AREVA NP
AREVA NP
To deliver multiple EPR new builds in UK, AREVA needs a strong UK supply chain Start UK, then go global as an AREVA supplier
AREVA NP
AREVA NP
AREVA NP
AREVA NP
AREVA NP
AREVA NP
Areva
Scope of supply: NI
AREVA NP
Turbine Island is managed by a partner (could be in a Consortium) Civil Works could be managed by Partners
There are various Project Schemes which could be applied creating several potential Customers for UK Suppliers!
10
AREVA NP
10
Design services
Project management and associated activities Identification of potential supplier partners as early as possible
11
AREVA NP
11
For non safety related product/services but important for installation (Class 3 & NC impacting schedule, cost, availability): Compliance with ISO9001-2000
12
AREVA NP
12
Procurement Methodology
Definition of the request for tender file Qualification of potential suppliers (Approved Vendor List)
Definition of the contract to the selected Supplier(s) Implementation of the contract by the Supplier Delivery of the product manufactured by the Supplier to our Customer
13
AREVA NP
13
Phase 1
Phase 2
Phase 3
Phase 4 Time
AREVA NP
14
Be on-time
Supplier should have a proven reputation for on-time delivery
The Supplier should have project management capabilities for the scope of supply
15
AREVA NP
15
16
AREVA NP
16
AREVA NP
17
18
AREVA NP
18
Waste Management Equipment (starting from Conceptual Design, provided by AREVA including Installation)
19
AREVA NP
19
AREVA NP
20
21
AREVA NP
21
AREVA NP
22
23
AREVA NP
23
24
AREVA NP
24
Quality requirements in UK
HSE requirements are expressed in the Safety Assessment Principles (2006 edition - revision1)
Leadership and management for safety (SAP MS.1) quality management system shall be used to ensure that safety is being maintained and improved reference to international standards
AREVA NP
25
26
AREVA NP
26
27
AREVA NP
27
28
AREVA NP
28
29
AREVA NP
29
AREVA NP
30
31 AREVA NP 31 AREVA NP
31
Why?
To assess the capability of a supplier to fulfill AREVA requirements applicable to products and services for nuclear power plants
A prerequisite
to product qualification and for placing purchase order
32
AREVA NP
32
Pre-selection Pre-selection
Review based on suppliers answer to our questionnaire Assessment by AREVA NP QA team Supplier proposes improvement action plan
STEP 2
assessment assessment
On-site On-site
STEP 3
Suppliers Suppliers
STEP 4
Review by Review by
AREVA NP AREVA NP
AREVA NP
A cooperative attitude
34
AREVA NP
34
Summary
35
AREVA NP
35 35
36
AREVA NP
36
Table of contents
37
AREVA NP
37
The context
Safe and reliable NPPs worldwide require the selection of the right match of Equipment and Supplier
AREVA NP
38
Equipment specifications
Introduction 1. Scope 2. Definitions 3. Documentation 4. Design 5. Materials 6. Manufacturing 7. Operability 8. Requirements for Auxiliary Systems, Venting, Drains, Integral Supports
39
AREVA NP
39
Quality requirements
Rules depend upon the safety level and public safety impact of the equipment:
International IAEA rules National laws Owners own Quality & Inspection requirements AREVAs QM requirements & Surveillance requirements of detailed design and manufacturing
40
AREVA NP
40
ASME Code
Section III
41
AREVA NP
41
Classification
ASME Sect.III NB+ ASME+ Sect. III NC RCC-M Sect. I Subs. B supplemented when needed
+:
Class 1
Class 2
Class 3
or ASME
or National
NC
42
Harmonized Standards: EN 13445, 13480, National Industrial Standards: ASME VIII, AD-M, BS, CODAP,
42
AREVA NP
For the majority of all other equipment (Class 2, 3 and Non Classified):
AREVA current practice is to open its specifications to the possible alternatives: ASME or RCCM or European Standards
43
AREVA NP
43
Table of contents
44
AREVA NP
44
g in ow gr
Qualified suppliers & new design
ct e oj pr
isk r
AREVA NP
45
46
AREVA NP
46
March 2009
1.Sourcing 1.Sourcing
April 2009
No-Go
Go
Timescale
No-Go
Go
No-Go
Go
4. 4. Qualification Qualification
2011/2012
47
AREVA NP
AREVA NP
48
Conclusion
Supplier Qualification helps set up trustworthy and long term relationships between all the actors in the Supply Chain Such proven confidence is the best asset for the safety and success of the Nuclear Industry Thank you for your attention
49
AREVA NP
49
Conclusion
Laurent-Olivier Coudeyre UK Supply Chain Coordinator
50
AREVA NP
50
UK nuclear new build is an opportunity for the UK supply chain To deliver multiple EPR new builds in UK, AREVA needs a strong UK supply chain
We Need You!
Start UK, then go global as an AREVA supplier
51
AREVA NP
51
Next Milestones:
Project:
By Spring, which Clients & Sites By Autumn, which Vendors By Christmas, which Consortia
Supply Chain: RFI starting Q2/2009 Suppliers Selection Pre assessment visits
On-going process
52
AREVA NP
52
Dedicated website
http://suppliers.areva.com/UK_supply_chain_EPR
53
AREVA NP
53
54
AREVA NP
54