21,450.00

1,773.75

22,440.00
17,267.25
27,500.00
35,750.00
44,000.00
55,000.00

688
894
110
83

41,481.00

1 m2 Pasang Bekisting
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Plywood 9 mm
Dolken Kayu Galam 8 - 10 / 4m

0.040
0.400
0.200
0.350
2.000

m3
Kg
Lt
lbr
btg

Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

0.300
0.330
0.0330
0.0060

Oh
Oh
Oh
Oh

1 m2 Pasangan Stoot Werk


Bahan
Kayu Kaso 5 / 7 (borneo)
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m2 Pasang Bekisting untuk Pondasi
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m2 Pasang Bekisting untuk Sloof
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

108,955.00
1,540,000.00
34,100.00
4,950.00
49,500.00
7,700.00

m3
kg

0.1500
0.2000
0.2000
0.0170

org
org
org
org

27,500.00
38,500.00
44,000.00
55,000.00

8,250
12,705
1,452
330

2,035,000.00
34,100.00

m3
Kg
Lt

0.300
0.260
0.0260
0.0050

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

m3
Kg
Lt

0.300
0.260
0.0260
0.0050

Oh
Oh
Oh
Oh

1 m2 Pasang Bekisting untuk Kolom


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu Borneo
Plywood 9 mm
Dolken Kayu Galam 8 - 10 / 4m

0.040
0.400
0.200
0.015
0.350
2.000

m3
Kg
Lt
m3
lbr
btg

Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

0.300
0.330
0.0330
0.0060

Oh
Oh
Oh
Oh

1,540,000.00
34,100.00
4,950.00

0.040
0.400
0.200
0.018
0.350
2.000

m3
Kg
Lt
m3
lbr
btg

Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

0.320
0.330
0.0330
0.0060

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

0.040
0.400
0.200
0.015
0.350
6.000

m3
Kg
Lt
m3
lbr
btg

Tenaga
Perkerja

0.320

Oh

92,004.00

8,250
10,010
1,144
275

1,540,000.00
34,100.00
4,950.00

19,679.00

92,004.00

61,600.00
10,230.00
495.00
27,500.00
38,500.00
44,000.00
55,000.00

8,250
10,010
1,144
275

1,540,000.00
34,100.00
4,950.00
1,600,000.00
49,500.00
7,700.00

22,737.00

155,692.00

61,600.00
13,640.00
990.00
24,000.00
17,325.00
15,400.00
27,500.00
38,500.00
44,000.00
55,000.00

8,250
12,705
1,452
330
137,755.00

1 m2 Pasang Bekisting untuk Lantai


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu Borneo
Plywood 9 mm
Dolken Kayu Galam 8 - 10 / 4m

19,679.00

61,600.00
10,230.00
495.00

132,955.00

1 m2 Pasang Bekisting untuk Balok


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu Borneo
Plywood 9 mm
Dolken Kayu Galam 8 - 10 / 4m

218,097.00

4,125
7,700
8,800
935

72,325.00
0.040
0.300
0.100

21,560.00

179,487.00
17,050.00

72,325.00
0.040
0.300
0.100

131,692.00

61,600.00
13,640.00
990.00
17,325.00
15,400.00

196,537.00
0.0882
0.5000

22,737.00

1,540,000.00
34,100.00
4,950.00
1,600,000.00
49,500.00
7,700.00

23,287.00

161,042.00

61,600.00
13,640.00
990.00
28,800.00
17,325.00
15,400.00
27,500.00
38,500.00
44,000.00
55,000.00

8,800
12,705
1,452
330
163,755.00

1,540,000.00
34,100.00
4,950.00
1,600,000.00
49,500.00
7,700.00

22,379.50

61,600.00
13,640.00
990.00
24,000.00
17,325.00
46,200.00
27,500.00

8,800

186,134.50

Tukang Batu
Kepala Tukang
Mandor
1 m2 Pasang Bekisting untuk Dinding
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu Borneo
Plywood 9 mm
Dolken Kayu Galam 8 - 10 / 4m
Formtie / penjaga jarak bekisting
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

0.330
0.033
0.006

Oh
Oh
Oh

0.040
0.400
0.200
0.015
0.350
6.000
4.000

m3
Kg
Lt
m3
lbr
btg
bh

0.320
0.330
0.033
0.006

Oh
Oh
Oh
Oh

35,750.00
44,000.00
55,000.00
449,755.00

1 m2 Pasang Bekisting untuk Tangga


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu Borneo
Plywood 9 mm
Dolken Kayu Galam 8 - 10 / 4m

0.030
0.400
0.150
0.015
0.350
2.000

m3
Kg
Lt
m3
lbr
btg

Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

0.320
0.330
0.033
0.006

Oh
Oh
Oh
Oh

1,540,000.00
34,100.00
4,950.00
1,600,000.00
49,500.00
7,700.00
71,500.00
27,500.00
38,500.00
44,000.00
55,000.00

1,540,000.00
34,100.00
4,950.00
1,600,000.00
49,500.00
7,700.00

3.900
0.350
1.040
1.050
0.245
0.165

Oh
Oh
Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

1,540,000.00
34,100.00
4,950.00
16,000.00
21,450.00
1,100.00
215,000.00
275,000.00
27,500.00
35,750.00
38,500.00
35,750.00
44,000.00
55,000.00

m3
Kg
Lt
Kg
Kg
Kg
m3
m3

4.850
0.350
1.560
1.400
0.331
0.170

Oh
Oh
Oh
Oh
Oh
Oh

1,540,000.00
34,100.00
4,950.00
16,000.00
21,450.00
1,100.00
215,000.00
275,000.00

Tenaga
Perkerja

m3
Kg
Lt
Kg
Kg
Kg
m3
m3
m3
lbr
btg

7.300

Oh

3,708,187.50

107,250
12,513
40,040
37,538
10,780
9,075

27,500.00
35,750.00
38,500.00
35,750.00
44,000.00
55,000.00

279,911.50

4,712,831.50

133,375
12,513
60,060
50,050
14,564
9,350
6,961,925.00

0.400
4.000
2.000
300.000
4.500
323.000
0.520
0.780
0.150
3.500
20.000

217,195.00

415,800.00
68,200.00
2,970.00
3,200,000.00
64,350.00
355,300.00
111,800.00
214,500.00

1 m Membuat Kolom Beton Bertulang ( 300 Kg + bekisting )


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok Borneo
Plywood 9 mm
Dolken 8 / 4 m

8,800
12,705
1,452
330

4,432,920.00
0.270
2.000
0.600
200.000
3.000
323.000
0.520
0.780

140,594.50

308,000.00
51,150.00
1,980.00
2,400,000.00
48,262.50
355,300.00
111,800.00
214,500.00

1 m Membuat Sloof Beton Bertulang ( 200 Kg + bekisting )


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

23,287.00

46,200.00
13,640.00
742.50
24,000.00
17,325.00
15,400.00

3,490,992.50
m3
Kg
Lt
Kg
Kg
Kg
m3
m3

473,042.00

8,800
12,705
1,452
330
117,307.50

0.200
1.500
0.400
150.000
2.250
323.000
0.520
0.780

23,287.00

61,600.00
13,640.00
990.00
24,000.00
17,325.00
46,200.00
286,000.00

1 m Membuat Pondasi Beton Bertulang ( 150 Kg + bekisting )


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

11,798
1,452
330

1,540,000.00
34,100.00
4,950.00
16,000.00
21,450.00
1,100.00
215,000.00
275,000.00
1,815,000.00
49,500.00
8,800.00

454,217.50

616,000.00
136,400.00
9,900.00
4,800,000.00
96,525.00
355,300.00
111,800.00
214,500.00
272,250.00
173,250.00
176,000.00
27,500.00

200,750

7,416,142.50

Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.350
3.300
2.100
0.570
0.250

Oh
Oh
Oh
Oh
Oh

35,750.00
38,500.00
35,750.00
44,000.00
55,000.00

1 m Membuat Balok Beton Bertulang ( 200 Kg + bekisting )


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok Borneo
Plywood 9 mm
Dolken 8 / 4 m
Tenaga
Perkerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

5,089,290.00
0.320
3.200
1.600
200.000
3.000
323.000
0.520
0.780
0.140
2.800
16.000

m3
Kg
Lt
Kg
Kg
Kg
m3
m3
m3
lbr
btg

5.960
0.350
2.800
1.400
0.455
0.208

Oh
Oh
Oh
Oh
Oh
Oh

1,540,000.00
34,100.00
4,950.00
16,000.00
21,450.00
1,100.00
215,000.00
275,000.00
1,815,000.00
49,500.00
8,800.00
27,500.00
35,750.00
38,500.00
35,750.00
44,000.00
55,000.00

Tenaga
Perkerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

m3
Kg
Lt
Kg
Kg
Kg
m3
m3
m3
lbr
btg

5.800
0.350
2.800
1.050
0.420
0.185

Oh
Oh
Oh
Oh
Oh
Oh

1,540,000.00
34,100.00
4,950.00
16,000.00
21,450.00
1,100.00
215,000.00
275,000.00
1,815,000.00
49,500.00
8,800.00
27,500.00
35,750.00
38,500.00
35,750.00
44,000.00
55,000.00

Tenaga
Perkerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

m3
Kg
Lt
Kg
Kg
Kg
m3
m3
m3
lbr
btg

5.600
0.350
2.640
1.050
0.400
0.193

Oh
Oh
Oh
Oh
Oh
Oh

1,540,000.00
34,100.00
4,950.00
16,000.00
21,450.00
1,100.00
215,000.00
275,000.00
1,815,000.00
49,500.00
8,800.00
27,500.00
35,750.00
38,500.00
35,750.00
44,000.00
55,000.00

Tenaga
Perkerja

m3
Kg
Lt
Kg
Kg
Kg
m3
m3
m3
lbr
btg

5.600

Oh

4,590,607.50

154,000
12,513
101,640
37,538
17,600
10,615
4,876,715.00

0.250
3.000
1.200
200.000
3.000
323.000
0.520
0.780
0.105
2.500
14.000

333,905.00

369,600.00
109,120.00
7,920.00
2,400,000.00
48,262.50
355,300.00
111,800.00
214,500.00
290,400.00
138,600.00
211,200.00

1 m Membuat Tangga Beton Bertulang ( 200 Kg + bekisting )


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok Borneo
Plywood 9 mm
Dolken 8 / 4 m

4,723,707.50

159,500
12,513
107,800
37,538
18,480
10,175
4,256,702.50

0.240
3.200
1.600
150.000
2.250
323.000
0.520
0.780
0.160
2.800
24.000

346,005.00

492,800.00
109,120.00
7,920.00
2,400,000.00
48,262.50
355,300.00
111,800.00
214,500.00
217,800.00
138,600.00
281,600.00

1 m Membuat Dinding Beton Bertulang ( 150 Kg + bekisting )


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok Borneo
Plywood 9 mm
Dolken 8 / 4 m

5,455,012.50

163,900
12,513
107,800
50,050
20,020
11,440
4,377,702.50

0.320
3.200
1.600
150.000
2.250
323.000
0.520
0.780
0.120
2.800
32.000

365,722.50

492,800.00
109,120.00
7,920.00
3,200,000.00
64,350.00
355,300.00
111,800.00
214,500.00
254,100.00
138,600.00
140,800.00

1 m Membuat Balok Beton Bertulang ( 150 Kg + bekisting )


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok Borneo
Plywood 9 mm
Dolken 8 / 4 m

12,513
127,050
75,075
25,080
13,750

1,540,000.00
34,100.00
4,950.00
16,000.00
21,450.00
1,100.00
215,000.00
275,000.00
1,815,000.00
49,500.00
8,800.00

334,042.50

385,000.00
102,300.00
5,940.00
3,200,000.00
64,350.00
355,300.00
111,800.00
214,500.00
190,575.00
123,750.00
123,200.00
27,500.00

154,000

5,210,757.50

Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.350
2.300
1.400
0.405
0.202

Oh
Oh
Oh
Oh
Oh

35,750.00
38,500.00
35,750.00
44,000.00
55,000.00

1 m Membuat Kolom Penguat Beton Bertulang (11 x 11) cm


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

69,238.50
0.002
0.010
3.000
0.450
4.000
0.006
0.009

m3
Kg
Kg
Kg
Kg
m3
m3

0.060
0.020
0.020
0.020
0.006
0.003

Oh
Oh
Oh
Oh
Oh
Oh

0.003
0.200
3.600
0.050
5.500
0.009
0.015

m3
Kg
Kg
Kg
Kg
m3
m3

0.100
0.330
0.033
0.033
0.010
0.005

Oh
Oh
Oh
Oh
Oh
Oh

25.000

bh

0.150
0.075
0.008
0.008

Oh
Oh
Oh
Oh

25.000

bh

0.150
0.075
0.008
0.008

Oh
Oh
Oh
Oh

12.000

bh

0.150
0.060
0.006
0.008

Oh
Oh
Oh
Oh

5.000
8.000
0.032

bh
Kg
m3

0.400
0.200
0.020
0.002

Oh
Oh
Oh
Oh

1,540,000.00
34,100.00
16,000.00
21,450.00
1,100.00
215,000.00
275,000.00

27,500.00
35,750.00
38,500.00
35,750.00
44,000.00
55,000.00

27,500.00
35,750.00
38,500.00
35,750.00
44,000.00
55,000.00

1m' Pasang Genteng Bubung Palentong


Bahan
Genteng Bubung Palentong
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Genteng Bubung Kodok Glazzur
Bahan
Genteng Bubung Kodok
Semen Portland
Pasir Pasang

27,500.00
38,500.00
44,000.00
55,000.00

5,060.00

7,804.50

134,304.50

126,500.00
27,500.00
38,500.00
44,000.00
55,000.00

2,420.00

4,125
2,888
352
440
7,139.00

36,179.00

29,040.00
27,500.00
38,500.00
44,000.00
55,000.00

4,125
2,310
264
440
40,430.00

4,950.00
1,100.00
215,000.00

19,690.00

60,120.00

24,750.00
8,800.00
6,880.00
27,500.00
38,500.00
44,000.00
55,000.00

11,000
7,700
880
110
54,180.00

7,700.00
1,100.00
215,000.00

49,054.50

4,125
2,888
352
440

29,040.00

bh
Kg
m3

7,804.50

41,250.00

126,500.00

5.000
8.000
0.032

96,800.25

2,750
11,798
1,271
1,180
440
275

41,250.00
1,650.00

1m Pasang Atap Genteng Palentong Super / Besar


Bahan
Genteng Palentong Super
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

17,712.75

1,485.00
6,820.00
57,600.00
1,072.50
6,050.00
1,935.00
4,125.00

1m Pasang Atap Genteng Kodok / Glazzur


Bahan
Genteng Kodok
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

73,517.50

1,650
715
770
715
264
165
79,087.50

495,000.00
34,100.00
16,000.00
21,450.00
1,100.00
215,000.00
275,000.00

PEKERJAAN PENTUP ATAP


1m Pasang Atap Genteng Palentong Kecil
Bahan
Genteng Palentong
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

4,279.00

3,080.00
341.00
48,000.00
9,652.50
4,400.00
1,290.00
2,475.00

1 m Membuat Ring Balok Beton Bertulang (10 x 15) cm


Bahan
Kayu Albasiah
Paku Biasa 2" - 5"
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

12,513
88,550
50,050
17,820
11,110

38,500.00
8,800.00
6,880.00

19,690.00

73,870.00

Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Genteng Bubung Palentong Besar
Bahan
Genteng Bubung Palentong
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Rooflight Fiberglass ( 180 x 90 ) cm
Bahan
Roof Light Fiberglass
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Atap Asbes Gelombang ( 2.50 x 0.92 m ) X 5mm
Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Atap Asbes Gelombang ( 2.25 x 0.92 m ) X 5mm
Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Atap Asbes Gelombang ( 2.00 x 0.92 m ) X 5mm
Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Atap Asbes Gelombang ( 1.80 x 0.92 m ) X 5mm
Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

0.400
0.200
0.020
0.002

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00
35,480.00

4.000
8.000
0.032

bh
Kg
m3

0.400
0.200
0.020
0.002

Oh
Oh
Oh
Oh

4,950.00
1,100.00
215,000.00
27,500.00
38,500.00
44,000.00
55,000.00

lbr
Kg

0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

385,000.00
34,100.00

lbr
Kg

0.140
0.075
0.008
0.008

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

lbr
Kg

0.140
0.075
0.008
0.008

Oh
Oh
Oh
Oh

19,800.00
34,100.00

lbr
Kg

0.140
0.070
0.007
0.007

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

lbr
Kg

0.140
0.070
0.007
0.007

Oh
Oh
Oh
Oh

0.350
0.120

lbr
Kg

0.140
0.070
0.007
0.007

Oh
Oh
Oh
Oh

19,800.00
34,100.00

0.420
0.120

lbr
Kg

0.140
0.070

Oh
Oh

7,529.50

23,501.50

11,880.00
4,092.00
27,500.00
38,500.00
44,000.00
55,000.00

19,800.00
34,100.00

3,850
2,888
352
440
7,238.00

23,210.00

11,880.00
4,092.00
27,500.00
38,500.00
44,000.00
55,000.00

19,800.00
34,100.00

3,850
2,695
308
385
7,238.00

26,180.00

14,850.00
4,092.00
27,500.00
38,500.00
44,000.00
55,000.00

3,850
2,695
308
385
11,022.00

19,800.00
34,100.00

7,238.00

18,260.00

6,930.00
4,092.00
27,500.00
38,500.00
44,000.00
55,000.00

1m Pasang Atap Asbes Gelombang ( 270 x 1.05 m ) X 4mm


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu

21,521.50

3,850
2,888
352
440

18,942.00
0.750
0.120

7,529.50

9,900.00
4,092.00

15,972.00
0.600
0.120

239,827.50

3,850
2,580
308
385

15,972.00
0.600
0.120

7,122.50

231,000.00
1,705.00

13,992.00
0.500
0.120

55,170.00

11,000
7,700
880
110
232,705.00

0.600
0.050

19,690.00

19,800.00
8,800.00
6,880.00

1m Pasang Atap Asbes Gelombang ( 300 x 1.05 m ) X 4mm


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

11,000
7,700
880
110

3,850
2,695
308
385
12,408.00

19,800.00
34,100.00

7,238.00

8,316.00
4,092.00
27,500.00
38,500.00

3,850
2,695

19,646.00

Kepala Tukang
Mandor

0.007
0.007

Oh
Oh

44,000.00
55,000.00

1m Pasang Atap Asbes Gelombang ( 240 x 1.05 m ) X 4mm


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

12,804.00
0.440
0.120

lbr
Kg

0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

0.510
0.120

lbr
Kg

0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

0.800
0.120

lbr
Kg

0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

19,800.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

27,500.00
38,500.00
44,000.00
55,000.00

19,800.00
34,100.00

0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

19,800.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

lbr
Kg

0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

19,800.00
34,100.00

lbr
Kg

0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

19,800.00
34,100.00

lbr
Kg

0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

19,800.00
34,100.00

1m' Pasang Bubung Stel Gelombang 0.92m

lbr
Kg

0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

20,322.50

3,850
2,580
308
385

27,500.00
38,500.00
44,000.00
55,000.00

7,122.50

20,916.50

3,850
2,580
308
385
15,378.00

0.570
0.120

7,122.50

9,702.00
4,092.00

1m Pasang Atap Asbes Gelombang ( 1.80 x 1.08 m ) X 6mm


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

18,738.50

3,850
2,580
308
385

13,794.00
0.490
0.120

7,122.50

9,108.00
4,092.00

1m Pasang Atap Asbes Gelombang ( 2.1 x 1.08 m ) X 6mm


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

18,540.50

3,850
2,580
308
385

13,200.00
0.460
0.120

7,122.50

7,524.00
4,092.00

1m Pasang Atap Asbes Gelombang ( 2.4 x 1.08 m ) X 6mm


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

3,850
2,580
308
385

11,616.00
0.380
0.120

27,054.50

7,326.00
4,092.00

1m Pasang Atap Asbes Gelombang ( 2.7 x 1.08 m ) X 6mm


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

7,122.50

15,840.00
4,092.00

11,418.00
lbr
Kg

21,312.50

3,850
2,580
308
385
19,932.00

0.370
0.120

7,122.50

10,098.00
4,092.00

1m Pasang Atap Asbes Gelombang ( 3.00 x 1.08 m ) X 6mm


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

19,926.50

3,850
2,580
308
385
14,190.00

19,800.00
34,100.00

1m Pasang Atap Asbes Gelombang ( 1.5 x 1.05 m ) X 4mm


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

7,122.50

8,712.00
4,092.00

1m Pasang Atap Asbes Gelombang ( 210 x 1.05 m ) X 4mm


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

308
385

19,800.00
34,100.00

7,122.50

22,500.50

11,286.00
4,092.00
27,500.00
38,500.00
44,000.00
55,000.00

3,850
2,580
308
385
252,120.00

7,914.50

260,034.50

Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Stel Gelombang 0.92m
Bahan
Asbes Gelombang
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Stel Gelombang 1.05m
Bahan
Asbes Gelombang
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Stel Gelombang 1.08m
Bahan
Asbes Gelombang
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Paten 0.92m
Bahan
Nok Paten
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Paten 1.05m
Bahan
Nok Paten
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Paten 1.08m
Bahan
Nok Paten
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Stel rata 0.92m
Bahan
Nok Stel rata
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Stel rata 1.05m
Bahan
Nok Stel rata
Paku Skrup 3.5"
Tenaga

2.400
6.000

lbr
Kg

0.084
0.125
0.013
0.004

Oh
Oh
Oh
Oh

19,800.00
34,100.00

47,520.00
204,600.00
27,500.00
38,500.00
44,000.00
55,000.00

2,310
4,813
572
220
252,120.00

2.400
6.000

lbr
bh

0.084
0.125
0.013
0.004

Oh
Oh
Oh
Oh

19,800.00
34,100.00

lbr
bh

0.084
0.125
0.013
0.004

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

2,310
4,813
572
220

19,800.00
34,100.00

lbr
bh

0.084
0.125
0.013
0.004

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

lbr
bh

0.084
0.125
0.013
0.004

Oh
Oh
Oh
Oh

1.200
6.000

lbr
bh

0.084
0.125
0.013
0.004

Oh
Oh
Oh
Oh

1.200
6.000

lbr
bh

0.084
0.125
0.013
0.004

Oh
Oh
Oh
Oh

19,800.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

3,300.00
34,100.00

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

lbr
bh

3,300.00
34,100.00

7,914.50

216,474.50

3,960.00
204,600.00
27,500.00
38,500.00
44,000.00
55,000.00

3,300.00
34,100.00

2,310
4,813
572
220
7,914.50

216,474.50

3,960.00
204,600.00
27,500.00
38,500.00
44,000.00
55,000.00

4,400.00
34,100.00

2,310
4,813
572
220
9,317.00

218,757.00

4,840.00
204,600.00
27,500.00
38,500.00
44,000.00
55,000.00

4,400.00
34,100.00

216,474.50

2,310
4,813
572
220

2,750
5,775
572
220
209,440.00

1.100
6.000

7,914.50

3,960.00
204,600.00

209,440.00

0.100
0.150
0.013
0.004

253,104.50

2,310
4,813
572
220

208,560.00

lbr
bh

7,914.50

40,590.00
204,600.00

208,560.00

1.100
6.000

254,094.50

2,310
4,813
572
220

208,560.00
1.200
6.000

7,914.50

41,580.00
204,600.00

245,190.00
2.050
6.000

260,034.50

47,520.00
204,600.00

246,180.00
2.100
6.000

7,914.50

4,840.00
204,600.00

7,914.50

217,354.50

Perkerja
Tukang Kayu
Kepala Tukang
Mandor

0.084
0.125
0.013
0.004

Oh
Oh
Oh
Oh

11.000
0.030

lbr
bh

0.200
0.100
0.010
0.010

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

1m Pasang Atap Genteng Beton


Bahan
Genteng Beton
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

92,983.00
8,360.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

lbr
lbr
Kg
Bh

0.200
0.300
0.003
0.010

Oh
Oh
Oh
Oh

11,000.00
42,900.00
34,100.00
880.00
27,500.00
38,500.00
44,000.00
55,000.00

lbr
Kg

0.200
0.100
0.010
0.001

Oh
Oh
Oh
Oh

43,780.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

lbr
Kg

Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

0.166
0.250
0.025
0.008

Oh
Oh
Oh
Oh

1m' Pasang Nok Genteng Beton


Bahan
Genteng Beton
Paku Biasa 2" - 5"
Semen abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Genteng Aspal
Bahan
Genteng Aspal
Paku Biasa " - 1"
Balok Kayu Borneo
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

lbr
Kg
Kg
m3
Kg

0.400
0.200
0.020
0.020

Oh
Oh
Oh
Oh

2.000
0.050
0.0035

lbr
Kg
Kg

0.125
0.250
0.025
0.006

Oh
Oh
Oh
Oh

1.100
0.050

lbr
Kg

Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

0.250
0.150
0.015
0.013

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

8,360.00
34,100.00
1,100.00
215,000.00
1,320.00
27,500.00
38,500.00
44,000.00
55,000.00

11,000.00
34,100.00
1,600,000.00

71,725.00

11,000
7,700
880
1,100
14,492.50

43,797.50

22,000.00
1,705.00
5,600.00
27,500.00
38,500.00
44,000.00
55,000.00

38,500.00
34,100.00

3,438
9,625
1,100
330
14,025.00

58,080.00

42,350.00
1,705.00
27,500.00
38,500.00
44,000.00
55,000.00

38,500.00

20,680.00

29,260.00
1,705.00
11,880.00
6,880.00
1,320.00

6,875
5,775
660
715
44,055.00

lbr

50,050.00

4,565
9,625
1,100
440

44,055.00

1.100

15,730.00

27,500.00
6,820.00

29,305.00

1m' Pasang Nok Genteng Metal


Bahan
Genteng Decra Bond
Paku Biasa " - 1"

1m' Pasang Nok Genteng Metal


Bahan
Genteng Decra Bond

458.33
34,100.00

51,045.00
3.500
0.050
10.800
0.032
1.000

61,320.60

5,500
3,850
440
55
34,320.00

60.000
0.200

9,845.00

44,655.60
6,820.00

1m Pasang Atap Sirap


Bahan
Genteng Sirap
Paku Biasa " - 1"

110,110.00

5,500
11,550
132
550
51,475.60

1.020
0.200

17,732.00

75,900.00
15,015.00
1,023.00
440.00

1m Pasang Atap Genteng Metal


Bahan
Genteng Metal
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

103,323.00

5,500
3,850
440
550
92,378.00

6.900
0.350
0.030
0.500

10,340.00

91,960.00
1,023.00

1m Pasang Atap Genteng Aspal


Bahan
Genteng Aspal
Plywood 4 mm
Paku Biasa 1/2" - 1"
Plastic Aerator
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

2,310
4,813
572
220

42,350.00

14,025.00

58,080.00

Paku Biasa " - 1"

0.050

Kg

Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

0.250
0.150
0.015
0.013

Oh
Oh
Oh
Oh

1m' Pasang Nok Sirap


Bahan
Seng Plat 3" x 6" BJLS 28
Paku Biasa " - 1"
Paku Biasa 2" - 5"
Papan Kayu Borneo tebal 3cm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

34,100.00

1,705.00
27,500.00
38,500.00
44,000.00
55,000.00
27,291.00

0.400
0.060
0.050
0.004

Lbr
Kg
Kg
m3

0.125
0.250
0.025
0.006

Oh
Oh
Oh
Oh

38,500.00
34,100.00
34,100.00
2,035,000.00
27,500.00
38,500.00
44,000.00
55,000.00

0.700
0.020

Lbr
Kg

Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

0.120
0.060
0.006
0.006

Oh
Oh
Oh
Oh

49,500.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

0.300
0.040

Lbr
Kg

0.015
0.070
0.008
0.006

Oh
Oh
Oh
Oh

38,500.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

0.015
0.075
0.008
0.006

Oh
Oh
Oh
Oh

1.200
0.040

m2
Kg

0.100
1.000
0.010
0.010

Oh
Oh
Oh
Oh

1.050

m2

0.150
0.050
0.005
0.008

Oh
Oh
Oh
Oh

44,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

VII

PEKERJAAN LANGIT - LANGIT


1 m2 Pas. Rangka Plapond Kayu Kls I (Hanya Rangka)
Bahan
Kayu Balok Borneo
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

27,500.00
38,500.00
44,000.00
55,000.00

0.1875
0.2250
0.0375
0.0105

org
org
org
org

3,850.00

Bahan
Pelat Asbes tebal 5 mm
Paku
Tenaga

lbr
Kg

1,815,000.00
34,100.00

16,046.25

61,663.25

5,156
8,663
1,650
578

0.00
0.00
0.00
0.00

3,910.50

52,651.50

38,115.00
7,502.00
27,500.00
38,500.00
44,000.00
55,000.00

44,000.00
34,100.00

10,752.50

4,125
1,925
220
440

48,741.00
1.100
0.010

6,710.00

4,042.50
27,500.00
38,500.00
44,000.00
55,000.00

1 m Langit - langit Asbes ( 1.00 x 1.00 )m tebal 5 mm

51,524.00

2,750
38,500
440
550

45,617.00
m3
kg

42,240.00

7,920.00
1,364.00

4,042.50

0.0210
0.2200

50,864.00

413
2,888
352
330
9,284.00

6,600.00
34,100.00

1m Pasang Alluminium Foil / Sisalation


Bahan
Sisalation / Alluminium Foil
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

3,982.00

46,200.00
682.00

1m Pasang Nok Alluminium


Bahan
Nok standar 40 cm 18, swg 22
Paku Hak Pnjang 15 cm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

16,703.50

413
2,695
352
330
46,882.00

m2
Kg

3,789.50

11,550.00
1,364.00

1m Pasang Atap Alluminium


1.050
0.020

41,536.00

3,300
2,310
264
330
12,914.00

Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

6,204.00

34,650.00
682.00

1m Pasang Atap Nok Seng


Bahan
Seng Plat 3" x 6" BJLS 28
Paku Biasa " - 1"

41,783.50

3,438
9,625
1,100
330
35,332.00

Bahan
Seng Gelombang 3" x 6" BJLS 28
Paku Biasa " - 1"

14,492.50

15,400.00
2,046.00
1,705.00
8,140.00

1m Pasang Atap Seng Gelombang

Bahan
Atap Alluminium Gelombang tebal 0.55
Paku Hak Pnjang 15 cm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

6,875
5,775
660
715

48,400.00
341.00

Perkerja
Tukang Kayu
Kepala Tukang
Mandor

0.030
0.070
0.007
0.0015

Oh
Oh
Oh
Oh

1.100
0.010

lbr
Kg

0.030
0.070
0.007
0.0015

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

1 m Langit - langit Asbes ( 1.00 x 1.00 )m tebal 4 mm


Bahan
Pelat Asbes tebal 4 mm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

42,691.00
38,500.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

lbr
Kg

0.030
0.070
0.007
0.0015

Oh
Oh
Oh
Oh

38,500.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

lbr
Kg

0.060
0.120
0.012
0.0030

Oh
Oh
Oh
Oh

49,500.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

lbr
Kg

0.060
0.100
0.010
0.0030

Oh
Oh
Oh
Oh

53,900.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

lbr
Kg

0.060
0.100
0.010
0.0030

Oh
Oh
Oh
Oh

66,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

lbr
Kg

0.070
0.100
0.010
0.0035

Oh
Oh
Oh
Oh

42,900.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

lbr
Kg

0.070
0.100
0.010
0.0035

Oh
Oh
Oh
Oh

42,900.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

lbr
Kg

0.070
0.100
0.010
0.0035

Oh
Oh
Oh
Oh

22,874.50

1,925
3,850
440
193
16,467.00

0.360
0.030

6,407.50

15,444.00
1,023.00

1 m Langit - langit Plywood ( 60 x 120 )cm, tebal 4 mm


Bahan
Plywood 4 mm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

22,874.50

1,925
3,850
440
193
16,467.00

0.360
0.030

6,407.50

15,444.00
1,023.00

1 m Langit - langit Plywood ( 30 x 60 )cm, tebal 6 mm


Bahan
Plywood 4 mm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

106,810.00

1,650
3,850
440
165
16,467.00

0.360
0.030

6,105.00

99,000.00
1,705.00

1 m Langit - langit Plywood ( 30 x 60 )cm, tebal 4 mm


Bahan
Plywood 4 mm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

320,430.00

1,650
3,850
440
165
100,705.00

1.500
0.050

6,105.00

312,620.00
1,705.00

1 m Langit - langit Akustik ( 60 x 120 )cm


Bahan
Akustik Arm Strong Ukuran 30 x 120 cm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

577,918.00

1,650
4,620
528
165
314,325.00

5.800
0.050

6,963.00

569,250.00
1,705.00

1 m Langit - langit Akustik ( 30 x 60 )cm


Bahan
Akustik 30 x 60 cm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

46,601.50

825
2,695
308
83
570,955.00

11.500
0.050

3,910.50

42,350.00
341.00

1 m Langit - langit Akustik ( 30 x 30 )cm


Bahan
Akustik 30 x 30 cm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

46,601.50

825
2,695
308
83
42,691.00

1.100
0.010

3,910.50

42,350.00
341.00

1 m Langit - langit Asbes ( 1.00 x 1.00 )m tebal 3.5 mm


Bahan
Pelat Asbes tebal 4 mm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

825
2,695
308
83

42,900.00
34,100.00

6,407.50

15,444.00
1,023.00
27,500.00
38,500.00
44,000.00
55,000.00

1,925
3,850
440
193

22,874.50

1 m Langit - langit Plywood ( 60 x 120 )cm, tebal 6 mm


Bahan
Plywood 4 mm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

16,467.00
0.360
0.030

lbr
Kg

0.070
0.100
0.010
0.0035

Oh
Oh
Oh
Oh

42,900.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

lbr
Kg

0.070
0.100
0.010
0.0035

Oh
Oh
Oh
Oh

82,500.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

lbr
Kg

0.070
0.100
0.010
0.0035

Oh
Oh
Oh
Oh

0.360
0.030

lbr
Kg

0.070
0.100
0.010
0.0035

Oh
Oh
Oh
Oh

0.024
0.010
0.050

m3
Kg
Kg

0.200
0.600
0.060
0.0100

Oh
Oh
Oh
Oh

82,500.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

27,500.00
38,500.00
44,000.00
55,000.00

27,500,000.00
34,100.00
34,100.00

0.200
0.600
0.060
0.0100

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

73,260.00
34,100.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

lbr
Kg
Kg

0.200
0.600
0.060
0.0100

Oh
Oh
Oh
Oh

2,035,000.00
34,100.00
34,100.00

lbr
Kg

0.600
0.100
0.010
0.0030

Oh
Oh
Oh
Oh

35,594.24

5,500
23,100
2,640
550

27,500.00
38,500.00
44,000.00
55,000.00

31,790.00

82,676.00

5,500
23,100
2,640
550
33,748.00

0.350
0.030

31,790.00

48,840.00
341.00
1,705.00

1 m Langit - langit Softboard


Bahan
Softboard 4' x 8' x 4mm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

5,500
23,100
2,640
550

50,886.00
0.024
0.010
0.050

693,836.00

1,758.24
341.00
1,705.00

1 m Langit - langit Kayu Kamper


Bahan
Papan Kayu Kamper
Paku
Paku Sekrup
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

31,790.00

660,000.00
341.00
1,705.00

3,804.24
lbr
Kg
Kg

34,430.50

1,925
3,850
440
193
662,046.00

0.024
0.010
0.050

6,407.50

27,000.00
1,023.00

1 m Langit - langit Kayu Ramin


Bahan
Papan Kayu Ramin
Paku
Paku Sekrup
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

37,130.50

1,925
3,850
440
193
28,023.00

75,000.00
34,100.00

1 m Langit - langit Kayu Jati


Bahan
Papan Kayu Jati
Paku
Paku Sekrup
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

6,407.50

29,700.00
1,023.00

1 m Langit - langit Gypsum


Bahan
Gypsum
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

37,130.50

1,925
3,850
440
193
30,723.00

0.360
0.030

6,407.50

29,700.00
1,023.00

1 m Langit - langit Teakwood ( 60 x 120 )cm, tebal 4 mm


Bahan
Teakwood 4' x 8' x 4mm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1,925
3,850
440
193
30,723.00

0.360
0.030

22,874.50

15,444.00
1,023.00

1 m Langit - langit Teakwood ( 30 x 60 )cm, tebal 4 mm


Bahan
Teakwood 4' x 8' x 4mm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

6,407.50

93,500.00
34,100.00

20,955.00

32,725.00
1,023.00
27,500.00
38,500.00
44,000.00
55,000.00

16,500
3,850
440
165

54,703.00

1 m Langit - langit Akustik 60 x 120 cm + rangka Alluminium


Bahan
Profil Alluminium " T "
Kawat seng polos
Ramset / Dinabolt
Akustik Armstrom 60 x 120cm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

379,885.00

3.600
0.150
1.000
1.500

m'
Kg
bh
lbr

0.150
0.500
0.050
0.0075

Oh
Oh
Oh
Oh

71,500.00
20,900.00
12,100.00
71,500.00
27,500.00
38,500.00
44,000.00
55,000.00

m'
Kg

0.050
0.050
0.005
0.0030

Oh
Oh
Oh
Oh

14,300.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

m3
Kg
lbr

0.270
0.400
0.040
0.0135

Oh
Oh
Oh
Oh

1,600,000.00
34,100.00
42,900.00

0.012
0.060
1.100

m3
Kg
lbr

0.180
0.320
0.032
0.0090

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

1,600,000.00
34,100.00
19,800.00

m3
Kg
lbr

0.260
0.400
0.040
0.0130

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

1,600,000.00
34,100.00
53,900.00

IX

PEKERJAAN SANITASI
Memasang 1 buah Kloset Duduk / Monoblok
Bahan
Kloset Duduk / Monoblok
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 buah Kloset Jongkok Porselen
Bahan
Kloset Jongkok Porselen
Semen Portland
Pasir Pasang
Tenaga
Perkerja

4,950
12,320
1,408
495

27,500.00
38,500.00
44,000.00
55,000.00

m3
Kg
lbr

0.310
0.470
0.047
0.0155

Oh
Oh
Oh
Oh

1,600,000.00
34,100.00
49,500.00

3.300
1.100
0.001
0.1600

Oh
Oh
Oh
Oh

1.000
6.000
0.010

bh
Kg
m3

1.000

Oh

376,491.00

29,540.50

644,036.50

43,200.00
2,046.00
569,250.00
27,500.00
38,500.00
44,000.00
55,000.00

8,525
18,095
2,068
853

1,859,000.00
1.000
bh
30% Dari bahan

25,025.00

7,150
15,400
1,760
715
614,496.00

0.027
0.060
11.500

62,199.00

36,800.00
2,046.00
312,620.00

1 m Langit - langit Akustik ( 30 x 30 )cm + Rangka Kayu Borneo


Bahan
Balok Kayu Borneo
Paku
Akustik 30 x 30 cm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

19,173.00

19,200.00
2,046.00
21,780.00

351,466.00

0.023
0.060
5.800

80,904.50

7,425
15,400
1,760
743
43,026.00

1 m Langit - langit Akustik ( 30 x 60 )cm + Rangka Kayu Borneo


Bahan
Balok Kayu Borneo
Paku
Akustik 30 x 60 cm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

25,327.50

36,800.00
2,046.00
16,731.00

1 m Langit - langit Asbes ( 1.00 x 1.00 )m, tebal 3.2mm Rangka Borneo
Bahan
Balok Kayu Borneo
Paku
Asbes
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

19,756.00

1,375
1,925
220
165
55,577.00

0.023
0.060
0.390

3,685.00

15,730.00
341.00

1 m Langit - langit Plywood 4 mm + RangkaKayu Borneo


Bahan
Balok Kayu Borneo
Paku
Plywood 4 mm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

4,125
19,250
2,200
413
16,071.00

1.100
0.010

405,872.50

257,400.00
3,135.00
12,100.00
107,250.00

1 m List Langit - langit Kayu Profil


Bahan
List Kayu Profil
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

25,987.50

1,430,000.00
429,000.00

138,919.00

1,997,919.00

1,430,000.00
429,000.00
27,500.00
35,750.00
44,000.00
55,000.00

90,750
39,325
44
8,800
173,750.00

165,000.00
1,100.00
215,000.00

155,925.00

165,000.00
6,600.00
2,150.00
27,500.00

27,500

329,675.00

Tukang Batu
Kepala Tukang
Mandor
Memasang 1 buah Kloset Jongkok Teraso
Bahan
Kloset Jongkok Teraso
Bata merah kelas I
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 buah Urinoir
Bahan
Urinoir
Perlengkapan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 buah Wastafel
Bahan
Urinoir
Perlengkapan
Semen Abu -abu
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1.500
1.500
0.1600

Oh
Oh
Oh

1.000
7.000
6.000
0.010

bh
bh
Kg
m3

1.000
1.500
0.300
0.1100

Oh
Oh
Oh
Oh

35,750.00
44,000.00
55,000.00
117,485.00
104,500.00
605.00
1,100.00
215,000.00
27,500.00
35,750.00
44,000.00
55,000.00

1.000
1.000
0.100
0.1000

495,000.00
148,500.00
1,100.00
215,000.00

Oh
Oh
Oh
Oh

1.000
1.450
0.150
0.1000

Oh
Oh
Oh
Oh

1.000
6.000
0.010

bh
Kg
m3

2.100
0.750
0.070
0.1100

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

495,000.00
59,400.00
1,100.00
215,000.00
27,500.00
35,750.00
44,000.00
55,000.00

132,000.00
1,100.00
215,000.00
27,500.00
35,750.00
44,000.00
55,000.00

198,000.00
35,640.00

Oh
Oh
Oh
Oh

Memasang 1 buah Badkip Porselen


Bahan
Badkip
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

m3
Kg
m3
bh
Kg

6.000
3.000
0.300
0.3000

Oh
Oh
Oh
Oh

0.075
0.750
0.2500

Oh
Oh
Oh
Oh

234,442.50

175,835.00

409,475.00

198,000.00
35,640.00
27,500.00
35,750.00
44,000.00
55,000.00

49,500
96,525
23,760
6,050

605.00
1,100.00
215,000.00
598.95
1,320.00

301,950.00

722,234.00

242.00
132,000.00
64,500.00
215,622.00
7,920.00
27,500.00
35,750.00
44,000.00
55,000.00

165,000
107,250
13,200
16,500
858,000.00

1.000
bh
20% harga Badkip

93,692.50

57,750
26,813
3,080
6,050

420,284.00
0.400
120.000
0.300
360.000
6.000

654,587.50

27,500
51,838
6,600
5,500

233,640.00

1.800
2.700
0.540
0.1100

91,437.50

132,000.00
6,600.00
2,150.00

Memasang 1 buah Bak Mandi Batu bata, volume 0.30 m


Bahan
Bata merah kelas I
Semen Portland
Pasir Pasang
Porselen ( 11 x 11 ) cm
Semen Nat
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

27,500
35,750
4,400
5,500

140,750.00

1.000
bh
18% Harga Bak

725,400.00

495,000.00
59,400.00
6,600.00
2,150.00

Memasang 1 buah Bak Mandi Fiberglass, volume 0.30 m


Bahan
Bak Fiberglass
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

73,150.00

495,000.00
148,500.00
6,600.00
2,150.00

563,150.00
1.000
bh
12% Harga Urinoir
6.000
Kg
0.010
m3

217,860.00

27,500
53,625
13,200
6,050
652,250.00

1.000
bh
30% Harga Urinoir
6.000
Kg
0.010
m3

100,375.00

104,500.00
4,235.00
6,600.00
2,150.00

Memasang 1 buah Bak Mandi Teraso, volume 0.30 m


Bahan
Bak Teraso
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

53,625
66,000
8,800

715,000.00
143,000.00

#VALUE!

715,000.00
143,000.00
27,500.00
35,750.00
44,000.00
55,000.00

#VALUE!
2,681
33,000
13,750

#VALUE!

Memasang 1 buah Bak Fiberglass volume 1 m air


Bahan
Bak Fiberglass
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

221,760.00
1.000
bh
12% Harga Bak
3.000
4.500
0.900
0.9000

198,000.00

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

bh
Kg
m3
m3

0.060
0.030
0.003
0.0025

Oh
Oh
Oh
Oh

93,500.00
1,100.00
215,000.00
88,000.00
27,500.00
35,750.00
44,000.00
55,000.00

bh
Kg
m3
m3

0.080
0.040
0.004
0.0070

Oh
Oh
Oh
Oh

93,500.00
1,100.00
215,000.00
88,000.00
27,500.00
35,750.00
44,000.00
55,000.00

bh
m3
Kg
m3
m3

0.140
0.070
0.007
0.0070

Oh
Oh
Oh
Oh

88,000.00
605.00
1,100.00
215,000.00
88,000.00
27,500.00
35,750.00
44,000.00
55,000.00

bh
m3
Kg
m3
m3

0.380
0.190
0.019
0.0190

Oh
Oh
Oh
Oh

Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t = 35cm
Bahan
Bata merah kelas I
0.145
m3
Semen Portland
44.000
Kg
Pasir Pasang
0.070
m3
Batu Kerikil
0.070
m3
Besi Beton
1.600
Kg
Pasir Beton
0.060
m3
Tenaga
Perkerja
3.200
Oh
Tukang Batu
1.015
Oh
Kepala Tukang
0.0015
Oh
Mandor
0.0160
Oh
Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50cm
Bahan
Bata merah kelas I
0.250
m3
Semen Portland
77.000
Kg
Pasir Pasang
0.130
m3
Batu Kerikil
0.020
m3
Besi Beton
2.600
Kg
Pasir Beton
0.090
m3
Tenaga

88,000.00
605.00
1,100.00
215,000.00
88,000.00

19,123.50

146,773.25

96,800.00
332.75
11,330.00
13,115.00
6,072.00
27,500.00
35,750.00
44,000.00
55,000.00

10,450
6,793
836
1,045
121,287.73

605.00
1,100.00
215,000.00
275,000.00
16,000.00
215,000.00

125,232.25

246,519.98

87.73
48,400.00
15,050.00
19,250.00
25,600.00
12,900.00
27,500.00
35,750.00
44,000.00
55,000.00

88,000
36,286
66
880
179,251.25

605.00
1,100.00
215,000.00
275,000.00
16,000.00
215,000.00

122,472.85

3,850
2,503
308
385
127,649.75

1.100
0.550
10.300
0.061
0.069

7,045.50

96,800.00
163.35
4,312.00
12,040.00
2,112.00

Memasang 1 m' Pipa Beton 30 cm - 100 cm


Bahan
Pipa Beton
Bata merah kelas I
Semen Portland
Pasir Pasang
Pasir Urug
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

158,990.00

2,200
1,430
176
385
115,427.35

1.100
0.270
3.920
0.056
0.024

4,191.00

149,600.00
957.00
3,010.00
1,232.00

Memasang 1 m' Pipa Beton 5 cm - 20 cm


Bahan
Pipa Beton
Bata merah kelas I
Semen Portland
Pasir Pasang
Pasir Urug
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

157,103.00

1,650
1,073
132
138
154,799.00

1.600
0.870
0.014
0.014

2,992.00

149,600.00
748.00
2,795.00
968.00

Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa Tanah 20 cm


Bahan
Pipa Tanah
Semen Portland
Pasir Pasang
Pasir Urug
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

82,500
160,875
39,600
49,500
154,111.00

1.600
0.680
0.013
0.011

554,235.00

198,000.00
23,760.00

Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa Tanah 15 cm


Bahan
Pipa Tanah
Semen Portland
Pasir Pasang
Pasir Urug
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

332,475.00

151.25
84,700.00
27,950.00
5,500.00
41,600.00
19,350.00

61,932.75

241,184.00

Perkerja
Tukang Batu
Kepala Tukang
Mandor

1.420
0.473
0.0470
0.0710

Oh
Oh
Oh
Oh

Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (60 x 60 )cm, t = 65cm
Bahan
Bata merah kelas I
0.371
m3
Semen Portland
114.000
Kg
Pasir Pasang
0.184
m3
Batu Koral
0.033
m3
Besi Beton
4.850
Kg
Pasir Beton
0.120
m3
Tenaga
Perkerja
2.160
Oh
Tukang Batu
0.720
Oh
Kepala Tukang
0.0720
Oh
Mandor
0.1080
Oh
Tukang Gali
0.1000
Oh

27,500.00
35,750.00
44,000.00
55,000.00
277,659.46
605.00
1,100.00
215,000.00
275,000.00
16,000.00
215,000.00
27,500.00
35,750.00
44,000.00
55,000.00
33,000.00

0.054
0.090
0.0090
0.0270

130,000.00
45,500.00

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

0.054
0.090
0.0090
0.0270

130,000.00
45,500.00

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

0.054
0.090
0.0090
0.0270

130,000.00
45,500.00

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

0.108
0.180
0.0180
0.0054

130,000.00
45,500.00

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

0.108
0.180
0.0180
0.0054

130,000.00
45,500.00

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

0.135
0.225
0.0225
0.0068

18,333.33
6,416.67

Oh
Oh
Oh
Oh

Bahan
Pipa PVC D 1/2"
Perlengkapan

2,524.50
883.58

41,536.92

3,713
8,044
990
374
3,912.98

1.200
m'
35% Harga Pipa

13,120.25

22,000.00
6,416.67
27,500.00
35,750.00
44,000.00
55,000.00

Memasang 1 m' Pipa PVC tipe AW "

#VALUE!

2,970
6,435
792
297
28,416.67

1.200
m'
35% Harga Pipa

10,494.00

156,000.00
#VALUE!

Memasang 1 m' Pipa Galvanis 4"


Bahan
Pipa Galvanis D 4"
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

211,994.00

2,970
6,435
792
297
#VALUE!

1.200
m'
35% Harga Pipa

10,494.00

156,000.00
45,500.00

Memasang 1 m' Pipa Galvanis 3"


Bahan
Pipa Galvanis
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

208,083.50

1,485
3,218
396
1,485
201,500.00

1.200
m'
35% Harga Pipa

6,583.50

156,000.00
45,500.00

Memasang 1 m' Pipa Galvanis 1"


Bahan
Pipa Galvanis
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

208,083.50

1,485
3,218
396
1,485
201,500.00

1.200
m'
35% Harga Pipa

6,583.50

156,000.00
45,500.00

Memasang 1 m' Pipa Galvanis 1"


Bahan
Pipa Galvanis
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

208,083.50

1,485
3,218
396
1,485
201,500.00

1.200
m'
35% Harga Pipa

6,583.50

156,000.00
45,500.00

Memasang 1 m' Pipa Galvanis "


Bahan
Pipa Galvanis
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

375,207.46

59,400
25,740
3,168
5,940
3,300
201,500.00

1.200
m'
35% Harga Pipa

97,548.00

224.46
125,400.00
39,560.00
9,075.00
77,600.00
25,800.00

Memasang 1 m' Pipa Galvanis "


Bahan
Pipa Galvanis
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

39,050
16,910
2,068
3,905

3,029.40
883.58

3,498.00

7,410.98

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.036
0.060
0.0060
0.0018

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

Memasang 1 m' Pipa PVC tipe AW "


Bahan
Pipa PVC tipe AW "
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

6,146.53
1.200
m'
35% Harga Pipa
0.036
0.060
0.0060
0.0018

3,965.50
1,387.93

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

0.036
0.060
0.0060
0.0018

5,445.00
1,905.75

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

0.036
0.060
0.0060
0.0018

18,469.00
6,464.15

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

0.054
0.090
0.0090
0.0027

20,047.50
7,016.63

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

0.036
0.060
0.0060
0.0018

33,000.00
11,550.00

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

0.081
0.135
0.0135
0.0041

39,847.50
13,946.63

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

Memasang 1 bh Bak Cuci Piring Stainles Steel


Bahan
Bak cuci Stainless steel
Water Drain + Asesories
Tenaga
Perkerja
Tukang Batu
Kepala Tukang

0.081
0.135
0.0135
0.0041

58,300.00
20,405.00

Oh
Oh
Oh
Oh

bh
set

0.030
0.300
0.0300

Oh
Oh
Oh

7,873.25

98,238.25

69,960.00
20,405.00
27,500.00
35,750.00
44,000.00
55,000.00

2,228
4,826
594
226
566,500.00

1.000
1.000

69,636.88

2,228
4,826
594
226
90,365.00

1.200
m'
35% Harga Pipa

7,873.25

47,817.00
13,946.63

Memasang 1 m' Pipa PVC tipe AW 4"


Bahan
Pipa PVC tipe AW 4"
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

54,648.00

990
2,145
264
99
61,763.63

1.200
m'
35% Harga Pipa

3,498.00

39,600.00
11,550.00

Memasang 1 m' Pipa PVC tipe AW 3"


Bahan
Pipa PVC tipe AW 3"
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

36,320.63

1,485
3,218
396
149
51,150.00

1.200
m'
35% Harga Pipa

5,247.00

24,057.00
7,016.63

Memasang 1 m' Pipa PVC tipe AW 2"


Bahan
Pipa PVC tipe AW 2"
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

32,124.95

990
2,145
264
99
31,073.63

1.200
m'
35% Harga Pipa

3,498.00

22,162.80
6,464.15

Memasang 1 m' Pipa PVC tipe AW 2"


Bahan
Pipa PVC tipe AW 2"
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

11,937.75

990
2,145
264
99
28,626.95

1.200
m'
35% Harga Pipa

3,498.00

6,534.00
1,905.75

Memasang 1 m' Pipa PVC tipe AW 1"


Bahan
Pipa PVC tipe AW 1"
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

9,644.53

990
2,145
264
99
8,439.75

1.200
m'
35% Harga Pipa

3,498.00

4,758.60
1,387.93

Memasang 1 m' Pipa PVC tipe AW 1"


Bahan
Pipa PVC tipe AW 1"
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

990
2,145
264
99

495,000.00
71,500.00

12,952.50

495,000.00
71,500.00
27,500.00
35,750.00
44,000.00

825
10,725
1,320

579,452.50

Mandor
Memasang 1 bh Bak Cuci Piring Teraso
Bahan
Bak cuci Teraso
Water Drain + Asesories
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.0015

Oh

55,000.00
489,250.00

1.000
1.000
20.000
0.050

bh
set
Kg
m3

0.050
0.500
0.0500
0.0025

Oh
Oh
Oh
Oh

1.000
0.025

bh
bh

0.010
0.100
0.0100
0.0050

Oh
Oh
Oh
Oh

385,000.00
71,500.00
1,100.00
215,000.00

Memasang 1 bh Floor Drain


Bahan
Kran Air
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

27,500.00
35,750.00
44,000.00
55,000.00

VII

PEKERJAAN BESI DAN ALLUMINIUM


1 Kg Pasang Rangka Atap Baja
Bahan
Besi Profil WF
Meni Besi
Tenaga
Perkerja
Tukang Besi
Kepala Tukang
Mandor

33,000.00
4,950.00

0.010
0.100
0.0100
0.0050

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

Kg
Kg

0.006
0.060
0.0060
0.0003

Oh
Oh
Oh
Oh

33,000.00
27,500.00
35,750.00
44,000.00
55,000.00

m2

0.650
0.650
0.0650
0.0320

Oh
Oh
Oh
Oh

19,800.00
16,500.00
27,500.00
35,750.00
44,000.00
55,000.00

m2

1.050
1.050
0.1050
0.00525

Oh
Oh
Oh
Oh

495,000.00
27,500.00
38,500.00
44,000.00
55,000.00

m2

1.022
1.200
0.1200
0.0060

Oh
Oh
Oh
Oh

495,000.00
27,500.00
38,500.00
44,000.00
55,000.00

m2

1.200
1.200
0.1200
0.0060

Oh
Oh
Oh
Oh

715,000.00

Bahan
Pintu Lipat
Tenaga

m2

495,000.00

84,810.00

579,810.00

495,000.00
27,500.00
38,500.00
44,000.00
55,000.00

715,000.00

794,915.00

28,105
46,200
5,280
330

33,000
46,200
5,280
330
715,000.00

1.000

79,915.00

715,000.00
27,500.00
38,500.00
44,000.00
55,000.00

1 m Pasang Pintu Lipat

569,208.75

28,875
40,425
4,620
289

495,000.00
1.000

74,208.75

495,000.00

1 m Pasang Pintu gulung besi


Bahan
Pintu gulung besi
Tenaga
Perkerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor

542,520.00

17,875
25,025
2,860
1,760

715,000.00
1.000

47,520.00

495,000.00

1 m Pasang Jendela Besi Tahan Api


Bahan
Jendela Besi Tahan Api
Tenaga
Perkerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor

25,690.50

165
2,145
264
17

495,000.00
1.000

2,590.50

21,780.00
1,320.00

1 m Pasang Jendela Besi


Bahan
Jendela Besi
Tenaga
Perkerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor

37,565.00

275
3,575
440
275

495,000.00
1.000

4,565.00

33,000.00

1 m Pasang Pintu Besi Baja


Bahan
Pintu Besi Baja
Tenaga
Perkerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor

37,688.75

275
3,575
440
275

23,100.00
1.100
0.080

4,565.00

33,000.00
123.75

33,000.00
bh

510,837.50

1,375
17,875
2,200
138
33,123.75

1.000

21,587.50

385,000.00
71,500.00
22,000.00
10,750.00

Memasang 1 bh Kran " atau "


Bahan
Kran Air
Seal tape
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

83

715,000.00

74,206.00

789,206.00

Perkerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor

1.050
1.050
0.1050
0.0052

Oh
Oh
Oh
Oh

1.000

m2

0.080
0.800
0.080
0.004

Oh
Oh
Oh
Oh

1.000

m2

1.050
1.500
0.105
0.0052

Oh
Oh
Oh
Oh

1.000

m2

1.050
1.050
0.105
0.0052

Oh
Oh
Oh
Oh

1.000

m2

0.350
0.350
0.035
0.00175

Oh
Oh
Oh
Oh

1.000

m2

0.350
0.350
0.035
0.00175

Oh
Oh
Oh
Oh

11.500

m'

1.200
1.200
0.012
0.0006

Oh
Oh
Oh
Oh

1.100
0.020
0.0018

m2
Kg
m3

0.100
0.100
0.010
0.0005

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

1 m Pasang Pintu Suncreen Allumunium


Bahan
Suncreen Allumunium
Tenaga
Perkerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor

385,000.00
385,000.00
27,500.00
38,500.00
44,000.00
55,000.00

27,500.00
38,500.00
44,000.00
55,000.00

27,500.00
38,500.00
44,000.00
55,000.00

Papan Kayu Kamper


Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

27,500.00
38,500.00
44,000.00
55,000.00

143,000.00

Papan Kayu Kamper


Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

27,500.00
38,500.00
44,000.00
55,000.00

17,600.00

1 m Pasang Kawat Kassa


Bahan

79,761.00

282,161.00

202,400.00
27,500.00
38,500.00
44,000.00
55,000.00

33,000
46,200
528
33

176,000.00
34,100.00
2,035,000.00

7,067.50

205,012.50

193,600.00
682.00
3,663.00
27,500.00
38,500.00
44,000.00
55,000.00

2,750
3,850
440
28
52,745.00

Oh
Oh
Oh
Oh

167,736.25

9,625
13,475
1,540
96

197,945.00

0.100
0.100
0.010
0.0005

24,736.25

143,000.00

202,400.00

m2
Kg
m3

167,736.25

9,625
13,475
1,540
96
143,000.00

1.100
0.020
0.0018

24,736.25

143,000.00

1 m Pasang Kawat Nyamuk


Bahan
Kawat Nyamuk
Paku Biasa " - 1"

459,206.00

28,875
40,425
4,620
286
143,000.00

143,000.00

1 m Pasang Kawat Harmonika


Bahan
Kawat Harmonika
Paku Biasa " - 1"

74,206.00

385,000.00

1 m Pasang Terali Besi


Bahan
Terali Besi 2 x 3
Tenaga
Perkerja
Tukang Las
Kepala Tukang
Mandor

806,531.00

28,875
57,750
4,620
286
385,000.00

385,000.00

1 m Pasang Vertikals Blinds


Bahan
Venetions Blinds
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

91,531.00

715,000.00

1 m Pasang Venetions Blinds


Bahan
Venetions Blinds
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

421,740.00

2,200
30,800
3,520
220
715,000.00

715,000.00

1 m Pasang Pintu Allumunium


Bahan
Pintu Allumunium
Tenaga
Perkerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor

36,740.00

385,000.00

1 m Pasang Rolling Door


Bahan
Rolling Door
Tenaga
Perkerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor

28,875
40,425
4,620
286

44,000.00
34,100.00
2,035,000.00

7,067.50

59,812.50

48,400.00
682.00
3,663.00
27,500.00
38,500.00
44,000.00
55,000.00

2,750
3,850
440
28

76,945.00

7,067.50

84,012.50

Kawat Kassa
Paku Biasa " - 1"
Papan Kayu Kamper
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1.100
0.020
0.0018

m2
Kg
m3

0.100
0.100
0.010
0.0005

Oh
Oh
Oh
Oh

66,000.00
34,100.00
2,035,000.00

72,600.00
682.00
3,663.00
27,500.00
38,500.00
44,000.00
55,000.00

1 m Pasang Kawat Burung


Bahan
Kawat Burung
Paku Biasa " - 1"
Papan Kayu Kamper
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

46,695.00
1.100
0.020
0.0018

m2
Kg
m3

0.100
0.100
0.010
0.0005

Oh
Oh
Oh
Oh

38,500.00
34,100.00
2,035,000.00

Besi Strip
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

27,500.00
38,500.00
44,000.00
55,000.00

m2
Kg
m2

0.200
0.200
0.020
0.0010

Oh
Oh
Oh
Oh

0.500
0.015
0.0096
0.2500

Lbr
Kg
m3
Kg

0.150
0.400
0.025
0.00125

Oh
Oh
Oh
Oh

9,900.00
34,100.00
11,550.00

Papan Kayu Borneo


Flincote / Meni Besi
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

27,500.00
38,500.00
44,000.00
55,000.00

Papan Kayu Borneo


Flincote / Meni Besi
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

Lbr
Kg
m3
Kg

0.040
0.400
0.025
0.00125

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

38,500.00
34,100.00
2,035,000.00
28,600.00

Papan Kayu Borneo


Besi Strip
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

27,500.00
38,500.00
44,000.00
55,000.00

Lbr
Kg
m3
Kg

0.150
0.250
0.025
0.00125

Oh
Oh
Oh
Oh

0.300
0.100
0.0190
0.5000

Lbr
Kg
m3
Kg

0.150
0.250
0.025
0.00125

Oh
Oh
Oh
Oh

49,500.00
34,100.00
2,035,000.00
11,550.00

Papan Kayu Borneo


Besi Strip
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
VI

PEKERJAAN KUNCI DAN KACA


1 Buah Pasang Kunsi Tanam Antik
Bahan
Kunsi Tanam Antik
Tenaga

27,500.00
38,500.00
44,000.00
55,000.00

33,000.00
34,100.00
2,035,000.00
11,550.00

77,618.75

14,918.75

72,668.75

9,900.00
3,410.00
38,665.00
5,775.00
27,500.00
38,500.00
44,000.00
55,000.00

220,000.00

14,918.75

4,125
9,625
1,100
69

4,125
9,625
1,100
69

220,000.00
Bh

84,675.25

1,100
15,400
1,100
69

57,750.00

1.000

17,668.75

14,850.00
3,410.00
38,665.00
5,775.00

1 m Pasang Talang Lingkaran 10 cm, Seng BJLS 24


Bahan
Seng Plat 3 x 6 BJLS 24
Paku Biasa " - 1" atau Sekrup

4,125
15,400
1,100
69

62,700.00
0.300
0.100
0.0190
0.5000

67,141.25

19,250.00
511.50
38,665.00
8,580.00

1 m Pasang Talang Lingkaran 10 cm, Seng BJLS 28


Bahan
Seng Gelombang 3" x 6" BJLS 28
Paku Biasa " - 1" atau Sekrup

20,693.75

19,250.00
511.50
19,536.00
7,150.00

67,006.50
0.500
0.015
0.0190
0.3000

25,995.75

5,500
7,700
880
55
46,447.50

38,500.00
34,100.00
2,035,000.00
28,600.00

1 m Pasang Talang Miring , Seng BJLS 28


Bahan
Seng Plat 3" x 6" BJLS 28
Paku Biasa " - 1" atau Sekrup

14,135.00

10,890.00
682.00
288.75

1 m Pasang Talang Datar , Seng BJLS 28


Bahan
Seng Plat 3" x 6" BJLS 28
Paku Biasa " - 1" atau Sekrup

53,762.50

2,750
3,850
440
28
11,860.75

1.100
0.020
0.0250

7,067.50

42,350.00
682.00
3,663.00

1 m Pasang Jendela Nako & Tralis


Bahan
Jendela Nako
Paku Biasa " - 1" atau Sekrup

2,750
3,850
440
28

220,000.00

27,555.00

247,555.00

Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kunsi Tanam Biasa
Bahan
Kunsi Tanam Biasa
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kunsi Tanam Kamar Mandi
Bahan
Kunsi Tanam Kamar Mandi
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kunsi Silinder
Bahan
Kunsi Silinder
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Engsel Pintu
Bahan
Engsel Pintu
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Engsel Jendela Kupu - kupu
Bahan
Engsel Jendela
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Engsel Angin
Bahan
Engsel Angin
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Spring Knip
Bahan
Spring Knip
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kait angin
Bahan
Kait Angin
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Door Closer
Bahan
Door Closer
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang

0.060
0.600
0.060
0.003

Oh
Oh
Oh
Oh

1.000

Bh

0.010
0.500
0.010
0.005

Oh
Oh
Oh
Oh

1.000

Bh

0.005
0.500
0.005
0.0025

Oh
Oh
Oh
Oh

1.000

Bh

0.005
0.500
0.005
0.00025

Oh
Oh
Oh
Oh

1.000

Bh

0.015
0.150
0.015
0.00075

Oh
Oh
Oh
Oh

1.000

Bh

0.010
0.100
0.010
0.00050

Oh
Oh
Oh
Oh

1.000

Bh

0.020
0.200
0.020
0.01000

Oh
Oh
Oh
Oh

1.000

Bh

0.015
0.150
0.015
0.00075

Oh
Oh
Oh
Oh

1.000

Bh

0.015
0.150
0.015
0.00075

Oh
Oh
Oh
Oh

1.000

Bh

0.050
0.500
0.050

Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

1,650
23,100
2,640
165
99,000.00

99,000.00

20,240.00

119,240.00

99,000.00
27,500.00
38,500.00
44,000.00
55,000.00

275
19,250
440
275
132,000.00

132,000.00

19,745.00

151,745.00

132,000.00
27,500.00
38,500.00
44,000.00
55,000.00

138
19,250
220
138
165,000.00

165,000.00

19,621.25

184,621.25

165,000.00
27,500.00
38,500.00
44,000.00
55,000.00

138
19,250
220
14
30,250.00

30,250.00

6,888.75

37,138.75

30,250.00
27,500.00
38,500.00
44,000.00
55,000.00

413
5,775
660
41
27,500.00

27,500.00

4,592.50

32,092.50

27,500.00
27,500.00
38,500.00
44,000.00
55,000.00

275
3,850
440
28
33,000.00

33,000.00

9,680.00

42,680.00

33,000.00
27,500.00
38,500.00
44,000.00
55,000.00

550
7,700
880
550
3,850.00

3,850.00

6,888.75

10,738.75

3,850.00
27,500.00
38,500.00
44,000.00
55,000.00

413
5,775
660
41
38,500.00

38,500.00

6,888.75

45,388.75

38,500.00
27,500.00
38,500.00
44,000.00
55,000.00

413
5,775
660
41
165,000.00

165,000.00

22,962.50

165,000.00
27,500.00
38,500.00
44,000.00

1,375
19,250
2,200

187,962.50

Mandor
1 Buah Pasang Kunci Selot
Bahan
Kunci Selot
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Pegangan Pintu / Door Holder
Bahan
Door Holder
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Door Stop
Bahan
Door Stop
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Rel Pintu Dorong
Bahan
Rel Pintu Dorong
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kunci Lemari
Bahan
Kunci Lemari
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca tebal 3 mm
Bahan
Kaca Polos
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca tebal 5 mm
Bahan
Kaca Polos
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca tebal 8 mm
Bahan
Kaca Polos
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca Buram tebal 12 mm
Bahan
Kaca Buram
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca Cermin tebal 5 mm

0.00250

Oh

55,000.00

138
22,000.00

1.000

Bh

0.020
0.200
0.020
0.001

Oh
Oh
Oh
Oh

22,000.00

Bh

0.050
0.500
0.050
0.0025

Oh
Oh
Oh
Oh

550
7,700
880
55

231,000.00

Bh

0.010
0.100
0.010
0.0005

Oh
Oh
Oh
Oh

Bh

0.060
0.600
0.060
0.0030

Oh
Oh
Oh
Oh

165,000.00

Bh

0.025
0.250
0.025
0.00125

Oh
Oh
Oh
Oh

m2

0.015
0.150
0.015
0.00075

Oh
Oh
Oh
Oh

275,000.00

m2

0.015
0.150
0.015
0.00075

Oh
Oh
Oh
Oh

1.100

m2
Oh
Oh
Oh
Oh

27,500.00

m2

0.0250
0.250
0.0250
0.00125

Oh
Oh
Oh
Oh

11,481.25

38,981.25

27,500.00
27,500.00
38,500.00
44,000.00
55,000.00

688
9,625
1,100
69

71,500.00

6,888.75

85,538.75

78,650.00
27,500.00
38,500.00
44,000.00
55,000.00

413
5,775
660
41

71,500.00

6,888.75

85,538.75

78,650.00
27,500.00
38,500.00
44,000.00
55,000.00

413
5,775
660
41

71,500.00

7,576.25

86,226.25

78,650.00
27,500.00
38,500.00
44,000.00
55,000.00

454
6,353
726
44
102,850.00

1.100

302,555.00

1,650
23,100
2,640
165

78,650.00

0.0165
0.165
0.0165
0.00080

27,555.00

275,000.00
27,500.00
38,500.00
44,000.00
55,000.00

78,650.00
1.100

169,592.50

275
3,850
440
28

78,650.00
1.100

4,592.50

165,000.00
27,500.00
38,500.00
44,000.00
55,000.00

27,500.00
1.000

253,962.50

1,375
19,250
2,200
138

275,000.00
1.000

22,962.50

231,000.00
27,500.00
38,500.00
44,000.00
55,000.00
165,000.00

1.000

31,185.00

22,000.00
27,500.00
38,500.00
44,000.00
55,000.00
231,000.00

1.000

9,185.00

93,500.00

11,481.25

114,331.25

102,850.00
27,500.00
38,500.00
44,000.00
55,000.00

688
9,625
1,100
69
96,800.00

6,888.75

103,688.75

Bahan
Kaca Cermin
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca Cermin tebal 6 mm
Bahan
Kaca Cermin
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca Cermin tebal 8 mm
Bahan
Kaca Cermin
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca Wireglass tebal 5 mm
Bahan
Kaca Wireglass
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca Patri tebal 5 mm
Bahan
Kaca Patri
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
VI

1.100

m2

0.0150
0.150
0.0150
0.00075

Oh
Oh
Oh
Oh

88,000.00

96,800.00
27,500.00
38,500.00
44,000.00
55,000.00
96,800.00

1.100

m2

0.0150
0.150
0.0150
0.00075

Oh
Oh
Oh
Oh

88,000.00
27,500.00
38,500.00
44,000.00
55,000.00

m2

0.0165
0.165
0.0165
0.00080

Oh
Oh
Oh
Oh

88,000.00

m2

0.0150
0.150
0.0150
0.00075

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

m2

0.0150
0.150
0.0150
0.00075

Oh
Oh
Oh
Oh

132,000.00

6.630
9.800
0.0215

bh
Kg
m3

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.2500
0.120
0.0120
0.0125

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00

385,000.00

413
5,775
660
41

27,500.00
38,500.00
44,000.00
55,000.00

bh
Kg
m3

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.2600
0.125
0.0125
0.0130

Oh
Oh
Oh
Oh

6,160.00
1,100.00
215,000.00

27,500.00
35,750.00
44,000.00
55,000.00

bh
Kg
m3

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.2700
0.130
0.0130
0.0135

Oh
Oh
Oh
Oh

3,465.00
1,100.00
215,000.00

bh

1,540.00
1,100.00
215,000.00

69,635.80

13,387.00

68,539.50

40,810.00
11,440.00
2,902.50

27,500.00
35,750.00
44,000.00
55,000.00

6,160.00

12,883.75

7,150
4,469
550
715

7,425
4,648
572
743
55,949.80

6.630

68,623.80

41,129.55
11,000.00
4,622.50

27,500.00
35,750.00
44,000.00
55,000.00

1 m Pasang Lantai Ubin Warna ukuran 40 x 40 cm

12,380.50

6,875
4,290
528
688

55,152.50
26.500
10.400
0.0135

430,388.75

40,840.80
10,780.00
4,622.50

1 m Pasang Lantai Ubin PC Abu - abu ukuran 20 x 20 cm


Bahan
Ubin Abu -abu 20 x 20 cm
Semen Portland
Pasir Pasang

6,888.75

413
5,775
660
41

56,752.05
11.870
10.000
0.0215

152,088.75

423,500.00

1 m Pasang Lantai Ubin PC Abu - abu ukuran 30 x 30 cm


Bahan
Ubin Abu -abu 30 x 30 cm
Semen Portland
Pasir Pasang

6,888.75

145,200.00

56,243.30

Bahan
Ubin Abu -abu 40 x40 cm
Semen Portland
Pasir Pasang

104,376.25

454
6,353
726
44

423,500.00
1.100

7,576.25

96,800.00

145,200.00
1.100

103,688.75

413
5,775
660
41
96,800.00

1.100

6,888.75

96,800.00

PEKERJAAN PENUTUP LANTAI DAN DINDING


1 m Pasang Lantai Ubin PC Abu - abu ukuran 40 x 40 cm

Bahan
Ubin Warna 40 x 40 cm

413
5,775
660
41

40,840.80

12,380.50

68,330.30

Semen Portland
Pasir Pasang
Semen Warna

8.160
0.0230
0.9000

Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.2500
0.120
0.0120
0.0125

Oh
Oh
Oh
Oh

1,100.00
215,000.00
1,320.00

8,976.00
4,945.00
1,188.00

27,500.00
35,750.00
44,000.00
55,000.00

1 m Pasang Lantai Ubin Warna ukuran 30 x 30 cm

6,875
4,290
528
688
56,458.55

Bahan
Ubin Warna 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna

11.870
8.360
0.0230
0.9000

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.2500
0.120
0.0120
0.0125

Oh
Oh
Oh
Oh

Bahan
Ubin Warna 20 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna

26.500
8.760
0.0230
0.9000

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.2700
0.130
0.0130
0.0135

Oh
Oh
Oh
Oh

3,465.00
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

6,875
4,290
528
688
56,579.00

1,540.00
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.2500
0.120
0.0120
0.0125

Oh
Oh
Oh
Oh

Bahan
Ubin Teraso 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna

1.870
10.000
0.0215
1.5400

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.2600
0.125
0.0125
0.0130

Oh
Oh
Oh
Oh

5,280.00
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

2,970.00
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

0.2500
0.120
0.0125
0.0125

Oh
Oh
Oh
Oh

29,920.00
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

bh
Kg
m3
Kg

Tenaga
Perkerja

0.2600

Oh

236,866.60

6,875
4,290
550
688
217,374.60

11.870
10.000
0.0215
1.5000

12,402.50

207,345.60
10,780.00
4,622.50
1,716.00

1 m Pasang Lantai Ubin Granito ukuran 30 x 30 cm


Bahan
Ubin Granito 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna

36,092.95

7,150
4,469
550
715
224,464.10

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

12,883.75

5,553.90
11,000.00
4,622.50
2,032.80

1 m Pasang Lantai Ubin Granito ukuran 40 x 40 cm


bh
Kg
m3
Kg

60,871.00

6,875
4,290
528
688
23,209.20

6.930
9.800
0.0215
1.3000

12,380.50

33,000.00
9,680.00
4,622.50
1,188.00

1 m Pasang Lantai Ubin Teraso ukuran 30 x 30 cm

Bahan
Ubin Granito 40 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna

69,966.00

7,425
4,648
572
743
48,490.50

bh
Kg
m3
Kg

13,387.00

40,810.00
9,636.00
4,945.00
1,188.00

1 m Pasang Lantai Ubin Teraso ukuran 40 x 40 cm


6.250
8.800
0.0215
0.9000

68,839.05

41,129.55
9,196.00
4,945.00
1,188.00

1 m Pasang Lantai Ubin Warna ukuran 20 x 20 cm

Bahan
Ubin Teraso 40 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna

12,380.50

16,830.00
1,100.00
215,000.00
1,320.00

12,883.75

199,772.10
11,000.00
4,622.50
1,980.00

27,500.00

7,150

230,258.35

Tukang Batu
Kepala Tukang
Mandor

0.125
0.0125
0.0130

Oh
Oh
Oh

Bahan
Ubin Teralux Kerang 40 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna

6.250
8.800
0.0215
1.3000

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.2500
0.120
0.0120
0.0125

Oh
Oh
Oh
Oh

35,750.00
44,000.00
55,000.00

1 m Pasang Lantai Ubin Teralux Kerang ukuran 40 x 40 cm

98,518.50
13,200.00
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

11.807
10.000
0.0215
1.1250

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.2500
0.120
0.0120
0.0125

Oh
Oh
Oh
Oh

7,425.00
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.2500
0.120
0.0120
0.0125

Oh
Oh
Oh
Oh

47,520.00
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.6720
0.224
0.0220
0.0340

Oh
Oh
Oh
Oh

21,120.00
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.7000
0.340
0.0340
0.0350

Oh
Oh
Oh
Oh

11,880.00
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

bh
Kg
m3

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.0600
0.030
0.0030
0.0030

Oh
Oh
Oh
Oh

1,155.00
1,100.00
215,000.00

bh

1,155.00

11,717.00

1,650
1,073
132
165
6,438.15

3.530

3,019.50

6,121.50
1,716.00
860.00

27,500.00
35,750.00
44,000.00
55,000.00

1 m Pasang Plint Ubin PC Abu - abu ukuran 10 x 30 cm

193,444.10

19,250
12,155
1,496
1,925
8,697.50

5.300
1.560
0.0040

34,826.00

141,015.60
11,000.00
4,622.50
1,980.00

1 m Pasang Plint Ubin PC Abu - abu ukuran 15 x 20 cm


Bahan
Plint Ubin PC Abu - abu 15 x 20 cm
Semen Portland
Pasir Pasang

177,344.50

18,480
8,008
968
1,870
158,618.10

11.870
10.000
0.0215
1.5000

29,326.00

132,000.00
9,680.00
4,622.50
1,716.00

1 m Pasang Lantai Ubin Teralux Marmer ukuran 30 x 30 cm


Bahan
Ubin Teralux Marmer 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna

298,496.50

6,875
4,290
528
688
148,018.50

6.250
8.800
0.0215
1.3000

12,380.50

266,112.00
9,009.00
9,675.00
1,320.00

1 m Pasang Lantai Ubin Teralux Marmer ukuran 40 x 40 cm


Bahan
Ubin Teralux Marmer 40 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna

117,154.98

6,875
4,290
528
688
286,116.00

5.600
8.190
0.0450
1.0000

12,380.50

87,666.98
11,000.00
4,622.50
1,485.00

1 m Pasang Lantai Ubin Teralux Marmer ukuran 60 x 60 cm


Bahan
Ubin Teralux Marmer 60 x 60 cm
Semen Portland
Pasir Pasang
Semen Warna

110,899.00

6,875
4,290
528
688
104,774.48

Bahan
Ubin Teralux Kerang 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna

12,380.50

82,500.00
9,680.00
4,622.50
1,716.00

1 m Pasang Lantai Ubin Teralux Kerang ukuran 30 x 30 cm

Bahan
Plint Ubin PC Abu -abu 10 x 30 cm

4,469
550
715

4,077.15

3,019.50

9,457.65

Semen Portland
Pasir Pasang

1.560
0.0030

Kg
m3

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.0600
0.030
0.0030
0.0030

Oh
Oh
Oh
Oh

1,100.00
215,000.00

1,716.00
645.00

27,500.00
35,750.00
44,000.00
55,000.00

1 m Pasang Plint Ubin PC Abu - abu ukuran 10 x 40 cm

1,650
1,073
132
165
5,859.00

Bahan
Plint Ubin PC Abu - abu 10 x 40 cm
Semen Portland
Pasir Pasang

2.650
1.560
0.0030

bh
Kg
m3

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.0600
0.030
0.0030
0.0030

Oh
Oh
Oh
Oh

1,320.00
1,100.00
215,000.00

27,500.00
35,750.00
44,000.00
55,000.00

1,650
1,073
132
165
6,879.80

5.300
1.200
0.0030
0.1900

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.0600
0.030
0.0030
0.0030

Oh
Oh
Oh
Oh

880.00
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.0600
0.030
0.0030
0.0030

Oh
Oh
Oh
Oh

1,320.00
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.0800
0.040
0.0040
0.0040

Oh
Oh
Oh
Oh

1,760.00
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.0800
0.040
0.0040
0.0040

Oh
Oh
Oh
Oh

1,155.00
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang

0.0800
0.040
0.0040

Oh
Oh
Oh

10,714.95

2,200
1,430
176
220
6,178.00

2.650
1.200
0.0030
0.1000

4,026.00

4,077.15
1,716.00
645.00
250.80

1 m Pasang Plint Ubin Teraso ukuran 10 x 40 cm


Bahan
Plint Ubin Teraso 10 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna

10,787.00

2,200
1,430
176
220
6,688.95

3.530
1.560
0.0030
0.1900

4,026.00

4,664.00
1,320.00
645.00
132.00

1 m Pasang Plint Ubin Teraso ukuran 10 x 30 cm


Bahan
Plint Ubin Teraso 10 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna

10,050.10

1,650
1,073
132
165
6,761.00

2.650
1.200
0.0030
0.1000

3,019.50

4,395.60
1,815.00
688.00
132.00

1 m Pasang Plint Ubin PC Warna ukuran 10 x 40 cm


Bahan
Plint Ubin PC Warna 10 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna

9,899.30

1,650
1,073
132
165
7,030.60

3.330
1.650
0.0032
0.1000

3,019.50

4,664.00
1,320.00
645.00
250.80

1 m Pasang Plint Ubin PC Warna ukuran 10 x 30 cm


Bahan
Plint Ubin PC Warna 10 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna

8,878.50

3,498.00
1,716.00
645.00

1 m Pasang Plint Ubin PC Warna ukuran 10 x 20 cm


Bahan
Plint Ubin PC Warna 10 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna

3,019.50

1,540.00
1,100.00
215,000.00
1,320.00

4,026.00

4,081.00
1,320.00
645.00
132.00

27,500.00
35,750.00
44,000.00

2,200
1,430
176

10,204.00

Mandor

0.0040

Oh

55,000.00

1 m Pasang Plint Ubin Granito ukuran 10 x 40 cm

21,919.00

Bahan
Plint Ubin Granito 10 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna

2.650
1.200
0.0030
0.1000

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.0600
0.030
0.0030
0.0030

Oh
Oh
Oh
Oh

7,480.00
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

3.330
1.650
0.0032
0.1000

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.9000
0.090
0.0090
0.0045

Oh
Oh
Oh
Oh

5,610.00
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.9000
0.090
0.0090
0.0045

Oh
Oh
Oh
Oh

Bahan
Plint Ubin Teralux Kerang 10 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna

3.330
1.650
0.0032
0.1000

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.9000
0.090
0.0090
0.0045

Oh
Oh
Oh
Oh

3,300.00
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

2,475.00
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

0.9000
0.090
0.0090
0.0045

Oh
Oh
Oh
Oh

Bahan
Plint Ubin Teralux Marmer 10 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna

2.500
1.650
0.0032
0.1000

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.9000
0.090
0.0090
0.0045

Oh
Oh
Oh
Oh

7,920.00
1,100.00
215,000.00
1,320.00

1 m Pasang Plint Ubin Teralux Marmer ukuran 10 x 40 cm


5,280.00
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

3,960.00
1,100.00

28,611.00

44,446.00

13,200.00
1,815.00
688.00
132.00

24,750
3,218
396
248
15,821.80

bh
Kg

44,710.00

24,750
3,218
396
248
15,835.00

3.330
1.650

28,611.00

13,464.00
1,815.00
688.00
132.00

27,500.00
35,750.00
44,000.00
55,000.00

1 m Pasang Plint Ubin Teralux Marmer ukuran 10 x 30 cm

39,487.75

24,750
3,218
396
248
16,099.00

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

28,611.00

8,241.75
1,815.00
688.00
132.00

1 m Pasang Plint Ubin Teralux Marmer ukuran 10 x 60 cm


bh
Kg
m3
Kg

39,496.00

24,750
3,218
396
248
10,876.75

1.700
1.650
0.0032
0.1000

28,611.00

8,250.00
1,815.00
688.00
132.00

1 m Pasang Plint Ubin Teralux Kerang ukuran 10 x 30 cm

Bahan
Plint Ubin Teralux Marmer 10 x 60 cm
Semen Portland
Pasir Pasang
Semen Warna

49,927.30

24,750
3,218
396
248
10,885.00

2.500
1.650
0.0032
0.1000

28,611.00

18,681.30
1,815.00
688.00
132.00

1 m Pasang Plint Ubin Teralux Kerang ukuran 10 x 40 cm


Bahan
Plint Ubin Teralux Kerang 10 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna

24,938.50

1,650
1,073
132
165
21,316.30

Bahan
Plint Ubin Granito 10 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna

3,019.50

19,822.00
1,320.00
645.00
132.00

1 m Pasang Plint Ubin Granito ukuran 10 x 30 cm

Bahan
Plint Ubin Teralux Marmer 10 x 30 cm
Semen Portland

220

13,186.80
1,815.00

28,611.00

44,432.80

Pasir Pasang
Semen Warna

0.0032
0.1000

m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.9000
0.090
0.0090
0.0045

Oh
Oh
Oh
Oh

215,000.00
1,320.00

688.00
132.00

27,500.00
35,750.00
44,000.00
55,000.00

1 m Pasang Teraso Cor ditempat

118.80

Bahan
Bahan Teraso Cor

0.0036

m3

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.9000
0.090
0.0090
0.0045

Oh
Oh
Oh
Oh

33,000.00

27,500.00
35,750.00
44,000.00
55,000.00

0.0036

m3

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.9000
0.090
0.0090
0.0045

Oh
Oh
Oh
Oh

33,000.00

27,500.00
35,750.00
44,000.00
55,000.00

m2
Kg
m3

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.2700
0.150
0.0150
0.0135

Oh
Oh
Oh
Oh

Bahan
Ubin Keramik Artistik 10 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna

5.0000
11.3800
0.0420
1.5000

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.6200
0.350
0.0350
0.0300

Oh
Oh
Oh
Oh

143,000.00
1,430.00
215,000.00

27,500.00
35,750.00
44,000.00
55,000.00

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.0900
0.090
0.0090
0.0045

Oh
Oh
Oh
Oh

1 m' Pasang Plint Keramik Artistik ukuran 10 x 10 cm


Bahan
Plint Keramik Artistik 10 x 10 cm
Semen Portland
Pasir Pasang
Semen Warna

5.000
1.650
0.0032
0.1200

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.0900
0.090
0.0090
0.0045

Oh
Oh
Oh
Oh

1,716.00
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

1,320.00
1,100.00
215,000.00
1,320.00

6,336.00

15,571.00

6,600.00
1,815.00
688.00
132.00

27,500.00
35,750.00
44,000.00
55,000.00

6,600.00
1,100.00
215,000.00
1,320.00

2,475
3,218
396
248
6,336.00

41,997.40

33,000.00
1,815.00
688.00
158.40

27,500.00
35,750.00
44,000.00
55,000.00

2,475
3,218
396
248
4,813.60

660.00
1,100.00

64,860.50

17,050
12,513
1,540
1,650

35,661.40

bh
Kg

32,752.50

8,580.00
12,518.00
9,030.00
1,980.00

9,235.00

5.000
0.850

193,160.20

7,425
5,363
660
743
32,108.00

5.000
1.650
0.0032
0.1000

14,190.00

150,150.00
20,220.20
8,600.00

1 m Pasang Lantai Keramik Artistik 10 x 20 cm

1 m' Pasang Plint Keramik Artistik ukuran 10 x 20 cm


Bahan
Plint Keramik Artistik 10 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna

28,729.80

24,750
3,218
396
248
178,970.20

1.0500
14.1400
0.0400

28,611.00

118.80

1 m Pasang Ubin Tahan Asam


Bahan
Ubin Tahan Asam
Semen Tanam Asam
Pasir Pasang

28,729.80

24,750
3,218
396
248
118.80

Bahan
Bahan Teraso Cor

28,611.00

118.80

1 m Pasang Teralux Cor ditempat, tebal 3 cm

1 m' Pasang Plint Keramik Artistik ukuran 5 x 20 cm


Bahan
Plint Keramik Artistik 5 x 20 cm
Semen Portland

24,750
3,218
396
248

3,300.00
935.00

6,336.00

11,149.60

Pasir Pasang
Semen Warna

0.0022
0.0800

m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.0900
0.090
0.0090
0.0045

Oh
Oh
Oh
Oh

1 m' Pasang Plint Vinyl tanpa adukan


Bahan
Lt. Vinyl Karet 30 x 30 kwl I
Lem Vinyl

3.500
0.080

bh
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.0800
0.080
0.0080
0.0040

Oh
Oh
Oh
Oh

215,000.00
1,320.00

473.00
105.60

27,500.00
35,750.00
44,000.00
55,000.00

2,475
3,218
396
248

15,620.00
2,200.00
99,000.00

27,500.00
35,750.00
44,000.00
55,000.00

2,200
2,860
352
220
62,028.00

50.000
11.380
0.042
1.500

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.6200
0.350
0.0350
0.0300

Oh
Oh
Oh
Oh

770.00
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.6200
0.350
0.0350
0.0300

Oh
Oh
Oh
Oh

1,113.75
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.6200
0.350
0.0350
0.0300

Oh
Oh
Oh
Oh

1,980.00
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.6200
0.350
0.0350
0.0300

Oh
Oh
Oh
Oh

3,093.75
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang

0.6200
0.350
0.0350

Oh
Oh
Oh

105,780.50

17,050
12,513
1,540
1,650
75,503.00

35.000
11.380
0.042
1.500

32,752.50

49,500.00
12,518.00
9,030.00
1,980.00

1 m Pasang Lantai Keramik 15 x 20 cm


Bahan
Ubin Keramik 15 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna

105,780.50

17,050
12,513
1,540
1,650
73,028.00

16.000
11.380
0.042
1.500

32,752.50

49,500.00
12,518.00
9,030.00
1,980.00

1 m Pasang Lantai Keramik 25 x 25 cm


Bahan
Ubin Keramik 25 x 25 cm
Semen Portland
Pasir Pasang
Semen Warna

105,285.50

17,050
12,513
1,540
1,650
73,028.00

25.000
11.380
0.042
1.500

32,752.50

49,005.00
12,518.00
9,030.00
1,980.00

1 m Pasang Lantai Keramik 20 x 20 cm


Bahan
Ubin Keramik 20 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna

94,780.50

17,050
12,513
1,540
1,650
72,533.00

44.000
11.380
0.042
1.500

32,752.50

38,500.00
12,518.00
9,030.00
1,980.00

1 m Pasang Lantai Keramik 15 x 15 cm


Bahan
Ubin Keramik 15 x 15 cm
Semen Portland
Pasir Pasang
Semen Warna

21,252.00

7,700.00
7,920.00

1 m Pasang Lantai Keramik 10 x 20 cm


Bahan
Ubin Keramik 10 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna

5,632.00

1,485.00
1,100.00
215,000.00
1,320.00

32,752.50

51,975.00
12,518.00
9,030.00
1,980.00

27,500.00
35,750.00
44,000.00

17,050
12,513
1,540

108,255.50

Mandor

0.0300

Oh

55,000.00

1 m Pasang Lantai Keramik 33 x 33 cm

77,433.50

Bahan
Ubin Keramik 33 x 33 cm
Semen Portland
Pasir Pasang
Semen Warna

10.000
11.380
0.042
1.500

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.6200
0.350
0.0350
0.0300

Oh
Oh
Oh
Oh

5,390.55
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

10.000
11.380
0.042
1.500

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.6200
0.350
0.0350
0.0300

Oh
Oh
Oh
Oh

6,588.45
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.6200
0.350
0.0350
0.0300

Oh
Oh
Oh
Oh

Bahan
Mozaik 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna

12.000
14.150
0.039
2.000

bh
Kg
m3
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.6200
0.350
0.0350
0.0300

Oh
Oh
Oh
Oh

1,633.50
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

5,500.00
1,100.00
215,000.00
1,320.00

27,500.00
35,750.00
44,000.00
55,000.00

0.6200
0.350
0.0350
0.0300

Oh
Oh
Oh
Oh

Bahan
Feltex 100% Wool - T - 21
Lem Vinyl

1.050
0.350

m2
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.1700
0.170
0.0170
0.0085

Oh
Oh
Oh
Oh

1.050
0.350

m2
Kg

143,000.00
1,100.00
215,000.00
1,320.00

1 m Pasang Lantai Karpet 100% Wool

Tenaga

209,778.50

17,050
12,513
1,540
1,650
219,450.00

176,000.00
99,000.00

11,968.00

231,418.00

184,800.00
34,650.00

27,500.00
35,750.00
44,000.00
55,000.00

4,675
6,078
748
468
127,050.00

88,000.00
99,000.00

32,752.50

150,436.00
15,565.00
8,385.00
2,640.00

27,500.00
35,750.00
44,000.00
55,000.00

1 m Pasang Lantai Karpet 100% Wool, 20% Nylon

125,342.50

17,050
12,513
1,540
1,650
177,026.00

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

32,752.50

66,000.00
15,565.00
8,385.00
2,640.00

1 m Pasang Lantai Marmer


M2
Kg
m3
Kg

110,186.00

17,050
12,513
1,540
1,650
92,590.00

1.052
14.150
0.039
2.000

32,752.50

53,905.50
12,518.00
9,030.00
1,980.00

1 m Pasang Lantai Mozaik 30 x 30 cm, ex lokal

Bahan
Marmer
Semen Portland
Pasir Pasang
Semen Warna

122,165.00

17,050
12,513
1,540
1,650
77,433.50

33.000
11.380
0.042
1.500

32,752.50

65,884.50
12,518.00
9,030.00
1,980.00

1 m Pasang Lantai Keramik 10 x 33 cm


Bahan
Ubin Keramik 10 x 33 cm
Semen Portland
Pasir Pasang
Semen Warna

110,186.00

17,050
12,513
1,540
1,650
89,412.50

Bahan
Ubin Keramik 33 x 33 cm anti slip
Semen Portland
Pasir Pasang
Semen Warna

32,752.50

53,905.50
12,518.00
9,030.00
1,980.00

1 m Pasang Lantai Keramik 33 x 33 cm anti slip

Bahan
Carpet 80% Wool, 20% Nylon
Lem Vinyl

1,650

92,400.00
34,650.00

11,968.00

139,018.00

Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.1700
0.170
0.0170
0.0085

Oh
Oh
Oh
Oh

Bahan
Underlyer, tebal 6 mm / Rubber Corrugated

1.050

m2

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.1200
0.120
0.0120
0.0060

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

1 m Pasang Underlyer, tebal 6 mm

99,330.00
94,600.00

27,500.00
35,750.00
44,000.00
55,000.00

1.050
0.350

m2
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.1700
0.170
0.0170
0.0085

Oh
Oh
Oh
Oh

27,500.00
99,000.00

27,500.00
35,750.00
44,000.00
55,000.00

m2
Kg

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.6500
0.350
0.0350
0.0325

Oh
Oh
Oh
Oh

176,000.00
99,000.00

27,500.00
35,750.00
44,000.00
55,000.00

0.6200
0.500
0.0500
0.0300

Oh
Oh
Oh
Oh

83.000
9.300
0.018
1.500

Bh
Kg
m3
Kg

0.6200
0.500
0.0500
0.0300

Oh
Oh
Oh
Oh

495.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00

Bh
Kg
m3
Kg

0.6000
0.450
0.0450
0.0300

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

1,113.75
1,100.00
215,000.00
1,320.00

17,050
17,875
2,200
1,650

27,500.00
35,750.00
44,000.00
55,000.00

Bh
Kg
m3
Kg

0.6000
0.450
0.0450

Oh
Oh
Oh

36,217.50

102,416.25

16,500
16,088
1,980
1,650
77,336.25

45.000
9.300
0.018
1.500

105,070.00

50,118.75
10,230.00
3,870.00
1,980.00

1 m Pasang Dinding Porselen 15 x 15 cm, warna


Bahan
Porselen 15 x 15 cm warna
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang

38,775.00

50,215.00
10,230.00
3,870.00
1,980.00

66,198.75
45.000
9.300
0.018
1.500

95,940.00

17,050
17,875
2,200
1,650
66,295.00

605.00
1,100.00
215,000.00
1,320.00

1 m Pasang Dinding Porselen 15 x 15 cm, putih


Bahan
Porselen 15 x 15 cm putih
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

38,775.00

41,085.00
10,230.00
3,870.00
1,980.00

1 m Pasang Dinding Porselen 11 x 11 cm, warna


Bahan
Porselen 11 x 11 cm warna
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

277,915.00

17,875
12,513
1,540
1,788

57,165.00
Bh
Kg
m3
Kg

33,715.00

184,800.00
59,400.00

1 m Pasang Dinding Porselen 11 x 11 cm, putih


83.000
9.300
0.018
1.500

75,493.00

4,675
6,078
748
468
244,200.00

1.050
0.600

11,968.00

28,875.00
34,650.00

1 m Pasang Lantai Parquet Jati


Bahan
Parquet Jati
Lem Vinyl

107,778.00

3,300
4,290
528
330
63,525.00

Bahan
Carpet
Lem Vinyl

8,448.00

99,330.00

1 m Pasang Lantai Karpet

Bahan
Porselen 11 x 11 cm putih
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

4,675
6,078
748
468

1,361.25
1,100.00
215,000.00
1,320.00

36,217.50

61,256.25
10,230.00
3,870.00
1,980.00
27,500.00
35,750.00
44,000.00

16,500
16,088
1,980

113,553.75

Mandor

0.0300

Oh

55,000.00

1 m Pasang Dinding Porselen 10 x 20 cm, warna


Bahan
Porselen 10 x 20 cm warna
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

76,580.00
50.000
9.300
0.018
1.500

Bh
Kg
m3
Kg

0.6000
0.450
0.0450
0.0300

Oh
Oh
Oh
Oh

25.000
9.300
0.018
1.500

Bh
Kg
m3
Kg

0.6000
0.450
0.0450
0.0300

Oh
Oh
Oh
Oh

1,210.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00

Bh
Kg
m3
Kg

0.6000
0.450
0.0450
0.0300

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

7,700.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00

Bh
Kg
m3
Kg

0.6000
0.450
0.0450
0.0300

Oh
Oh
Oh
Oh

50.000
9.300
0.018
1.500

Bh
Kg
m3
Kg

0.6000
0.450
0.0450
0.0300

Oh
Oh
Oh
Oh

7,150.00
1,100.00
215,000.00
1,320.00

3,850.00
1,100.00
215,000.00
1,320.00

0.6000
0.450
0.0450
0.0300

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

3,850.00
1,100.00
215,000.00
1,320.00

Bh
Kg
m3
Kg

0.6000
0.100
0.0450

Oh
Oh
Oh

244,797.50

16,500
16,088
1,980
1,650

27,500.00
35,750.00
44,000.00
55,000.00

36,217.50

225,547.50

16,500
16,088
1,980
1,650
112,330.00

25.000
9.300
0.018
1.500

36,217.50

173,250.00
10,230.00
3,870.00
1,980.00

1 m Pasang Dinding Keramik 20 x 20 cm


Bahan
Keramik 20 x 20 cm
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang

767,297.50

192,500.00
10,230.00
3,870.00
1,980.00

189,330.00
Bh
Kg
m3
Kg

36,217.50

16,500
16,088
1,980
1,650
208,580.00

45.000
9.300
0.018
1.500

822,297.50

16,500
16,088
1,980
1,650

27,500.00
35,750.00
44,000.00
55,000.00

1 m Pasang Dinding Keramik 15 x 15 cm


Bahan
Keramik 15 x 15 cm
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

36,217.50

715,000.00
10,230.00
3,870.00
1,980.00

1 m Pasang Dinding Keramik 10 x 20 cm


Bahan
Keramik 10 x 20 cm
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

16,500
16,088
1,980
1,650

731,080.00
100.000
9.300
0.018
1.500

112,797.50

770,000.00
10,230.00
3,870.00
1,980.00

1 m Pasang Dinding Keramik Artistik 5 x 20 cm, warna


Bahan
Keramik Artistik 5 x 20 cm
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

36,217.50

60,500.00
10,230.00
3,870.00
1,980.00

786,080.00
100.000
9.300
0.018
1.500

112,797.50

16,500
16,088
1,980
1,650
76,580.00

2,420.00
1,100.00
215,000.00
1,320.00

1 m Pasang Dinding Keramik Artistik 10 x 20 cm, warna


Bahan
Keramik Artistik 10 x 20 cm
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

36,217.50

60,500.00
10,230.00
3,870.00
1,980.00

1 m Pasang Dinding Porselen 20 x 20 cm, warna


Bahan
Porselen 20 x 20 cm warna
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1,650

3,850.00
1,100.00
215,000.00
1,320.00

23,705.00

96,250.00
10,230.00
3,870.00
1,980.00
27,500.00
35,750.00
44,000.00

16,500
3,575
1,980

136,035.00

Mandor

0.0300

Oh

55,000.00

1 m Pasang Dinding Keramik 10 x 20 cm


Bahan
Keramik 10 x 20 cm
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

208,580.00
50.000
9.300
0.018
1.500

Bh
Kg
m3
Kg

0.6000
0.125
0.0125
0.0300

Oh
Oh
Oh
Oh

1.020
12.440
0.025
1.500

M2
Kg
m3
Kg

0.7200
0.650
0.0650
0.0350

Oh
Oh
Oh
Oh

3,850.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00

Bh
Kg
m3

0.6200
0.350
0.0350
0.0300

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

1,100.00
1,100.00
215,000.00
27,500.00
35,750.00
44,000.00
55,000.00

Bh
Kg
m3

0.6200
0.350
0.0350
0.0300

Oh
Oh
Oh
Oh

1.050
11.750
0.035

Bh
Kg
m3

0.6200
0.350
0.0350
0.0300

Oh
Oh
Oh
Oh

275,000.00
1,100.00
215,000.00

88,000.00
1,100.00
215,000.00

0.1500
0.150
0.0150
0.0075

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

9,900.00
99,000.00

Bh
Kg

0.1500
0.150
0.0150
0.0075

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

8,800.00
99,000.00

Bahan
Vinyl Asbes 30 x 30 cm
Lem Vinyl

Bh
Kg

6,600.00
99,000.00

154,605.00

10,560.00

142,450.00

97,240.00
34,650.00
4,125
5,363
660
413
107,580.00

11.050
0.350

10,560.00

4,125
5,363
660
413

27,500.00
35,750.00
44,000.00
55,000.00

1 m Pasang Lantai Vinyl Asbes 30 x 30 cm

145,602.50

17,050
12,513
1,540
1,650

131,890.00
11.050
0.350

32,752.50

109,395.00
34,650.00

1 m Pasang Lantai Vinyl Karet 30 x 30 cm KL II


Bahan
Vinyl Karet 30 x 30 cm KL II
Lem Vinyl
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

341,952.50

92,400.00
12,925.00
7,525.00

144,045.00
Bh
Kg

32,752.50

17,050
12,513
1,540
1,650
112,850.00

11.050
0.350

139,811.50

17,050
12,513
1,540
1,650

27,500.00
35,750.00
44,000.00
55,000.00

1 m Pasang Lantai Vinyl Karet 30 x 30 cm KL I


Bahan
Vinyl Karet 30 x 30 cm KL I
Lem Vinyl
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

32,752.50

288,750.00
12,925.00
7,525.00

1 m Pasang Dinding Batu Tempel Hitam


Bahan
Batu Tempel Hitam
Semen Abu -abu
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

19,800
23,238
2,860
1,925

309,200.00
1.050
11.750
0.035

214,721.50

88,000.00
13,684.00
5,375.00

1 m Pasang Dinding Batu Paros


Bahan
Batu Paros
Semen Abu -abu
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

47,822.50

145,860.00
13,684.00
5,375.00
1,980.00

107,059.00
80.000
12.440
0.025

231,748.75

16,500
4,469
550
1,650
166,899.00

143,000.00
1,100.00
215,000.00
1,320.00

1 m Pasang Dinding Bata Klinker 5 x 5 x 24 cm


Bahan
Bata Pelapis Klinker
Semen Abu -abu
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

23,168.75

192,500.00
10,230.00
3,870.00
1,980.00

1 m Pasang Dinding Marmer


Bahan
Marmer
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1,650

72,930.00
34,650.00

10,560.00

118,140.00

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

0.1500
0.150
0.0150
0.0075

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00

1 m Pasang Lantai Vinyl Motif Kembang 30 x 30 cm


Bahan
Vinyl Motif Kembang ex DN
Lem Vinyl
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

125,812.50
11.050
0.350

Bh
Kg

0.1500
0.150
0.0150
0.0075

Oh
Oh
Oh
Oh

8,250.00
99,000.00
27,500.00
35,750.00
44,000.00
55,000.00

m2
Kg

0.7500
0.170
0.0170
0.0085

Oh
Oh
Oh
Oh

19,580.00
6,600.00
27,500.00
35,750.00
44,000.00
55,000.00

Kg

0.1200
0.120
0.0120
0.0060

Oh
Oh
Oh
Oh

30,800.00
27,500.00
35,750.00
44,000.00
55,000.00

Kg

0.1200
0.120
0.0120
0.0060

Oh
Oh
Oh
Oh

30,800.00
27,500.00
35,750.00
44,000.00
55,000.00

VI

m3
Kg

0.1200
0.120
0.0120
0.0060

Oh
Oh
Oh
Oh

27,500,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00

Kg

0.1500
0.0025

Oh
Oh
Oh
Oh

7,150.00
27,500.00
33,000.00
44,000.00
55,000.00

Kg

0.1500
0.0025

Oh
Oh
Oh
Oh

3,850.00
27,500.00
33,000.00
44,000.00
55,000.00

1 m Menyabun Permukaan Tembok Lama


Bahan

Kg

0.1500
0.0025

Oh
Oh
Oh
Oh

#VALUE!

4,125
#VALUE!
#VALUE!
138
192.50

0.050

#VALUE!

192.50

1 m Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual


Bahan
Sabun
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

#VALUE!

4,125
#VALUE!
#VALUE!
138
192.50

0.050

#VALUE!

357.50

1 m Mencuci Bidang Permukaan Tembok yang Pernah dicat


Bahan
Sabun
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

76,483.00

3,300
4,620
528
330

357.50
0.050

8,778.00

66,000.00
1,705.00

PEKERJAAN PENGECATAN
1 m Mengikis / Mengerok Permukaan Cat Tembok Lama
Bahan
Soda Api
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

162,448.00

3,300
4,290
528
330
67,705.00

0.002
0.050

8,448.00

154,000.00

1 m Plint Kayu 2 x 10 cm
Bahan
Papan Kayu Jati
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

100,848.00

3,300
4,290
528
330
154,000.00

5.000

8,448.00

92,400.00

1 m Floor Hardener Mastercron


Bahan
Floor Hardener Ferrovax
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

51,106.00

20,625
6,078
748
468
92,400.00

3.000

27,918.00

21,538.00
1,650.00

1 m Floor Hardener Ferrovax


Bahan
Floor Hardener Ferrovax
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

136,372.50

4,125
5,363
660
413
23,188.00

1.100
0.250

10,560.00

91,162.50
34,650.00

1 m Pasang Wall Covering lebar 50 cm


Bahan
Vinyl Wall Covering lebar 50 cm
Lem
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

4,125
5,363
660
413

3,850.00

#VALUE!

#VALUE!

192.50
27,500.00
33,000.00
44,000.00
55,000.00

4,125
#VALUE!
#VALUE!
138
192.50

#VALUE!

#VALUE!

Sabun
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

0.050

Kg

0.1500
0.0025

Oh
Oh
Oh
Oh

3,850.00

192.50
27,500.00
33,000.00
44,000.00
55,000.00

1 m Mengerok Karat atau Cat Lama Permukaan Baja dgn Pancar Pasir ( Sanblasting ) dgn Tingkat Kebersihan Sa 2 .
Bahan
Pasir Silika
BBM
Peralatan
Kompresor, Blasting Pot , Selang Dan Nozzle
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

40.000
10.000

Kg
Ltr

13,200.00
4,950.00

1.6000
1.600
0.8000
0.5000

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00

737,000.00

44,000
52,800
35,200
27,500
2,464.00

0.080
0.020
0.010

Kg
Kg
Kg

0.0400
0.040
0.0040
0.0025

Oh
Oh
Oh
Oh

23,100.00
27,500.00
6,600.00
27,500.00
33,000.00
44,000.00
55,000.00

Kg
Kg
Kg

0.0700
0.075
0.0075
0.0025

Oh
Oh
Oh
Oh

Bahan
Cat Meni
Plamir
Cat Dasar
Cat Kayu glotek

0.200
0.150
0.170
0.260

Kg
Kg
Kg
Kg

Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

0.0700
0.009
0.0060
0.0025

Oh
Oh
Oh
Oh

19,800.00
11,000.00
13,200.00

0.200
0.150
0.170
0.350

Kg
Kg
Kg
Kg

Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

0.0700
0.105
0.0040
0.0025

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00

0.200
0.150
0.170
0.350

Kg
Kg
Kg
Kg

Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

0.0700
0.105
0.0040
0.0025

Oh
Oh
Oh
Oh

Ltr

17,765.00

16,500.00
19,800.00
11,000.00
27,500.00

5,703.50

23,468.50

3,300.00
2,970.00
1,870.00
9,625.00

27,500.00
33,000.00
44,000.00
55,000.00

1,925
3,465
176
138
17,765.00

16,500.00
19,800.00
11,000.00
27,500.00

5,703.50

23,468.50

3,300.00
2,970.00
1,870.00
9,625.00

27,500.00
33,000.00
44,000.00
55,000.00

22,000.00

17,913.50

1,925
297
264
138

1,925
3,465
176
138
7,920.00

0.360

2,623.50

3,300.00
2,970.00
1,870.00
7,150.00

27,500.00
33,000.00
44,000.00
55,000.00

1 m Pelaburan Bidang Kayu dengan Teak Oil

11,951.50

1,925
2,475
330
138
15,290.00

16,500.00
19,800.00
11,000.00
27,500.00

1 m Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup
Bahan
Cat Meni
Plamir
Cat Dasar
Cat Kayu glotek

4,867.50

2,970.00
1,870.00
2,244.00

1 m Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup
Bahan
Cat Meni
Plamir
Cat Dasar
Cat Kayu glotek

5,197.50

1,100
1,320
176
138
7,084.00

0.150
0.170
0.170

2,733.50

1,848.00
550.00
66.00

1 m Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup

Bahan
Teak Oil
Tenaga

159,500.00

sewa / Hr

1 m Mengecatan Bidang Kayu Lama


Bahan
Plamir
Cat Dasar
Cat Penutup
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

577,500.00
528,000.00
49,500.00

1 m Mendempul dan Menggosok Kayu


Bahan
Dempul Jadi
Minyak Cat
Batu Apung
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

4,125
#VALUE!
#VALUE!
138

7,920.00

6,088.50

14,008.50

Perkerja
Tukang Cat
Kepala Tukang
Mandor

0.0400
0.063
0.0630
0.0025

Oh
Oh
Oh
Oh

0.150
0.372
2.000

Ltr
Ltr
Lbr

0.0400
0.063
0.0630
0.0025

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00

1 m Pelaburan Bidang Kayu dengan Pelitur


Bahan
Pelitur
Pelitur Jadi
Ampelas
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

49,511.00
38,500.00
88,000.00
5,500.00
27,500.00
33,000.00
44,000.00
55,000.00

Ltr

0.1000
0.0060

Oh
Oh
Oh
Oh

15,400.00
27,500.00
33,000.00
44,000.00
55,000.00

Ltr
Kg
Lbr
Bh

0.1600
0.160
0.0160
0.0025

Oh
Oh
Oh
Oh

34,100.00
23,100.00
5,500.00
7,700.00

0.100
0.100
0.260

Kg
Kg
Kg

0.0200
0.063
0.0063
0.0025

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00

19,800.00
11,000.00
13,200.00

Lbr
ikat
m3
Kg

0.1500
0.001
0.0001
0.0025

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00

5,500.00
6,600.00
1,485,000.00
880.00
27,500.00
33,000.00
44,000.00
55,000.00

m3
Kg

0.0400
0.005
0.0005
0.0025

Oh
Oh
Oh
Oh

1,485,000.00
880.00

m3
Kg

0.0200
0.200
0.0020
0.0025

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00

38,500.00
8,800.00

Bahan
Meni Besi
Kuas

Kg
Bh

16,500.00
7,700.00

4,658.50

7,375.50

55,335.50

46,200.00
1,760.00
550
6,600
88
138
1,727.00

0.100
0.010

1,424.50

1,100
165
22
138

27,500.00
33,000.00
44,000.00
55,000.00

1 m Pengecatan Permukaan Baja dengan Meni Besi

9,601.90

4,125
33
4
138

47,960.00
1.200
0.200

4,299.90

2,970.00
264.00

1 m Pemasangan Wall Paper


Bahan
Wall Paper
Perekat
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

550
2,079
277
138

3,234.00

0.002
0.300

9,555.70

550.00
1,650.00
2,970.00
132.00

1 m Melabur Tembok Lama dengan Kapur Sirih ( untuk pemeliharaan )


Bahan
Perancah Kayu
Kapur Sirih
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

3,043.70

1,980.00
1,100.00
3,432.00

5,302.00
0.100
0.250
0.002
0.150

17,418.50

4,400
5,280
704
138
6,512.00

1 m Melabur Tembok dengan Kapur Sirih


Bahan
Ampelas
Alang - alang
Perancah Kayu
Kapur Sirih
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

10,521.50

5,115.00
1,155.00
550.00
77.00

1 m Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
Bahan
Plamir
Cat Dasar
Cat Tembok vinilex
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

#VALUE!

2,750
#VALUE!
#VALUE!
330
6,897.00

0.150
0.050
0.100
0.010

#VALUE!

5,390.00

1 m Pelaburan Bidang Kayu dengan Vernis


Bahan
Vernis
Dempul
Ampelas
Kuas
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

55,599.50

1,100
2,079
2,772
138
5,390.00

0.350

6,088.50

5,775.00
32,736.00
11,000.00

1 m Pelaburan Bidang Kayu dengan Cat Residu dan Ter


Bahan
Residu atau Ter
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1,100
2,079
2,772
138

1,650.00
77.00

8,580.00

10,307.00

Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

0.0200
0.200
0.0200
0.0100

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00

1 m Pengecatan Permukaan Baja dengan Meni Besi dan Perancah


Bahan
Meni Besi
Kuas
Perancah Kayu
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

4,697.00

0.100
0.010
0.002

Kg
Bh
m3

0.2500
0.225
0.0225
0.0075

Oh
Oh
Oh
Oh

16,500.00
7,700.00
1,485,000.00

0.100
0.100
0.040
0.040
0.010
0.002

Kg
Kg
Kg
Kg
Ltr
m3

0.0060
0.006
0.0225
0.0075

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00

9,900.00
12,100.00
27,500.00
29,700.00
6,600.00
1,485,000.00

0.300

Kg

0.0060
0.060
0.0120
0.0060

Oh
Oh
Oh
Oh

0.110
0.170
0.080

Kg
Kg
Kg

0.5000
0.800
0.3000
0.2000

Oh
Oh
Oh
Oh

6,875
7,425
990
413
7,524.00

27,500.00
33,000.00
44,000.00
55,000.00

0.300

Kg

0.4000
0.700
0.2000
0.2000

Oh
Oh
Oh
Oh

9,289.50

3,003.00

7,953.00

4,950.00
27,500.00
33,000.00
44,000.00
55,000.00

11,000.00
11,000.00
13,200.00

165
1,980
528
330
4,136.00

64,350.00

68,486.00

1,210.00
1,870.00
1,056.00
27,500.00
33,000.00
44,000.00
55,000.00

13,750
26,400
13,200
11,000

1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Semprot ( Airless Spray ) dgn Sistem 1 Lapis Cat Mutakhir, tebal 200 um3,300.00
Bahan
Cat Dasar
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1,765.50

165
198
990
413
4,950.00

16,500.00

1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 3 Lapis Cat Konvensional, tebal 200 um
Bahan
Cat Dasar
Cat Antara
Cat Penutup
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

20,399.50

990.00
1,210.00
1,100.00
1,188.00
66.00
2,970.00

1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 1 Lapis Cat Mutakhir, tebal 200 um
Bahan
Meni Besi
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

15,702.50

1,650.00
77.00
2,970.00

1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 4 Lapis Cat Konvensional, tebal 200 um
Bahan
Meni ( Read Lead ) A
Meni ( Read Lead ) B
Alluminium C
Alluminium B
Pengencer
Perancah Kayu
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

550
6,600
880
550

11,000.00

53,900.00

3,300.00
27,500.00
33,000.00
44,000.00
55,000.00

11,000
23,100
8,800
11,000

57,200.00

NO

JENIS UPAH

SPESIFIKASI

Pekerja / knek
Tukang gali
Kepala tukang batu
Tukang batu
Kepala tukang kayu
Tukang kayu
Kepala tukang besi
Tukang besi
Kepala tukang cat
Tukang Cat
Tukang aspalt
Mandor/ pengawas
Instalator
Pembantu instalator
Tukang babat rumput
Tukang taman
Kepala tukang pasang pipa
Tukang pasang pipa
Operator alat besar
Pembantu operator alat besar
Tukang las

NO

JENIS BAHAN
Akustik 30 x 30 cm
Akustik 30 x 60 cm
Akustik Arm Strong Ukuran 30 x 120 cm
Akustik Armstrom 60 x 120cm
Alang - alang
Alluminium B
Alluminium C
Ampelas
Asbes
Asbes Gelombang
Atap Alluminium Gelombang tebal 0.55
Badkip
Bahan Teraso Cor
Bak Teraso
Bak cuci Stainless steel
Bak cuci Teraso
Bak Fiberglass
Balok Kayu Borneo
Balok Kayu Jati
Balok Kayu Kamper
Balok Kayu Kruing

harga real

SATUAN

Rp

55,798.00 Oh

Rp

65,734.00 Oh

Rp

75,671.00 Oh

Rp

65,734.00 Oh

Rp

75,671.00 Oh

Rp

65,734.00 Oh

Rp

75,671.00 Oh

Rp

65,718.00 Oh

Rp

75,671.00 Oh

Rp

65,734.00 Oh

Rp

65,734.00 Oh

Rp

85,607.00 Oh

Rp

75,671.00 Oh

Rp

65,718.00 Oh

Rp

55,798.00 Oh

Rp

65,734.00 Oh

Rp

65,734.00 Oh

Rp

55,798.00 Oh

Rp

85,607.00 Oh

Rp

65,734.00 Oh

Rp

65,734.00 Oh

SPESIFIKASI

harga real

SATUAN

Rp

lbr

Rp

lbr

Rp

lbr

Rp

lbr

Rp

ikat

Rp

Kg

Rp

Kg

Rp

Lbr

Rp

lbr

Rp

lbr

Rp

m2

Rp

bh

Rp

m3

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

m3

Rp

m3

Rp

m3

Rp

m3

Bambu 6 - 8 / 600 cm

Rp

btg

Bata merah kelas I


Bata Pelapis Klinker
Batacote
Batu Apung
Batu Belah 15 / 20
Batu Belah 5 / 20
Batu Belah 5 / 7
Batu Granito
Batu Kerikil
Batu Koral
Batu Paros
Batu Tempel Hitam
Batu Teraso
BBM
Besi Beton
Besi Beton ( Polos / Ulir )
Besi Beton Polos
Besi Jaring Kawat Baja
Besi Profil WF
Besi Strip
Carpet
Carpet 80% Wool, 20% Nylon
Cat Tembok vinilex
Cat Antara
Cat Dasar
Cat Meni
Cat Penutup
Cat Kayu glotek
Dempul
Dempul Jadi
Dolken Kayu Galam 8 - 10 / 4m
Dolken Kayu 8 - 10/400 cm
Dolken 8 / 4 m

Rp

bh

Rp

Bh

Rp

Kg

Rp

Kg

Rp

m3

Rp

m3

Rp

m3

Rp

Kg

Rp

m3

Rp

m3

Rp

Bh

Rp

Bh

Rp

Kg

Rp

Ltr

Rp

Kg

Rp

Kg

Rp

Kg

Rp

Kg

Rp

Kg

Rp

Kg

Rp

m2

Rp

m2

Rp

Kg

Rp

Kg

Rp

Kg

Rp

Kg

Rp

Kg

Rp

Kg

Rp

Kg

Rp

Kg

Rp

btg

Rp

btg

Rp

btg

Rp

Bh

Rp

Bh

Rp

Bh

Rp

Bh

Rp

Bh

Rp

Bh

Rp

m2

Rp

Kg

Rp

Kg

Rp

lbr

Rp

bh

Rp

lbr

Rp

lbr

Rp

bh

Rp

bh

Rp

lbr

Rp

bh

Rp

lbr

Rp

bh

Rp

bh

Door Closer
Door Holder
Door Stop
Engsel Angin
Engsel Jendela
Engsel Pintu
Feltex 100% Wool - T - 21
Flincote / Meni Besi
Floor Hardener Ferrovax
Formika 4' x 3'
Formtie / penjaga jarak bekisting
Genteng Aspal
Genteng Beton
Genteng Bubung Kodok
Genteng Bubung Palentong
Genteng Decra Bond
Genteng Kodok
Genteng Metal
Genteng Palentong
Genteng Palentong Super

vinilex

Genteng Sirap
Gypsum
Ijuk
Jendela Besi
Jendela Besi Tahan Api
Jendela Nako
Kaca Buram
Kaca Cermin
Kaca Patri
Kaca Polos
Kaca Wireglass
Kait Angin
Kapur Padam
Kapur Sirih
Kaso 5 / 7 ( albasiah )
Kawat Beton
Kawat Burung
Kawat Duri
Kawat Harmonika
Kawat Kassa
Kawat Nyamuk
Kawat seng polos
Kayu Albasiah
Kayu Balok Borneo
Kayu Balok Damar Laut
Kayu Balok Jati
Kayu Kaso 5 / 7 (borneo)
Kayu Papan 3 / 20 borneo
Kayu Profil
Kayu Terentang
Keramik 10 x 20 cm
Keramik 15 x 15 cm
Keramik 20 x 20 cm
Keramik Artistik 10 x 20 cm
Keramik Artistik 5 x 20 cm
Kloset Duduk / Monoblok
Kloset Jongkok Porselen
Kloset Jongkok Teraso
Kompresor, Blasting Pot , Selang Dan Nozzle
Koral Beton
Kran Air
Kuas
Kunci Lemari
Kunci Selot
Kunci Tanam
Kunsi Silinder
Kunsi Tanam Antik
Kunsi Tanam Biasa
Kunsi Tanam Kamar Mandi
Lem
Lem Kayu
Lem Vinyl
List Kayu Profil
Lt. Vinyl Karet 30 x 30 kwl I

Rp

lbr

Rp

lbr

Rp

m3

Rp

m2

Rp

m2

Rp

bh

Rp

m2

Rp

m2

Rp

m2

Rp

m2

Rp

m2

Rp

Bh

Rp

m3

Rp

Kg

Rp

m3

Rp

Kg

Rp

m2

Rp

Kg

Rp

m2

Rp

m2

Rp

m2

Rp

Kg

Rp

m3

Rp

m3

Rp

m3

Rp

m3

Rp

m3

Rp

m3

Rp

m'

Rp

m3

Rp

Bh

Rp

Bh

Rp

Bh

Rp

Bh

Rp

Bh

Rp

bh

Rp

bh

Rp

bh

Rp

hr

Rp

m3

Rp

bh

Rp

Bh

Rp

Bh

Rp

Bh

Rp

bh

Rp

Bh

Rp

Bh

Rp

Bh

Rp

Bh

Rp

Kg

Rp

Lt

Rp

Kg

Rp

m'

Rp

bh

Marmer
Meni ( Read Lead ) A
Meni ( Read Lead ) B
Meni Besi
Minyak Bekisting
Minyak Cat
Mozaik 30 x 30 cm
Nok Paten
Nok standar 40 cm 18, swg 22
Nok Stel rata
Paku
Paku Biasa " - 1"
Paku Biasa " - 1" atau Sekrup

Rp

M2

Rp

Kg

Rp

Kg

Rp

Lt

Rp

lt

Rp

Kg

Rp

bh

Rp

lbr

Rp

m2

Rp

lbr

Rp

Kg

Rp

Kg

Rp

Kg

Paku Biasa 1/2" - 1"


Paku Biasa 2" - 5"
Paku Hak Pnjang 15 cm
Paku Hak Pnjang 15 cm
Paku Pancing 60 x 230
Paku Sekrup
Paku Skrup 3.5"
Papan Kayu Borneo
Papan Kayu Borneo tebal 3cm
Papan Kayu Jati
Papan Kayu Kamper
Papan Kayu Ramin
Parquet Jati
Pasir Beton
Pasir Pasang
Pasir Silika
Pasir Urug
Pasir Urug Darat
PC Warna
Pelat Asbes tebal 4 mm
Pelat Asbes tebal 5 mm
Pelitur
Pelitur Jadi
Pengencer
Perancah Kayu
Perekat
Pintu Allumunium
Pintu Besi Baja
Pintu gulung besi
Pintu Lipat
Pipa Beton
Pipa Galvanis
Pipa Tanah
Plamir
Plamuur Tembok
Plastic Aerator
Plint Keramik Artistik 10 x 10 cm
Plint Keramik Artistik 10 x 20 cm
Plint Keramik Artistik 5 x 20 cm
Plint Ubin PC Abu - abu 10 x 40 cm
Plint Ubin Granito 10 x 30 cm

Rp

Kg

Rp

Kg

Rp

Kg

Rp

Kg

Rp

Kg

Rp

Kg

Rp

Kg

Rp

m3

Rp

m3

Rp

m3

Rp

m3

Rp

lbr

Rp

m2

Rp

m3

Rp

m3

Rp

Kg

Rp

m3

Rp

m3

Rp

Kg

Rp

lbr

Rp

lbr

Rp

Ltr

Rp

Ltr

Rp

Ltr

Rp

m3

Rp

Kg

Rp

m2

Rp

m2

Rp

m2

Rp

m2

Rp

bh

Rp

m'

Rp

bh

Rp

Kg

Rp

Kg

Rp

Bh

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Plint Ubin Granito 10 x 40 cm


Plint Ubin PC Abu - abu 15 x 20 cm
Plint Ubin PC Abu -abu 10 x 30 cm
Plint Ubin PC Warna 10 x 20 cm
Plint Ubin PC Warna 10 x 30 cm
Plint Ubin PC Warna 10 x 40 cm
Plint Ubin Teralux Kerang 10 x 30 cm
Plint Ubin Teralux Kerang 10 x 40 cm
Plint Ubin Teralux Marmer 10 x 30 cm
Plint Ubin Teralux Marmer 10 x 40 cm
Plint Ubin Teralux Marmer 10 x 60 cm
Plint Ubin Teraso 10 x 30 cm
Plint Ubin Teraso 10 x 40 cm
Plywood 4 mm
Plywood 9 mm
Porselen ( 11 x 11 ) cm
Porselen 10 x 20 cm warna
Porselen 11 x 11 cm putih
Porselen 11 x 11 cm warna
Porselen 15 x 15 cm putih
Porselen 15 x 15 cm warna
Porselen 20 x 20 cm warna
Profil Alluminium " T "
Ramset / Dinabolt
Rapidrant
Rel Pintu Dorong
Residu
Residu atau Ter
Rolling Door
Roof Light Fiberglass
Sabun
Seal tape
Semen Abu -abu
Semen Merah
Semen Nat
Semen Portland
Semen Tanam Asam
Semen Warna
Seng Gelombang 3" x 6" BJLS 28
Seng Gelombang BJLS 32
Seng Plat
Seng Plat 3 x 6 BJLS 24
Seng Plat 3" x 6" BJLS 28
Sisalation / Alluminium Foil
Soda Api
Softboard 4' x 8' x 4mm
Spring Knip
Strorox - 100
Suncreen Allumunium
Tali Ijuk
Teak Oil
Teakwood 4' x 8' x 4mm
Terali Besi 2 x 3
Ubin Abu -abu 20 x 20 cm

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

lbr

Rp

lbr

Rp

bh

Rp

Bh

Rp

Bh

Rp

Bh

Rp

Bh

Rp

Bh

Rp

Bh

Rp

m'

Rp

bh

Rp

gln

Rp

Bh

Rp

Lt

Rp

Ltr

Rp

m2

Rp

lbr

Rp

Kg

Rp

bh

Rp

Kg

Rp

Kg

Rp

Kg

Rp

Kg

Rp

Kg

Rp

Kg

Rp

Lbr

Rp

lbr

Rp

lbr

Rp

Lbr

Rp

Lbr

Rp

m2

Rp

Kg

Rp

lbr

Rp

Bh

Rp

Kg

Rp

m2

Rp

Kg

Rp

Ltr

Rp

lbr

Rp

m'

Rp

bh

Ubin Abu -abu 30 x 30 cm


Ubin Abu -abu 40 x40 cm
Ubin Granito 30 x 30 cm
Ubin Granito 40 x 40 cm
Ubin Keramik 10 x 33 cm
Ubin Keramik 15 x 15 cm
Ubin Keramik 15 x 20 cm
Ubin Keramik 20 x 20 cm
Ubin Keramik 25 x 25 cm
Ubin Keramik 33 x 33 cm
Ubin Keramik 33 x 33 cm anti slip
Ubin Keramik 10 x 20 cm
Ubin Keramik Artistik 10 x 20 cm
Ubin Tahan Asam
Ubin Teralux Kerang 30 x 30 cm
Ubin Teralux Kerang 40 x 40 cm
Ubin Teralux Marmer 30 x 30 cm
Ubin Teralux Marmer 40 x 40 cm
Ubin Teralux Marmer 60 x 60 cm
Ubin Teraso 30 x 30 cm
Ubin Teraso 40 x 40 cm
Ubin Warna 20 x 20 cm
Ubin Warna 30 x 30 cm
Ubin Warna 40 x 40 cm
Underlyer, tebal 6 mm / Rubber Corrugated
Urinoir
Venetions Blinds
Vernis
Vinyl Asbes 30 x 30 cm
Vinyl Karet 30 x 30 cm KL I
Vinyl Karet 30 x 30 cm KL II
Vinyl Motif Kembang ex DN
Vinyl Wall Covering lebar 50 cm
Wall Paper
Water Drain + Asesories
Waterstop lebar 150 mm
Waterstop lebar 200 mm
Waterstop lebar 230 mm
Waterstop lebar 250 mm
Waterstop lebar 300 mm
Waterstop lebar 320 mm
Pipa Galvanis D 4"
Pipa PVC D 1/2"
Pipa PVC tipe AW "
Pipa PVC tipe AW 1"
Pipa PVC tipe AW 1"
Pipa PVC tipe AW 2"
Pipa PVC tipe AW 2"
Pipa PVC tipe AW 3"
Pipa PVC tipe AW 4"

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

m2

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

bh

Rp

m2

Rp

bh

Rp

m2

Rp

Ltr

Rp

Bh

Rp

Bh

Rp

Bh

Rp

Rp

Bh
m2

Rp

m3

Rp

set

Rp

m'

Rp

m'

Rp

m'

Rp

m'

Rp

m'

Rp

m'

Rp

m'

Rp

m'

Rp

m'

Rp

m'

Rp

m'

Rp

m'

Rp

m'

Rp

m'

Rp

m'

Das könnte Ihnen auch gefallen