Sie sind auf Seite 1von 3

Industrial Property Questionnaire

Name of Company

Plant Location (Street, City, and County)

Mailing Address (Office of Record)

Tax Representative and Telephone Number

Mail Report to: State of Washington


Department of Revenue Property Tax Division PO Box 47471 Olympia, WA 98504-7471

Attn:

REV 61 0060-1 (6/21/06)

Industrial Data Analysis


1

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11.

Duration of the supply of raw material in relationship to economic life of plant. Advantage of location for delivery of raw material and conversion products. Advantage of location for delivery of finished products. Competitive position. Stability of service or product. (Highly speculative) Adaptability of plant buildings to another use. Labor supply and quality. Water supply. Adequate control of pollutants. Communitys regard for this industry. Technological position of plant. (Are there developments in the market today which will do away with this product or service?) Diversification of market. (Is the company controlled in selling product to one or two larger manufacturers or dealers?) (1) suggests a GOOD position (2) suggests ADEQUATE with some concern (3) suggests FAIR with adjustments necessary (4) suggests POOR with possibility of closure in near future

12.

Key:

Asset Questions
13. 14. 15. 16.

Are land improvements such as landscaping, walks, rail spurs, etc., included in the asset report? Are assets, which have been abandoned in place or fully depreciated, included in the asset report? Are there assets such as self manufactured equipment not identified the asset report? Yes

Yes Yes No

No No

Does the asset report include smaller items of personal property i.e. office equipment, mobile equipment, etc.? Yes No Are spare parts expensed or capitalized? as of January. 1? If expensed, what is the cost or estimated value

17.

18.

What is the cost of the average supply inventory (those items not held for resale or used as an ingredient in the manufacture of products)? $ Do you have other expensed equipment? Yes No. If Yes, what is the threshold for expensing equip? $ What is the average amount expensed each year? $ Do you have any leased assets not included in the asset report? Yes No $

19.

20. 21.

If there is building construction in progress as of January 1, what is the total cost to date? What is the estimated completion date?

REV 61 0060-2 (6/21/06)

Schedule 1 Rated And Actual Plant Capacities


Year Product Average number of shifts/24 hour period Equipment manufacturers rating of capacity per shift Average production employees per shift Actual production per shift Product Average number of shifts/24 hour period Equipment manufacturers rating of capacity per shift Average production employees per shift Actual production per shift Product Average number of shifts/24 hour period Equipment manufacturers rating of capacity per shift Average production employees per shift Actual production per shift Product Average number of shifts/24 hour period Equipment manufacturers rating of capacity per shift Average production employees per shift Actual production per shift Product Average number of shifts/24 hour period Equipment manufacturers rating of capacity per shift Average production employees per shift Actual production per shift
REV 61 0060-3 (6/21/06) _______ _______ _______ _______ _______