1 Precautions ..............................................................................................................................................2
2 Tools for Installation .............................................................................................................................3
3 Outline and Structure.............................................................................................................................4
4 Installing the Lifting eyes.....................................................................................................................5
5 Adjust the Position of the MDF (optional)........................................................................................6
6 Installing the Cabinet on a Concrete Pedestal (reshell)..................................................................7
6.1 Plan Space for the cabinet..............................................................................................................................................7
6.2 Constructing the concrete pedestal................................................................................................................................8
6.3 Installing the Cabinet Base Frame.................................................................................................................................9
6.4 Installing the Passive Cabinet......................................................................................................................................10
6.5 Fixing the CCC rack(optional).....................................................................................................................................11
6.6 Installing the Active Cabinet.......................................................................................................................................12
6.7 Installing the Waterproof Module................................................................................................................................13
9 Installing Batteries................................................................................................................................20
10 Checking the Cabinet Installation ..................................................................................................21
11 Powering On the Device....................................................................................................................22
12 Sealing the Cabinet.............................................................................................................................23
13 MDF Label............................................................................................................................................24
Precautions
NOTE
This document aims to provide simple and distinctive guidelines for hardware installation.
This document does not describe operations for the pre-delivery installation of the internal cables and so on. Instead, this document
describers only the operations for on-site installation.
Electrostatic Discharge
Before touching the device, or holding the boards and IC chips, wear the ESD gloves or the ESD wrist strap to prevent the
electrostatic discharge of the human body from damaging the sensitive components. Ensure that the other end of the ESD
wrist strap is well grounded.
Bundling cables
The distance between cable ties or fiber binding straps inside the cabinet should be within 250 mm. (For subscriber
cablethe distance is 200 mm. )
After routing the cable, affix the label or fasten the tag to the cable, and 20 mm away from the connector.
After the label for the signal cable is affixed to the signal cable, the rectangular text area of the label should face
rightwards or downwards.
After the identification plate for the power cable is affixed to the power cable, the text area of the plate should face
rightwards or downwards. Ensure that the side affixed with the label faces outwards.
Tape measure
Philips screwdriver
Flathead screwdriver
Adjustable wrench
Socket wrench
Percussion drill
Claw hammer
Diagonal pliers
Hydraulic crimper
Cable cutter
Wire stripper
Wire cutter
Multimeter
Rubber hammer
10
11
12
13
Routing Cables
14
Routing Cables
15
Routing Cables
16
17
18
19
Installing Batteries
20
No.
Requirement
Method
The cabinet components are installed correctly. The cabinet door shall have no distortion.
The boards can be plugged and unplugged without difficulty. Installation of self-made
components shall comply with the requirements.
Observe
The cabinet is installed reliably, satisfying the quakeproof requirements in the project
file.
Observe
Observe the
installation site
All cable apertures are sealed well, including apertures for power cables, ground cable,
optical cable, and external subscriber cables.
Observe
The external positive lead and positive lead of battery are correctly and reliably
connected to the power system.
Test with a
multimeter
Observe
Observe
The power cable and ground cable adopt a whole segment of copper core. The cable has
no joint in the middle or scratch on the skin.
Observe
10
The cross sectional area of the power cable and that of the ground cable comply with the
project file, satisfying the power distribution requirements of the cabinet.
Observe
11
Optical fiber headers and board optical ports to be used are protected with protective
caps. If necessary, clean them in compliance with Huawei regulations.
Observe
12
Cables outside the cabinet are buried underground if possible. If they are routed through
the cabling rack, the lightning proof measures shall be adopted.
Observe
21
22
23
MDF Label