RELATED DOCUMENT

TIE-IN LIST & INSTALLATION PROCEDURES

TIE-INS TYPES

Revision C1

ASHTART REVAMP ROJECT


14/02/2011

RT-02B-06A-21-45052

RELATED DOCUMENTS

Dismantling :

DW-02C-05A-21-23976
DW-02C-05A-21-23977
DW-02D-08A-21-23981

New installation :

DW-02C-05A-21-23888
DW-02C-05A-21-23889
DW-02D-08A 21-23876

Page 3 of 8

Revision C1

ASHTART REVAMP PROJECT


14/02/2011
Page 4 of 8

RT-02B-06A-21-45052
2

TIE-INS LIST & INSTALLATION PROCEDURE


Dismantl

New

EXISTING

NEW

Execution Type

Line Number

Line Number

Operation/shut-down & Installation Procedure

Upstream PSV 245

6 F 2014 11C V

V 245 Isolated, P245A/B locked off, drained and washed

Tie-in

Dia

Type

Cold

number

m.

/Hot

PP1-107

Cold

23976

C2b

23888

C2h

PP1-108

Cold

23976

C2b

23888

C2h

PP1-393

6"

Cold

23976

C2b

23888

C2h

6 11C

Insert spectacles

PP1-377

6"

Cold

23976

C2b

23888

C2h

6"-P 245 A Suction

6 P 2121 11C V

PP1-378

6"

Cold

23976

C2b

23888

C2h

6"-P 245 B Suction

6 P 2121 11C V

PP1-397

6"

Cold

23976

C2b

23888

C2h

6 11C

Insert spectacles

PP1-389

2"

Cold

23976

C2b

23888

C2h

2"-11C

3 P 2125 11C V

PP1-390

3"

12

Cold

23976

C2b

23888

C2h

3"-11C

PP1-391

3"

12

Cold

23976

C2b

23888

C2h

3"-11C

3 11C Blind
flange
3 11C Blind
flange

PP1-392

3"

Cold

23976

C2b

23888

C2h

3 11C

3 P 2125 11C V

PP1-394

4"

Cold

23976

C2b

23888

C2h

4 11C

Insert spectacles

PP1-395

3"

Cold

23976

C2b

23888

C2h

4 11C

3 P 2125 11C V

P&ID

Rev.

Installat

Rev.

P&ID

Gas outlet V245 to


V130

6 F 2014 11C V

Replace the old spool by the new spool 6-F2014-11C-V and


insertion of the spectacle blind

V 245 Isolated/ P245A/B locked off, drained and washed


Replace the old spool by the new spool 6-F2121-11C-V and
insertion of the spectacle blind & new filter F245 B

V 245 Isolated/ P245A/B locked off, drained and washed


Replace the old spools discharge PSV245A/B by the new spool 3F2125-11C-V between tie-ins 394, 395, 389 & 392
Insertion of the spectacle blind at tie-in 394 & install the 3 blind
flanges RF 150# at tie-ins 390 & 391

Revision C1

ASHTART REVAMP PROJECT


14/02/2011
Page 5 of 8

RT-02B-06A-21-45052
Dismantl

New

Tie-in

Dia

Type

Cold

number

m.

/Hot

PP1-396

6"

Cold

23976

C2b

23888

PP1-131

Cold

23976

C2b

PF3-133

Cold

23976

PF3-134

Cold

23976

P&ID

EXISTING

NEW

Execution Type

Line Number

Line Number

Operation/shut-down & Installation Procedure

C2h

6 11C

Insert spectacles

Replace V245 inlet spool by news one with spectacle blind

23888

C2h

6 Discharge PSV245

2 F 2045 11C V

C2b

23888

C2h

6 Collector to V200

2 F 2045 11C V

C2b

23888

C2h

6 Collector to V200

2 F 2045 11C V

Rev.

Installat

Rev.

P&ID

V 240 Isolated, P540A/B locked off, drained, purged & washed


Dismantle the spools at gas outlet to DS 900/905.
Do the new re-routing by installing the new lines:

PP1-345

12

Cold

23976

C2b

23888

C2h

BLIND FLANGE
11C

PP1-346

Hot

23976

C2b

23888

C2h

4 F 2012-11C V

PP1-380

6"

Hot

23976

C2b

23888

C2h

10"-F222-11A

6 F 2123 11C V

PP1-381

6"

10

Cold

23976

C2b

23888

C2h

6"-11C

4 F 2012 11C V

PP1-382

6"

Cold

23976

C2b

23888

C2h

6"-11C

6 F 2123 11C V

PP1-386

4"

Cold

23976

C2b

23888

C2h

6"-11C

Insert F 240 A

PP1-387

6"

Cold

23976

C2b

23888

C2h

6"-11C

6P 2126 11C V

PP1-388

4"

Cold

23976

C2b

23888

C2h

4"-11C

P 540B Suction

2-F2045-11C-V between Tie-ins131, 133, 134 & PSV 055

4-F2012-11C-V between Tie-ins 346 & 381.

6-F2123-11C-V between Tie-in 380 & 382.

Install 4 blind flange at Tie-in 345

V 240 Isolated, P 540 A&B Isolated & locked off, drained, purged
and washed. Dismantle the old V240 outlet to P540 A/B.
Install the new V240 condensate outlet 6-P2126-11C-V between
Tie-in PP1-387, 386 & 388 by installing the inlet strainers at each
P540 A/B

Revision C1

ASHTART REVAMP PROJECT


14/02/2011
Page 6 of 8

RT-02B-06A-21-45052

Tie-in

Dia

Type

Cold

number

m.

/Hot

PP1-137

Cold

PP1-159

Cold

Dismantl
P&ID

New
Rev.

N
23976

23976

Installat

Rev.

P&ID
C2b

C2b

23888

23888

C2h

C2h

EXISTING

NEW

Execution Type

Line Number

Line Number

Operation/shut-down & Installation Procedure

4 P 2021 11C V

PFC Total SD, V 240, V245, V270 & V250 isolated, P245 A/B, P540

Outlet P 540 to
PC1/PC2
Discharge P240 to
2nd stage sep

A/B,P570 A/B & P520 locked off


4 P 2021 11C V

Close all supplier V170, V670 & V200 to the 4 condensate header,
Close the discharge line to PC1/PC2 from P540 & P570 A/B. Close

PP1-172

12

Cold

23977

C2c

23889

C2e

3 11C

3 11C Blind Flange

PP1-182

Cold

23976

C2b

23888

C2h

6 11A

6 P2024 11C V

PP1-201

Cold

23976

C2b

23888

C2h

2-11C

Insert 51 FT 051

the discharge valve of P 520 to discharge of all Closed drain pumps.


Close All branches communicate with P245/540 &570 discharge to
the 2

nd

stage separators V130/V630. Depress, Drain & wash

Dismantle V240 inlet line between Tie-in PP1-182-432 & 434.


Dismantle the piece of spool on 4 condensate header between

PP1-284

Cold

23976

C2b

23888

C2h

From P 520

4 P 2021-11C V

PP1-293

Cold

23976

C2b

23888

C2h

D/S LCV 245

4 P 2021 11C V

PP2-408

3"

Hot

23981

C2a

23876

C2b

3 Purge D690/695

3 DR 2122 11C V

PP1-432

Cold

23976

C2b

23888

C2h

V 240 INLET

6 P 2024 11C V

PP1-434

Cold

23976

C2b

23888

C2h

V 240 INLET

6 P2024 11C V

PP1-438

Hot

23976

C2b

23888

C2h

4 Collector

2 P2026 11C V

Tie-ins PP1-438, 439 & 440


Dismantle the discharge manifold of C E pumps to 2

nd

stage and

PC1/PC2 between Tie-ins 137,159, 201, 284 & 293.


Dismantle the condensate outlet of D690/D695 to V250 between
Tie-ins PP2-408 & PP1-172.
Install the new lines 3-DR 2122-11C with branch & valve VBR 2036
, 2-P 2054-11C to PSV 55/56 between Tie-ins PP1-182, 432, 434 &
PP2-408. Install 3 11C blind flange at Tie-in PP1-172
The 4-P2021-11C with FE 051 between Tie-ins 137, 159, 201, 284

PP1-439

Cold

23976

C2b

23888

C2h

4 Collector

2 P2026 11C V

PP1-440

Cold

23976

C2b

23888

C2h

4 Collector

2 P2026 11C V

& 293
Install the new line 4-P2026-11C between Tie-ins 438, 439 & 440

Revision C1

ASHTART REVAMP PROJECT


14/02/2011
Page 7 of 8

RT-02B-06A-21-45052
Dismantl

New

Tie-in

Dia

Type

Cold

number

m.

/Hot

PP1-199

Cold

23976

C2b

23888

PP1-241

Cold

23976

C2b

PP1-242

Cold

23976

PP1-375

4"

Cold

PP1-376

4"

PP1-398

PP1-435
PP1-437

EXISTING

NEW

Execution Type

Line Number

Line Number

Operation/shut-down & Installation Procedure

C2h

2-11A P270A/B

2 P 2023 11C V

V 270 Isolated, P 570 A&B isolated & locked off. Depressurize,

23888

C2h

V270 gas outlet

4 F 2059 11C V

Dismantle the V270 condensate outlet to P570 A/B between Tie-ins

C2b

23888

C2h

V270 gas outlet

4 F 2059 11C V

PP1-375, 376 & 398

23976

C2b

23888

C2h

4"-P 570 A Suction

4 P 2120 11C V

Cold

23976

C2b

23888

C2h

4"-P 570 B Suction

4 P 2120 11C V

Cold

23976

C2b

23888

C2h

6 11C

4 P 2120 11C V

Cold

23976

C2b

23888

C2h

P570A Discharge

2 P2023 11C V

Cold

23976

C2b

23888

C2h

P570B Discharge

P&ID

Rev.

Installat

Rev.

P&ID

drain and wash

Dismantle the P570 A/B discharge collector between Tie-ins PP1199, 435 & 437
Dismantle the 4 gas outlet spool between Tie-ins PP1-241 & 242
Install the new gas outlet line 4-F2059-11C between PP1-241 &242
Install the New V270 outlet to P570 ,4-P2120-11C with new
strainers between Tie-ins PP1-375, 376 & 398
Install the new P570 discharge collector 2-P2023-11C with new FE

2 P2023 11C V

between Tie-ins PP1-199, 435 & 437

Revision C1

ASHTART REVAMP PROJECT


14/02/2011

RT-02B-06A-21-45052

Page 8 of 8

Das könnte Ihnen auch gefallen